Earthing, lightning, and surge protection fault diagnosis across the AGL system — earth resistance, bonding, and grid continuity faults; direct and induced lightning damage; surge protection device failure and repeated/recurring SPD failure; surge-induced damage to CCRs, LED fixtures, and communication links; and earthing-referenced nuisance alarms and ground potential difference problems between separately earthed points. Each topic follows the full engineering diagnostic record: symptom → observation → measurement → decision → fault location → root cause → verification → corrective action → preventive action.
Symptom — A scheduled or fault-investigation earth resistance test on an AGL earth electrode or grid returns a value above the design/regulatory threshold, without any equipment fault yet reported.
Individual earth electrode, earth rod group, or the CCR/base-can earthing grid, as measured at the earth pit or test link.
Re-test using the correct method after any corrective action, and confirm the reading is stable and within threshold across at least two independent measurements.
SOP: SOP-ELS-01 (Earth Resistance Test Procedure), SOP-CCR-04 (CCR LOTO Procedure)
Standards: IEEE 80, IS 3043 (earthing code of practice), ICAO Annex 14 Vol I
Diagram: Earthing/Grounding As-Built Drawing
Case Study: Division 25 — Field Case Study Troubleshooting
Symptom — An individual item of AGL equipment (CCR cabinet, transformer housing, base can, or fixture body) is found to have an earth connection that does not meet design resistance or continuity requirements, even though the site's main earth grid tests acceptably.
Equipment earth bonding conductor from the item in question back to the nearest earth grid connection point or electrode.
After repair, re-test the bonding conductor's continuity/resistance and confirm it meets the design requirement, and visually confirm a sound mechanical connection at both ends.
SOP: SOP-ELS-02 (Equipment Earth Bond Verification Procedure), SOP-CCR-04 (CCR LOTO Procedure)
Standards: IS 3043, IEC 60364, ICAO Annex 14 Vol I
Diagram: Equipment Earthing Schedule
Case Study: Division 01 — CCR Troubleshooting (cabinet earthing)
Symptom — An earth conductor that was previously intact is found to be physically broken or completely separated, removing that path from the earthing system entirely, whether or not it has yet caused a reported symptom.
Earth conductor between an electrode, bonding point, or equipment and the rest of the earthing grid.
After repair, re-test end-to-end continuity and overall earth resistance, and confirm the reading is restored to its expected baseline value.
SOP: SOP-ELS-03 (Earth Conductor Fault Location and Repair Procedure), SOP-CCR-04 (CCR LOTO Procedure)
Standards: IS 3043, IEC 60364, ICAO Annex 14 Vol I
Diagram: Earthing/Grounding As-Built Drawing
Case Study: Division 25 — Field Case Study Troubleshooting
Symptom — An earth conductor termination — at an electrode, bonding bar, equipment lug, or test link — is mechanically loose, giving an inconsistent or marginal continuity/resistance reading depending on how the connection happens to be seated at the time of test.
Earth conductor termination point at an electrode, earth bar, equipment earth stud, or test/disconnect link.
After re-torquing or replacement, re-test continuity/resistance and confirm the reading is stable across repeated gentle flexing of the connection.
SOP: SOP-ELS-04 (Earth Termination Inspection and Torque Procedure), SOP-CCR-04 (CCR LOTO Procedure)
Standards: IS 3043, IEC 60364
Diagram: Earthing/Grounding As-Built Drawing
Case Study: Division 25 — Field Case Study Troubleshooting
Symptom — An earth conductor, electrode, or termination shows visible corrosion, and testing confirms an elevated resistance or continuity reading attributable to the corrosion reducing effective contact area.
Earth electrode, conductor, or termination point, particularly at below-grade or moisture-exposed locations.
After cleaning/protection or replacement, re-test continuity/resistance and confirm the reading is restored to within the acceptable range, and re-inspect at the next scheduled cycle to confirm corrosion has not progressed further.
