Station generation, centreline/crossbar/side-row/SFL quantity, geometry validation and compliance dashboard for an approach lighting system (ALS).

About this calculator

This calculator does not maintain an ALS type database — it does not select ALSF-2, MALSR, SSALR, or a specific ICAO configuration for you, and it does not derive required length or station spacing from approach category alone. Those numbers are figure- and system-specific and must come from the applicable approved specification. What this calculator does is take the station spacing, required/available length, and per-station component pattern you enter, and turn them into a validated station schedule, quantity summary, and compliance dashboard — the same generic station-and-shared-fixture discipline as the earlier calculators, applied to a longer and more complex system.

Quick start

Standard & Runway Information

Rule note

This calculator does not mix ICAO and FAA geometry internally — it doesn't compute either one. This selection only labels the report; all geometry below is entered directly.

Rule note

ALS-A and ALS-B are separate systems and are never assumed identical. Selecting "Both" flags that this calculator computes one system per session — run it again with Threshold B's parameters for ALS-B.

ALS Requirement & Type

Rule note

This calculator does not infer ALS requirement from category or RVR alone — select the status per the approved project specification / regulatory requirement.

Rule note

This calculator does not maintain a database of ALS type geometries — entering a type name here does not auto-populate length, spacing, or component counts. All geometry below must be entered from the approved specification for the named system.

Approach-Lighting Length

Rule note

Per the applicable approved ALS type specification — not derived from category here.

Rule note

Physically constructible length given site/land constraints. Stations are generated up to the lesser of the required and available lengths, so surplus land is never counted as lit.

Station & Spacing Engine

Rule note

Standard-specific — never use an arbitrary universal tolerance; confirm against the applicable specification.

Component Configuration

Rule note

Total lights per crossbar = 2 × this value (symmetrical about centreline).

Rule note

One flashing unit per listed station — reported separately from steady-burning lights.

Site Constraints

This calculation determines nominal ALS geometry and quantities from the values entered above. Final approach-lighting design must be verified against the approved aerodrome lighting layout, applicable regulatory requirements, obstacle limitations and project specifications.
FAQ

Approach Lighting System (ALS) Quantity Calculator: Frequently Asked Questions

Quick answers on station generation, quantities and validation for an approach lighting system.

What does the ALS Quantity Calculator do?

It takes the station spacing, required and available length, and per-station component pattern that you enter, and turns them into a validated station schedule, a quantity summary and a compliance dashboard. It does not maintain an ALS type database. It does not select ALSF-2, MALSR, SSALR or a specific ICAO configuration for you, and it does not derive required length or station spacing from approach category alone.

Why must I enter the geometry myself?

Those numbers are figure- and system-specific and must come from the applicable approved specification. The design standard selection and the ALS type name only label the report. The tool does not mix ICAO and FAA geometry internally, and it does not infer whether an ALS is required from category or RVR.

How are the stations generated?

Station positions are the first station distance plus the station number times the spacing, measured from the threshold at distance 0. The number of stations is the available length minus the first station distance, divided by the spacing, rounded down, plus one. Stations are generated up to the lesser of the required and available lengths, so surplus land is never counted as lit.

How is the quantity calculated?

The total is the centreline lights, plus the crossbar lights, plus the side-row lights, plus the sequenced flashing lights. A crossbar is a station property with two times the lights per side, symmetrical about the centreline. Side-row lights apply only across the configured station range and side-row mode. Steady-burning and flashing units are kept separate, because they have different equipment, control circuits and serviceability requirements.

What happens if the available length is short or the area is restricted?

If the available length is less than the required length, the configuration is flagged for review and a length deficit is shown, and it is never silently treated as compliant. Marking the approach area Restricted never produces an automatic approval or a modified geometry, and always returns an engineering-review flag.

How are both approach directions handled?

ALS-A and ALS-B are separate systems and are never assumed identical, even on the same runway. The calculator computes one direction per session, so run it again with the other threshold's parameters. The threshold reference is the same as in Calculator #05, so a combined layout schedule stays consistent.

What field checks does it offer?

There are three optional checks. Longitudinal spacing is checked interval by interval against the nominal spacing plus or minus a tolerance, centreline alignment compares one measured offset against a tolerance you supply, and crossbar symmetry compares the left and right extents of each crossbar against a tolerance. None of these tolerances is hard-coded, because they are standard-specific.

Is the result a final design or BOQ?

No. It gives calculated nominal quantities and not a final BOQ quantity. Final approach-lighting design must be verified against the approved aerodrome lighting layout, applicable regulatory requirements, obstacle limitations and project specifications.