1Case Study Overview
During a scheduled preventive maintenance program, the electrical maintenance team performed insulation resistance testing on a runway edge lighting circuit.
The circuit remained operational, and the Constant Current Regulator (CCR) was maintaining the selected current. However, the insulation resistance measurement was significantly lower than the airport's historical maintenance values.
No visible cable damage was observed, and no field lights had yet failed.
The investigation ultimately identified progressive insulation degradation in one underground cable section caused by moisture contamination and aging of the insulation system.
This case demonstrates that low insulation resistance is often an early warning indicator of developing underground electrical failures.
2Learning Objectives
After completing this case study, the learner should be able to:
- Understand the significance of insulation resistance in AGL systems.
- Interpret low IR test results.
- Differentiate localized insulation deterioration from circuit-wide degradation.
- Apply sectional IR testing procedures.
- Investigate moisture-related insulation failures.
- Interpret IR trend data.
- Perform post-repair insulation verification.
3System Background
The AGL primary circuit consists of:
Insulation resistance testing evaluates the integrity of the cable and connected insulation system.
A healthy circuit typically exhibits high insulation resistance, while deterioration may indicate:
- Moisture ingress.
- Cable insulation aging.
- Damaged cable sheath.
- Contaminated connectors.
- Defective cable joints.
- Transformer insulation deterioration.
- Earth leakage paths.
IR testing is primarily a predictive maintenance tool.
4Problem Statement
The reported condition was:
- Circuit operational.
- No CCR alarm.
- Low insulation resistance.
- Recent monsoon conditions.
- Historical IR values previously satisfactory.
- No visible excavation damage.
Is the low insulation resistance caused by cable deterioration, moisture ingress, transformer insulation problems, or multiple distributed defects?
5Initial Observations
| CCR status | Healthy |
| Selected current | 6.6 A |
| Circuit operation | Normal |
| Insulation resistance | 12 MΩ |
| Historical IR | Greater than 500 MΩ |
| Weather | Monsoon season |
| Visible damage | None |
The most important observation was the large reduction from historical insulation resistance values.
6Initial Engineering Hypotheses
The maintenance team considered:
Underground cable moisture ingress.
Cable-joint insulation deterioration.
Transformer insulation failure.
Distributed moisture contamination.
Test procedure or measurement error.
7Insulation Resistance Principle
Insulation resistance testing measures leakage current through the insulation system.
A reduction in IR generally indicates increased leakage paths.
Typical interpretation:
| Very high | Healthy insulation |
| Moderately reduced | Early deterioration |
| Low | Significant contamination or insulation degradation |
| Very low | Serious insulation failure or earth leakage |
Trend analysis is usually more valuable than a single measurement.
8Test Equipment
The investigation used:
- 5 kV insulation resistance tester.
- True-RMS multimeter.
- Approved AGL circuit test equipment.
- Cable sectional isolation equipment.
- Circuit drawings.
- Historical maintenance records.
- Airport-approved PPE.
Testing was performed after approved circuit isolation.
9Investigation
Step 1: Verify Test Procedure
The team confirmed:
- Circuit isolated.
- Connected equipment identified.
- Test voltage appropriate.
- Instrument calibration valid.
- Test duration correct.
The measurement was confirmed as valid.
Step 2: Review Historical Trend
Maintenance records showed:
| 12 months earlier | Greater than 1000 MΩ |
| 6 months earlier | 650 MΩ |
| 3 months earlier | 180 MΩ |
| Current | 12 MΩ |
The progressive decline strongly indicated developing insulation deterioration.
Step 3: Sectional Isolation Testing
The circuit was divided into sections.
Results:
| CCR to S1 | Greater than 500 MΩ |
| S1 to S2 | 15 MΩ |
| S2 to S3 | Greater than 500 MΩ |
The low insulation resistance was localized to Section S1–S2.
Step 4: Transformer Isolation
Transformers in the affected section were disconnected sequentially. The insulation resistance remained low. This eliminated the transformers as the primary cause.
Step 5: Cable Investigation
Excavation of the affected cable section revealed:
- Moisture-saturated soil.
- Damaged cable sheath.
- Water migration.
- Insulation discoloration.
- Early electrical tracking.
The cable insulation had absorbed moisture over an extended period.
10Root Cause
A damaged cable sheath allowed long-term moisture ingress into the underground primary cable.
The moisture progressively reduced insulation resistance, creating increasing leakage current and a developing insulation failure. The fault had not yet progressed to a complete earth fault or open circuit.
