CCR CONTROL · COMMAND, DECISION, OUTPUT, FEEDBACK A REMOTE COMMAND IS NOT ISOLATION · CCR OUTPUT CAN BE HAZARDOUS 1 ALCMS Operator command On, off, brightness step ROLE: sends 2 LINK Hardwired or network Interface to the CCR ROLE: carries 3 CCR CONTROLLER Selector and checks Remote only; interlocks, protection ROLE: decides 4 CCR OUTPUT Series circuit supply Current follows the step ROLE: delivers FEEDBACK · STATE · STEP · CURRENT · FAULTS COMMANDS ON, OFF, STEP What the ALCMS typically sends; other commands only where the project supports FEEDBACK CONFIRM, DO NOT ASSUME On/off, step, output current, local or remote state, faults and alarms SAFEGUARD LOCAL IGNORES REMOTE CCR in local does not obey remote commands; still isolate before work THE CCR ACTS ONLY IF ITS SELECTOR IS SET TO REMOTE · THEN CONFIRM THE FEEDBACK SCHEMATIC · SIMPLIFIED · NOT TO SCALE
command path
feedback path
fallback
The Fact CCR control

CCR control is how the ALCMS or a control panel operates a constant current regulator. The ALCMS sends a command, typically on, off or a brightness step, over a hardwired or network link to the CCR controller. The controller decides whether to act, and the CCR output then supplies the series circuit with the current for the selected step.

Two points matter in use. First, the CCR does not blindly obey: it acts only if its selector is set to remote and interlocks and protection allow it. A CCR in local ignores remote commands. Second, the feedback (state, step, output current and faults) is how the operator confirms the result. A remote command is a control action, not isolation. The circuit still has to be isolated, locked out and proved dead before work.

  1. Command. The operator selects on, off or a brightness step on the ALCMS screen.
  2. Link. The command is carried to the CCR over a hardwired or network connection.
  3. Decision. The CCR controller acts only if the selector is on remote and interlocks and protection allow it.
  4. Output. The CCR sets the series circuit current to match the selected step.
  5. Feedback. State, step, output current and any fault return to the ALCMS.
  6. Confirm. The operator checks that the feedback matches the command before relying on it.
This entry

CCR control from the ALCMS side: the commands sent, the decision at the CCR and the feedback returned.

CCR & Power Supply entries

The regulator itself: controller, steps and local and remote control. See CCR control architecture.

Purpose Operate a constant current regulator from the ALCMS and read back its state
Typical commands On, off and brightness step; others only where the project supports them
Decision at the CCR Selector on remote; interlocks and protection must allow the command
Typical feedback On/off, step, output current, local or remote state, faults and alarms
Safeguard CCR in local ignores remote commands; a remote command is not isolation
Reference ICAO Annex 14 Vol I Ch 8; Doc 9157 Pt 5; project specification
Schematic — simplified for clarity. Command sets, interlocks, interfaces and behaviour vary by airport and are set by the project specification, the applicable standard and the manufacturers’ documentation. Always follow your site’s isolation and permit-to-work procedure.
Entry 2 · AGL control architecture Entry 4 · Local control

Frequently Asked Questions

Q1What is CCR control?

The way the ALCMS or a control panel switches a constant current regulator on and off and selects its brightness step, and reads back its state. The CCR controller receives the command, decides whether to act, and sets the output current for the selected step.

Q2What can the ALCMS command on a CCR?

Typically on and off, and the brightness step. Some systems also pass other commands, such as a fault reset, where the CCR and the project support them. What is available is set by the project specification and the CCR manufacturer.

Q3Does the CCR always obey a remote command?

No. The CCR controller acts only if the command is allowed. In most designs the local, off and remote selector must be set to remote, and protection or interlock conditions must permit it. A CCR in local ignores remote commands.

Q4What does the CCR report back?

Typically whether it is on or off, the selected brightness step, the output current, the local or remote state and any fault or alarm. This feedback lets the operator confirm that the circuit is doing what was asked, rather than assuming it.

Q5Is a remote off command the same as isolating the circuit?

No. A remote command is a control action, not isolation. Before anyone works on the CCR or its series circuit it must be isolated, locked out and proved dead under the permit-to-work, even if the screen shows the circuit off.

Q6How is CCR control different from the CCR entries in the CCR and Power Supply division?

Those entries describe the regulator itself, such as its controller, local and remote control and brightness steps. This entry looks at it from the ALCMS side: the commands sent, the decision at the CCR and the feedback returned.

Precision AGL Academy

See It. Understand It. Then Learn How to Engineer It.

Recognising an AGL system visually is the first step. The next step is knowing how to design, install, test, commission and maintain them correctly.

Build Practical AGL Engineering Skills

Go deeper with structured training from Precision AGL Academy, covering:

AGL Fundamentals Design & Electrical Engineering Approach Lighting Photometry Installation & Commissioning Maintenance & Troubleshooting

Learn how each light, sign and circuit works as part of a complete airport lighting system, not just as an isolated diagram.

See. Understand. Apply. Engineer.