Testing, Maintenance & Troubleshooting Comparison

PREVENTIVE VS PREDICTIVE

Two maintenance philosophies for AGL systems — preventive maintenance is performed at planned time or usage intervals to reduce the probability of failure, while predictive maintenance uses actual equipment-condition data and trend analysis to determine when maintenance is genuinely needed. Preventive asks "when does the schedule say to service it?" Predictive asks "what does the equipment's condition say?"

At a Glance

Feature Preventive Maintenance Predictive Maintenance
BasisTime / operating hours / cyclesActual equipment condition
Main objectivePrevent likely failuresPredict failure before it occurs
TriggerScheduled intervalCondition/trend reaches a limit
Data requirementRelatively lowHigher
Sensors / monitoringNot always requiredOften required
Maintenance timingFixed or predefinedCondition-dependent
Unnecessary maintenancePossibleGenerally reduced
Initial costLowerHigher
Technical complexityLowerHigher
AGL exampleReplace lamp every defined intervalReplace/inspect based on measured degradation
Time-Based
Preventive Trigger
Condition-Based
Predictive Trigger

Preventive Maintenance

Preventive maintenance asks: "When should we service this equipment according to the maintenance schedule?" The work is performed at a predefined interval, even if the equipment is currently operating normally.

INSTALLATION
     │
     ▼
  OPERATING
     │
     ▼
SCHEDULED INTERVAL
     │
     ▼
 MAINTENANCE
     │
     ▼
RETURN TO SERVICE
     │
     ▼
 NEXT INTERVAL

Example — a 12-month AGL fixture service: clean the optical system, inspect connections, check alignment, and replace specified components on schedule.

Predictive Maintenance

Predictive maintenance asks: "What is the actual condition of this equipment, and when is maintenance likely to become necessary?" Data is collected, trended, and used to plan work before an operational failure occurs.

  EQUIPMENT
      │
      ▼
MEASURE CONDITION
      │
      ▼
 COLLECT DATA
      │
      ▼
 ANALYSE TREND
      │
      ▼
PREDICT DEGRADATION
      │
      ▼
PLAN MAINTENANCE

Example — a CCR trended on output current, temperature, alarm history, operating hours, and component condition, with maintenance planned once the trend analysis flags a concern.

Calendar-Driven vs Deterioration-Driven

PREVENTIVE
TIME
 │
 ├─────────┬─────────┬─────────
           │         │
        SERVICE   SERVICE   SERVICE
PREDICTIVE
CONDITION
 │
 │       /
 │      /
 │     /
 │____/____________ TIME
       ↑
  MAINTENANCE
   REQUIRED

Easy memory: Preventive = maintain based on time or usage. Predictive = maintain based on condition and trends.

Simple, Schedulable, Low-Complexity

Preventive maintenance is the practical baseline for most AGL systems because it is simple to plan, easy for maintenance teams to implement, and does not depend on sensors or monitoring infrastructure. The main trade-off is that equipment may be serviced earlier than actually necessary.

Targeted, Data-Driven, Condition-Aware

Predictive maintenance becomes valuable where CCRs, LED fixtures, control systems, or other critical equipment can provide sufficient condition data to identify degradation before it becomes an operational failure. It generally reduces unnecessary replacement and makes better use of remaining equipment life, at the cost of higher technical complexity.

CCR Cooling Fan

Preventive Approach

EVERY 12 MONTHS
       │
       ▼
INSPECT / SERVICE FAN

It makes no difference whether the fan has logged 2,000, 4,000, or 6,000 operating hours — the maintenance occurs according to the schedule.

Predictive Approach

FAN CONDITION
     │
     ├── Vibration
     ├── Temperature
     ├── Current
     └── Noise
          │
          ▼
      TREND ↑
          │
          ▼
BEARING DEGRADATION
    SUSPECTED
          │
          ▼
 PLAN REPLACEMENT

Maintenance is performed once the monitored condition indicates that degradation is actually developing.

Runway Light

Preventive Approach

RUNWAY LIGHT
     │
     ▼
SCHEDULED INSPECTION
     │
     ▼
  CLEAN LENS
     │
     ▼
CHECK ALIGNMENT
     │
     ▼
CHECK CONNECTIONS

The work is performed at predefined intervals regardless of the fixture's current output.

Predictive Approach

LIGHT OUTPUT
     │
    100%
     ↓
    98%
     ↓
    95%
     ↓
    92%
     ↓
TREND ANALYSIS

A declining output trend can flag maintenance before the light reaches an unacceptable condition. Exact acceptance limits must come from the applicable project/maintenance criteria.

Predictive ≠ Preventive

Predictive maintenance is actually a condition-based maintenance approach — a distinct branch from preventive within the broader maintenance hierarchy.

MAINTENANCE
     │
     ├── Corrective
     │      │
     │      ▼
     │  After failure/defect
     │
     ├── Preventive
     │      │
     │      ▼
     │  Time / usage based
     │
     └── Predictive
            │
            ▼
        Condition / trend based

Key point: all predictive maintenance is proactive, but not all preventive maintenance is predictive.

Equipment-by-Equipment View

AGL Equipment Preventive Maintenance Predictive Maintenance
Runway lightScheduled cleaning/inspectionPhotometric degradation trend
Taxiway lightScheduled inspectionOutput/condition trend
CCRScheduled servicingTemperature/current/alarm trends
Isolation transformerPeriodic testingCondition monitoring where available
Control panelScheduled inspectionAlarm/event trend analysis
AGL cable circuitPeriodic electrical testingInsulation/condition trend where monitored
LED fixtureScheduled inspectionLED output/thermal degradation trend

Myths vs Facts

Myth: Predictive maintenance replaces preventive maintenance entirely
Fact

Preventive maintenance remains the practical baseline for most AGL equipment. Predictive maintenance is generally layered on top for critical equipment where sufficient condition data is available, not used as a wholesale replacement.