11Corrective Action
The maintenance team:
- Isolated the circuit.
- Removed the affected cable section.
- Replaced the damaged cable.
- Installed new approved cable joints.
- Repaired sheath protection.
- Improved drainage conditions.
- Performed insulation resistance testing.
- Conducted continuity testing.
- Restored the circuit.
- Established periodic IR trend monitoring.
12Post-Repair Verification
The insulation resistance returned to a healthy range after cable replacement.
13Root-Cause Analysis
Low insulation resistance detected.
Valid measurement.
Progressive deterioration.
Affected cable section localized.
Transformers eliminated.
Moisture damage identified.
Water-ingress-related cable insulation deterioration.
Replace cable and improve environmental protection.
14Why This Case Was Important
Low insulation resistance is often the earliest detectable electrical warning in an underground AGL circuit.
If ignored, it may progress to:
- Earth faults.
- Cable failure.
- Connector damage.
- Transformer stress.
- CCR protection operation.
- Operational lighting outages.
Early detection can significantly reduce repair costs.
15Engineering Lessons
IR trends are essential predictive data.
Insulation resistance trends are essential predictive-maintenance data.
Circuits can operate despite serious deterioration.
A circuit can remain operational despite serious insulation deterioration.
Sectional testing is critical.
Sectional testing is critical for fault localization.
Moisture is a major IR reducer.
Moisture ingress is a major cause of underground IR reduction.
Isolate transformers during IR investigations.
Transformers should be isolated during IR investigations to avoid incorrect conclusions.
16Engineer's Decision Point
You observe: Circuit operating normally. CCR healthy. Insulation resistance reduced from 600 MΩ to 15 MΩ over several months. What should you investigate first?
17Knowledge Check
18Interview Questions
19Frequently Asked Questions
Quick answers about low insulation resistance in an AGL circuit, based on this case study.
Q1What is AGL-CS-011?
AGL-CS-011 is an engineering training case study on a predictive-maintenance investigation in which low insulation resistance revealed progressive cable insulation deterioration before any light had failed. It is an engineering simulation created for training, not a report of an actual airport incident.
Q2Can a circuit have low insulation resistance and still operate normally?
Yes. In this case the circuit was operational, the CCR was maintaining current and no lights had failed, yet insulation resistance was well below the airport's historical values. The fault had not yet progressed to an earth fault or open circuit.
Q3What was the root cause?
A damaged cable sheath allowed long-term moisture ingress into the underground primary cable. The moisture progressively reduced insulation resistance and created increasing leakage current and a developing insulation failure.
Q4Why is sectional insulation resistance testing recommended?
Sectional testing localizes the insulation degradation, so the affected cable section can be investigated and repaired instead of replacing components blindly. It is the recommended step when a circuit shows a significant IR decline but no visible damage.
Q5Why are IR trends important for predictive maintenance?
Insulation resistance trends are essential predictive-maintenance data. A reading compared with historical values shows deterioration long before an operational failure occurs.
Q6How was the circuit repaired?
The team isolated the circuit, removed the affected cable section, replaced the damaged cable and installed new approved joints. They repaired sheath protection, improved drainage, tested insulation resistance and continuity, restored the circuit and set up periodic IR trend monitoring.
Q7What did post-repair verification show?
Insulation resistance returned to greater than 1000 MΩ, with normal leakage current, continuity and CCR operation, and the field lights operational.
Q8What should you do if insulation resistance falls from 600 MΩ to 15 MΩ over several months but the circuit still works?
Perform sectional insulation resistance testing to localize the deterioration. Increasing CCR current, replacing light fittings or replacing the CCR is not the right response.
Engineering & Expert Notes
A Passing Circuit Can Still Be on a Downward Path
TrendingInsulation resistance falling year on year is a maintenance trigger even when each reading meets the limit in use.
Section the Circuit to Find the Weak Length
LocalisationTesting in sections identifies where the leakage lies and avoids replacing healthy cable.
Record Temperature and Humidity With Every Reading
ConditionsInsulation values vary with conditions. Without them, trends can mislead.
Plan the Repair Before the Fault Becomes an Outage
PlanningA scheduled repair under controlled conditions is cheaper and safer than an emergency during operations.
20Case Study Conclusion
Low insulation resistance is often a progressive underground insulation deterioration problem that should be investigated before operational failures occur.