SOP: SOP-ELS-05 (Earth Connection Corrosion Assessment Procedure), SOP-CCR-04 (CCR LOTO Procedure)
Standards: IS 3043, IEEE 80, IEC 60364
Diagram: Earthing/Grounding As-Built Drawing with Soil Data
Case Study: Division 25 — Field Case Study Troubleshooting
Symptom — Testing of the earthing grid as a whole (multiple electrodes and bonding conductors intended to act as a single low-resistance network) reveals that one or more sections are not electrically continuous with the rest of the grid, even though individual electrodes may test acceptably in isolation.
Complete earthing grid — all electrodes, bonding conductors, and interconnections intended to form a single equipotential network.
After repair, re-test continuity between every grid section and confirm the whole grid behaves as a single low-resistance network, then re-test overall earth resistance.
SOP: SOP-ELS-06 (Earth Grid Continuity Test Procedure), SOP-CCR-04 (CCR LOTO Procedure)
Standards: IEEE 80, IS 3043, ICAO Annex 14 Vol I
Diagram: Earthing/Grounding As-Built Drawing
Case Study: Division 25 — Field Case Study Troubleshooting
Symptom — AGL equipment (CCR, transformer, fixture, cabling, or associated control/monitoring equipment) shows physical or electrical damage consistent with a direct or nearby lightning strike, typically following a known thunderstorm event at the site.
Any AGL equipment within the affected circuit(s) or area, plus the associated earthing and surge protection system.
After repair/replacement, re-test all affected equipment individually and the full circuit as a whole, and confirm SPDs on the circuit are in a serviceable, indicating-good condition before returning to service.
SOP: SOP-ELS-07 (Post-Lightning-Event Inspection Procedure), SOP-CCR-04 (CCR LOTO Procedure)
Standards: IEC 62305 (lightning protection), IEEE 80, ICAO Annex 14 Vol I, FAA AC 150/5340-30
Diagram: Lightning Protection and Surge Coordination Drawing
Case Study: Division 24 — Complete Runway Lighting Failure
Symptom — A surge protection device (SPD) installed on an AGL circuit or panel is found to have failed — either in an open/disconnected state (no longer providing protection) or in a shorted/failed-short state (potentially causing a nuisance trip or continuous fault current).
Individual SPD unit installed at the CCR panel, distribution point, or field equipment location.
After replacement, confirm the new SPD's status indicator shows serviceable/good, and verify correct installation (polarity, torque, and connection to the earthing system) before returning the circuit to service.
SOP: SOP-ELS-08 (SPD Inspection and Replacement Procedure), SOP-CCR-04 (CCR LOTO Procedure)
Standards: IEC 61643 (surge protective devices), IEC 62305, ICAO Annex 14 Vol I
Diagram: Surge Protection Coordination Drawing
Case Study: Division 01 — CCR Troubleshooting (panel-level SPDs)
Symptom — The same SPD location fails and is replaced more than once within a period that is short relative to its expected service life, indicating a recurring or ongoing condition rather than a single isolated surge event.
SPD location with a documented history of repeated failure, plus the associated circuit, earthing, and surge coordination scheme.
After addressing the identified systemic cause, monitor the SPD's status over subsequent storm events and confirm it survives events of a severity comparable to those that previously caused failure.
SOP: SOP-ELS-09 (Repeated SPD Failure Investigation Procedure), SOP-ELS-08 (SPD Inspection and Replacement Procedure)
Standards: IEC 61643, IEC 62305, IEEE 80
Diagram: Surge Protection Coordination Drawing
Case Study: Division 25 — Field Case Study Troubleshooting
Symptom — A CCR (or a specific card/module within it) fails in a manner consistent with a surge/transient event — for example a damaged output stage, failed control card, or tripped protection — typically following a lightning event or switching transient on the connected circuit(s).
CCR power stage, control/regulation card, and any internal SPD or transient protection fitted within the CCR cabinet.