Myth: Preventive maintenance is an outdated approach
Fact

Preventive maintenance is simple, low-cost, and easy to implement consistently. It remains appropriate wherever monitoring infrastructure is not justified or available.

Myth: Predictive maintenance is always cheaper overall
Fact

Predictive maintenance can reduce unnecessary replacement and unplanned downtime, but it carries a higher initial investment in sensors, monitoring, and trained personnel for data analysis.

Myth: Every piece of AGL equipment needs predictive maintenance
Fact

Predictive maintenance becomes valuable specifically where equipment can provide sufficient condition data to identify degradation trends — not as a default requirement across every component.

Full Engineering Parameters

Parameter Preventive Maintenance Predictive Maintenance
Maintenance triggerTime/usageCondition
Failure preventionYesYes
Condition monitoringOptionalCentral to approach
Data analysisLimitedImportant
Fixed intervalYesNot necessarily
Initial investmentLowerHigher
Technical complexityLowerHigher
Maintenance efficiencyGoodPotentially better
Equipment utilizationMay be lowerPotentially higher
Unplanned failure riskReducedCan be further reduced

Choosing the Right Strategy

DOES THE EQUIPMENT PROVIDE
SUFFICIENT CONDITION DATA TO
IDENTIFY DEGRADATION TRENDS?
              │
       ┌──────┴──────┐
       │             │
      YES            NO
       │             │
       ▼             ▼
  PREDICTIVE     PREVENTIVE
 MAINTENANCE     MAINTENANCE
  MAY BE          REMAINS THE
 JUSTIFIED       PRACTICAL BASELINE

The final selection depends on:

Preventive vs Predictive Maintenance

Engineering Verdict

Preventive maintenance is planned maintenance performed at defined time, usage, or operating intervals to reduce the probability of failure.

Predictive maintenance is condition-based maintenance using measurements, monitoring, and trend analysis to identify when maintenance is actually needed. For AGL systems, preventive maintenance is generally the practical baseline, while predictive maintenance becomes valuable where CCRs, LED fixtures, control systems, or other critical equipment provide sufficient condition data to identify degradation before an operational failure occurs.

Preventive"Service it before the scheduled failure risk becomes high."
Predictive"Monitor its condition and service it when the data shows deterioration."

Predictive maintenance does not eliminate the need for preventive maintenance — most AGL maintenance programs combine both, applying preventive scheduling as the baseline and predictive monitoring where condition data justifies it.

Engineering & Expert Notes

Collect Reliable Data Before Relying on Predictions
Data

Predictive methods need trustworthy measurements.

Keep a Basic Preventive Plan as a Safety Net
Fallback

Do not drop schedules until predictions are proven.

Set Action Thresholds in Advance
Management

Define what triggers work.

Review Results Regularly
Improvement

Update the approach with experience.

Frequently Asked Questions

What is the fundamental difference between preventive and predictive maintenance?

Preventive maintenance is performed at planned time or usage intervals regardless of actual condition, while predictive maintenance uses measured equipment condition and trend analysis to decide when maintenance is needed.

Does predictive maintenance always reduce cost?

Not necessarily overall. It can reduce unnecessary replacement and unplanned downtime, but it also requires a higher initial investment in sensors, monitoring systems, and trained analysis personnel.

Is predictive maintenance the same as condition-based maintenance?

Predictive maintenance is a condition-based maintenance approach — it uses condition and trend data rather than a calendar to determine when maintenance is needed.

Can preventive and predictive maintenance be used together?

Yes. Most practical AGL maintenance programs use preventive maintenance as the baseline schedule and add predictive monitoring for critical equipment where sufficient condition data is available.

Which AGL equipment typically benefits most from predictive maintenance?

Equipment that can provide continuous or periodic condition data — such as CCRs, LED fixtures, and control systems — is best positioned to benefit, since trend analysis depends on having that data.

Does preventive maintenance guarantee equipment won't fail between services?

No. Preventive maintenance reduces the probability of failure but is not condition-aware, so a fault developing between scheduled intervals may not be caught until the next inspection or until it causes an operational issue.

Governing Documents

For an actual project design, always verify the current edition of the applicable documents.

ICAO Annex 14, Volume I

Aerodrome Design and Operations — general maintenance provisions for visual aids and AGL systems.

ICAO Doc 9137, Part 9

Airport Services Manual, Part 9 — Airport Maintenance Practices, including scheduled and condition-based approaches.

FAA AC 150/5340-26

Maintenance of Airport Visual Aid Facilities — reference framework for scheduled inspection and maintenance of AGL equipment.

DGCA / AAI Requirements

For Indian airport projects, also verify applicable DGCA requirements, AAI requirements, airport-specific maintenance manuals and contract specifications.

The exact interval, monitoring scope, and acceptance limits for any AGL maintenance program must come from the governing standard, the airport's approved maintenance manual, and manufacturer recommendations — not from a general comparison.

Precision AGL Academy

Compare the Systems. Then Learn How to Engineer Them.

Understanding the difference between AGL systems is the first step. The next step is knowing how to design, install, test, commission and maintain them correctly.

Build Practical AGL Engineering Skills

Go deeper with structured training from Precision AGL Academy, covering:

AGL Fundamentals Design & Electrical Engineering Approach Lighting Photometry Installation & Commissioning Maintenance & Troubleshooting

Learn how AGL systems work as part of a complete airport lighting system, not just as individual components or configurations.

Compare. Understand. Apply. Engineer.

Continue Exploring