What are cable ducts?

The buried conduits that carry AGL cable across the airfield. They are laid with the civil works, so the route, depth and spare ways have to be agreed before the trench closes.

CROSS-SECTION · A DUCT BANK UNDER PAVEMENT PAVEMENT WARNING TAPE ABOVE CONCRETE ENCASEMENT (WHERE REQUIRED) DUCT WITH CABLE SPARE WAY (EMPTY) COMPACTED BEDDING AND BACKFILL WHERE CIVIL MEETS AGL 1 ROUTE & DEPTH Set from the cable-route design 2 SPARE WAYS Room to add or replace cable 3 ENCASEMENT Bedding, concrete, warning tape 4 CROSSINGS Pavement, drains, other services 5 CHAMBER ENTRIES Ends aligned to handholes and pits
cable in duct
duct and encasement
The Fact Civil interface

Cable ducts are buried conduits, usually plastic or concrete-encased, that carry AGL cable along its route. Cable is pulled through them between handholes, pits and cans, and can be replaced or added to without breaking the surface.

They are a civil interface because they are laid in trench or duct bank with the pavement and drainage works. The route, depth, bedding, encasement, crossings and spare ways must be agreed with the civil team before the trench is closed, and each duct end must line up with its chamber entry.

Duct

Protected way for pulling and replacing cable, usually in a duct bank.

Direct-buried cable

Cable laid straight in the ground, harder to replace and more exposed to damage.

RoleProtect cable and allow it to be pulled, replaced or added
Civil sideTrench, depth, bedding, encasement, backfill and crossings
AGL sideRoute, duct count and size, spare ways, chamber entries
ProtectionWarning tape above, concrete where required
ChambersHandholes and pits at turns, crossings and long pulls
ReferenceFAA AC 150/5370-10 (Item L-110) · ICAO Doc 9157 Pt 5
Schematic — duct counts, sizes, depths and encasement differ between projects and standards. Follow the project specification and the applicable standard (ICAO / FAA). Cable in a duct may be on a live series circuit: isolate, lock out and prove dead before cutting, pulling or jointing.
Entry 3 · Handholes Entry 5 · Cable trenches

Frequently Asked Questions

Q1What are cable ducts in airfield ground lighting?

Buried conduits, usually plastic or concrete-encased, that carry AGL cables along a route. They protect cable from damage and allow it to be pulled in, replaced or added to without digging up the surface.

Q2Why are cable ducts a civil interface?

They are laid in trench or duct bank with the civil works, often under pavement, roads and drainage. Route, depth, bedding, encasement, crossings and spare ways must be agreed with the civil team before the trench is closed.

Q3Why include spare ducts?

Spare ways let cable be added or replaced later without breaking pavement again. Their number and size depend on the project and the owner's future plans.

Q4How do ducts relate to handholes?

Ducts run between handholes, pits and cans. Handholes sit at direction changes, crossings and long pulls so cable can be pulled and joined, and each duct end must line up with its chamber entry.

Q5How should ducts be protected?

By correct depth, bedding and backfill, concrete encasement where required, and warning tape above. Where ducts cross pavement or drains, the civil design sets the crossing method.

Q6Where are the requirements defined?

FAA AC 150/5370-10 and AC 150/5345-42 cover related items, and ICAO Aerodrome Design Manual Part 5 covers electrical systems. Confirm against the current edition and project specifications.

Precision AGL Academy

See It. Understand It. Then Learn How to Engineer It.

Recognising an AGL system visually is the first step. The next step is knowing how to design, install, test, commission and maintain them correctly.

Build Practical AGL Engineering Skills

Go deeper with structured training from Precision AGL Academy, covering:

AGL Fundamentals Design & Electrical Engineering Approach Lighting Photometry Installation & Commissioning Maintenance & Troubleshooting