What is the AGL control-system architecture?

The chain that lets an operator switch the lights and see how they are doing: commands travel down to the regulators, status travels back up.

BLOCK DIAGRAM · COMMANDS DOWN, STATUS BACK UP CONTROL POSITIONtower or operator panel CONTROL & MONITORING SYSTEMlogic, interlocks, display COMMUNICATIONS NETWORKfibre / Ethernet, often redundant SUBSTATION CONTROLLERlocal logic and remote I/O CCRsset the brightness step per circuit COMMANDSon / off, brightness step STATUScircuit state, faults, alarms SERIES CIRCUITS → LIGHTS WHAT THE SYSTEM DOES COMMANDon/off and brightness step downward FEEDBACKstatus and faults reported upward LOCAL MODEmanual control if the network fails SAFETY LOGICstop-bar and lead-on interlocks SCHEMATIC · REAL SYSTEMS DIFFER IN LAYERS, REDUNDANCY AND PROTOCOLS · NOT A DESIGN
commands (down)
status (up)
lights
The Fact Control & monitoring

An AGL control system is a chain of layers. An operator at the control position sends a command to the control and monitoring system, which passes it over a communications network to a substation controller. That controller tells the CCRs to set the brightness step or switch the circuit, and the CCRs feed the series circuits and the lights.

Information flows both ways. Commands go down, and status, faults and alarms come back up so the operator and maintenance staff can see the state of every circuit. Because losing control of the lights matters to operations, designs commonly add redundant paths and a local manual mode at the substation, plus interlocks for functions such as stop bars and lead-on lighting.

Control path

Operator to CCR. Commands such as on, off and brightness step.

Monitoring path

CCR back to operator. Circuit status, faults and alarms.

Layers Control position, C&M system, network, local controller, CCR
Commands Down: on/off, brightness step, special controls
Feedback Up: status, faults, alarms
Resilience Redundant paths and a local manual mode (typical)
End of chain CCRs supplying series circuits
Reference ICAO Annex 14 Vol. I Ch. 8 · ICAO Doc 9157 Pt 5 · FAA AC 150/5345-56
Schematic — real systems differ in layers, redundancy and communication protocols. Follow the project specification and the applicable standard (ICAO / FAA).
Entry 29 · Earthing network Entry 31 · Complete AGL system architecture

Frequently Asked Questions

Q1What is an AGL control-system architecture?

The arrangement of equipment that lets an operator switch airfield lights and set their brightness, and see their status. It links a control position, a control and monitoring system, a communications network, local controllers and the constant-current regulators.

Q2What are the main layers of the architecture?

The control position (for example in the tower), the central control and monitoring system, the communications network, substation or local controllers, and the CCRs that supply the series circuits. Commands travel down this chain and status comes back up.

Q3What does the control system send to the lights?

Commands such as circuit on or off and the brightness step, and for selected circuits specific settings such as stop-bar or lead-on control. Each CCR sets the current of its series circuit to match the selected step.

Q4What does the monitoring side report?

Circuit status, brightness step, regulator faults and alarms, and depending on the design circuit-level insulation or lamp-outage information. This feedback lets operators and maintenance staff see problems early.

Q5Why is the network often redundant?

Because losing control of the lights affects operations. Many designs use duplicated servers, a ring or dual network, and a local manual mode at the substation so lights can still be controlled if the network or control position fails.

Q6Where are the requirements defined?

In ICAO Annex 14 Volume I (electrical systems) and the Aerodrome Design Manual Part 5, and for FAA-regulated airports in FAA AC 150/5345-56 (lighting control and monitoring systems). Always confirm against the current edition and the project specification.

Precision AGL Academy

See It. Understand It. Then Learn How to Engineer It.

Recognising an AGL system visually is the first step. The next step is knowing how to design, install, test, commission and maintain them correctly.

Build Practical AGL Engineering Skills

Go deeper with structured training from Precision AGL Academy, covering:

AGL Fundamentals Design & Electrical Engineering Approach Lighting Photometry Installation & Commissioning Maintenance & Troubleshooting

Learn how each light, sign and circuit works as part of a complete airport lighting system, not just as an isolated diagram.

See. Understand. Apply. Engineer.