Systematic IR trend analysis, sectional isolation, cable investigation, and moisture assessment can identify developing insulation failures at an early stage, allowing corrective action before earth faults, cable breakdown, or circuit outages occur.
In AGL engineering, insulation resistance is one of the most powerful indicators of the long-term health of the underground electrical network.
Turn Case Studies Into Engineering Capability
A case study shows you how a problem is investigated. Precision AGL Academy helps you build the knowledge to understand why it happens, diagnose it systematically, and apply the right engineering approach.
Study real-world-style engineering scenarios, identify failure patterns, understand root causes, and develop a systematic approach to AGL troubleshooting.
Study the case. Understand the system. Build the skill.
Follow the Academy
Important Notice, Disclaimer & Limitation of Liability
Please read before relying on any content on this page or on any record downloaded from it.
- Purpose and intended users. This page is an independent educational and informational reference for competent, suitably trained and authorised airfield ground lighting (AGL) and aerodrome electrical personnel. It is not professional engineering, legal or regulatory advice, and using it does not create any professional or client relationship.
- Fictional training simulation. This case study is an engineering simulation created for training. It is not a report of an actual airport incident. Scenarios, sequences, dates, readings, measurements, outcomes and numerical values are illustrative and invented for teaching. No fault, failure, cause or liability is attributed to any person, company, airport, regulator, manufacturer or product, and any resemblance to a real event is coincidental. The content is not a forensic, legal, insurance, regulatory or accident-investigation finding and must not be cited as evidence, as a record of an event, or as a basis for disciplinary, contractual, insurance or legal action.
- Safety. Work on series circuits, constant current regulators (CCRs), isolating transformers, cables, connectors and control equipment can be fatal. Always apply the aerodrome’s permit-to-work and isolation/LOTO procedures, prove dead, use correctly rated instruments and PPE, and follow the manufacturer’s instructions. Nothing here authorises work on live equipment or the bypassing of any safety device or interlock. Where a case narrates an inspection, measurement or test, that narrative is not an instruction or an endorsement of the method.
- Values, test results and acceptance. Test voltages, insulation-resistance and current values, tolerances, thresholds, photometric and angular figures and pass/fail or “acceptable” wording in a case are specific to its invented scenario. They are not acceptance criteria, limits or targets. Use the project specification, the applicable standard and the manufacturer’s data for real work. Completing or following a case produces no test certificate, calibration record, acceptance or evidence of compliance.
- Aviation operations. Nothing here authorises return to service, a change of operating category (CAT I/II/III), a NOTAM, a flight inspection outcome or any aerodrome certification decision. These rest with the aerodrome operator, the air navigation service provider and the competent regulator.
- Standards and regulations. References to ICAO, FAA, IEC, IEEE, ISO and other standards are for orientation only. They are summarised, may be incomplete or out of date, and standards are revised from time to time. Consult the current official editions. Following this content does not guarantee compliance with any law, standard or regulatory approval. Official documents, regulations and manufacturers’ instructions always prevail.
- Learning aids. Knowledge checks, decision points, interview questions, FAQs and suggested answers are teaching aids with illustrative answers. They are not an assessment, certification, accreditation or competency or authorisation to work on any aerodrome, and they do not predict or guarantee the outcome of any job interview or application.
- Generic content; no warranty. Diagnostic sequences, cause rankings, tolerances and values are generic and indicative; real installations differ in design, equipment make and model, age and condition. Content is provided “as is” and “as available”, without warranty of any kind, express or implied, including accuracy, completeness, currency or fitness for a particular purpose.
- Limitation of liability. To the fullest extent permitted by applicable law, Precision AGL Academy and its owners, authors and contributors are not liable for any injury, death, loss, damage, downtime, penalty or regulatory consequence, whether direct or indirect, arising from the use of, reliance on, or inability to use this content. Nothing in this notice excludes or limits any liability that cannot lawfully be excluded or limited.
- Independence and trademarks. This is an independent publication, not affiliated with or endorsed by ICAO, the FAA, the IEC, DGCA, any airport, regulator or equipment manufacturer. Third-party names, standard designations and trademarks belong to their respective owners and are used for identification only.
- Copyright and use. © 2026 Precision AGL Academy. All rights reserved. You may read this page and use it for personal reference and internal training, keeping this notice attached. Any other copying, republication, redistribution, scraping or commercial use requires our prior written permission.
- Corrections. Content is reviewed periodically, with no obligation to update. To report an error, safety concern or rights issue, write to precisionaglsolutions@gmail.com.