After repair, confirm the CCR operates correctly across its full range of outputs/intensity steps, and verify both field-circuit and mains-side surge protection are in a confirmed serviceable state before returning to service.
SOP: SOP-ELS-10 (CCR Surge Damage Investigation Procedure), SOP-CCR-04 (CCR LOTO Procedure)
Standards: IEC 61643, FAA AC 150/5345-10, IEC 62305
Diagram: CCR Internal Wiring and Surge Protection Diagram
Case Study: Division 01 — CCR Troubleshooting
Symptom — One or more LED-based fixtures fail in a manner consistent with a transient/surge event — for example a damaged LED driver, failed LED array, or fixture that will not respond to any commanded intensity step — typically following a storm event on the circuit.
LED fixture driver/power supply module and LED array, plus the isolation transformer and connector serving the fixture.
After replacement, re-energise the circuit and confirm the fixture operates correctly at all commanded intensity steps, and check neighbouring fixtures on the same circuit for any related but less obvious damage.
SOP: SOP-ELS-11 (LED Fixture Surge Damage Investigation Procedure), SOP-CCR-04 (CCR LOTO Procedure)
Standards: IEC 61643, FAA AC 150/5345-46, IEC 62305
Diagram: LED Fixture Internal Wiring Diagram
Case Study: Division 24 — Complete Runway Lighting Failure
Symptom — A communication/monitoring link associated with the AGL system — for example ALCMS data links, CCR remote monitoring, or field sensor communication — fails or shows corrupted/intermittent data following a storm event, without necessarily any associated lighting circuit fault.
Communication interface cards, data cabling, and any dedicated data-line surge protection at both ends of the affected link.
After repair, confirm the communication link operates correctly with stable, uncorrupted data over an extended monitoring period, and verify data-line surge protection status at both ends.
SOP: SOP-ELS-12 (Communication Link Surge Damage Investigation Procedure), SOP-CCR-04 (CCR LOTO Procedure)
Standards: IEC 61643, IEC 62305, relevant ALCMS/communication interface manufacturer standards
Diagram: System Communication Architecture Diagram
Case Study: Division 01 — CCR Troubleshooting (remote monitoring interface)
Symptom — A section of AGL primary or communication cable is found damaged or with degraded insulation in a pattern consistent with a lightning-induced transient having passed through or near it, distinct from the mechanical or ageing-related cable faults covered elsewhere in the Atlas.
Series circuit primary cable or communication cable in the vicinity of a known or suspected lightning event.
After repair, re-megger the full cable run and confirm insulation resistance is restored above the acceptable threshold at every previously identified damage point.
SOP: SOP-ELS-13 (Lightning-Induced Cable Fault Investigation Procedure), SOP-SCF-09 (Cable Fault Location and Repair Procedure)
Standards: IEC 62305, IEC 60364, ICAO Annex 14 Vol I
Diagram: Cable Route Drawing with Earthing Grid Overlay
Case Study: Division 25 — Field Case Study Troubleshooting
Symptom — A CCR earth-fault/ground-fault protection trip, or another earthing-referenced alarm, occurs without a genuine insulation or earth fault being present anywhere on the circuit when tested, indicating the alarm itself is being triggered by an earthing system characteristic rather than a real fault.
CCR earth-fault/ground-fault monitoring circuit and its own reference earth connection, plus the protection setting/threshold configuration.
After corrective action, monitor the circuit over subsequent operating cycles at all intensity steps and confirm no further nuisance trips occur, while re-confirming periodically that the circuit remains genuinely fault-free.
SOP: SOP-ELS-14 (Earth-Fault Nuisance Trip Investigation Procedure), SOP-CCR-04 (CCR LOTO Procedure)
Standards: FAA AC 150/5345-10, IEC 60364, IS 3043
Diagram: CCR Protection Setting and Reference Earth Diagram
Case Study: Division 01 — CCR Troubleshooting (protection trip investigation)
Symptom — Two points in the AGL system that are expected to be at, or close to, the same earth potential are found to have a measurable voltage difference between them, particularly during fault, switching, or surge events, causing nuisance trips, communication errors, or equipment stress at the interface between the two points.
Two or more separately earthed points within the AGL system — for example a CCR cabinet and a remote field cabinet, or two buildings/structures with independent earthing systems interconnected by cable.
After corrective action, re-measure the ground potential difference under representative conditions and confirm it is reduced to within a safe, acceptable margin for the equipment and personnel exposed to it.
SOP: SOP-ELS-15 (Ground Potential Difference Assessment Procedure), SOP-ELS-06 (Earth Grid Continuity Test Procedure)
Standards: IEEE 80, IEC 62305, IS 3043
Diagram: Earthing/Grounding As-Built Drawing with Interconnection Points
Case Study: Division 25 — Field Case Study Troubleshooting
Quick answers about Earthing / Lightning / Surge troubleshooting in the AGL Troubleshooting Atlas.
Division 16 is the Earthing / Lightning / Surge Troubleshooting reference. It publishes 15 diagnostic topics, ELS-411 to ELS-425, for Earthing / Lightning / Surge faults on airfield ground lighting systems.
Every topic follows the same diagnostic record: the symptom, equipment/system, possible causes ranked by likelihood (high, medium or low), required tools, safety precautions, diagnostic procedure, test points, root cause verification, corrective action, preventive action and related references (SOPs, standards, diagrams and case studies).
The 15 topics are ELS-411 to ELS-425: High Earth Resistance; Poor Equipment Earthing; Broken Earth Connection; Loose Earth Connection; Corroded Earth Connection; Earth Grid Continuity Failure; Lightning Damage; Surge Protection Device Failure; Repeated SPD Failure; Surge-Induced CCR Failure; Surge-Induced LED Failure; Surge-Induced Communication Failure; Lightning-Induced Cable Failure; Earthing-Related False Alarm; Ground Potential Difference Problem.
Each procedure starts with observation before any intervention. For example, ELS-411 (High Earth Resistance) begins: Confirm the test was performed correctly — correct method (fall-of-potential vs. clamp-on), correct probe spacing, and away from interfering buried metalwork or parallel earth paths.
Each topic lists its own precautions. For example, ELS-411 (High Earth Resistance) starts with: De-energise and isolate associated equipment before working in the earth pit where practical.
Related references in the topics include SOP-ELS-01 (Earth Resistance Test Procedure), SOP-CCR-04 (CCR LOTO Procedure), SOP-ELS-02 (Equipment Earth Bond Verification Procedure), SOP-ELS-03 (Earth Conductor Fault Location and Repair Procedure), SOP-ELS-04 (Earth Termination Inspection and Torque Procedure), SOP-ELS-05 (Earth Connection Corrosion Assessment Procedure), SOP-ELS-06 (Earth Grid Continuity Test Procedure) and SOP-ELS-07 (Post-Lightning-Event Inspection Procedure), and 9 more.
Where a standard applies, it appears in the topic's Related References. Those cited in this division include IEEE 80, IS 3043, ICAO Annex 14 Vol I, IEC 60364, IEC 62305, FAA AC 150/5340-30, IEC 61643, FAA AC 150/5345-10 and FAA AC 150/5345-46.
Use the search box at the top of the page to filter the 15 published topics by code, fault name or keyword; matching topics open automatically. Each diagnostic record can also be downloaded as a Word (.doc) file.
Earthing, lightning, and surge-related faults often damage multiple points on a circuit at once, not just the device that failed visibly.
Build the technical knowledge to understand earth fault behavior, surge propagation through AGL circuits, and how to fully assess a system after a lightning event instead of just replacing the obvious damage.
Diagnose systematically. Understand the circuit. Build real AGL expertise.
Please read before relying on any content on this page or on any record downloaded from it.