Installation and commissioning fault diagnosis across the AGL system — from fixture mounting, height, orientation, and alignment errors through base-can and drainage defects, cable routing/burial/protection deviations, earthing faults, incorrect connector and transformer installation practice, sign/PAPI/approach-light positioning errors, circuit and equipment identification discrepancies, wrong-component substitutions, and commissioning test failures. Each topic follows the full engineering diagnostic record: symptom → observation → measurement → decision → fault location → root cause → verification → corrective action → preventive action.
Symptom — A newly installed or recently serviced fixture is found mounted in a way that does not match the specified mounting method, frangibility requirement, or fixture orientation relative to its base, discovered during commissioning inspection or a subsequent flight check.
In-pavement or elevated AGL fixture and its mounting interface to the base can, stake, or frangible coupling, as installed.
Re-inspect the corrected mounting, confirm fixture height/angle against the drawing, and verify frangible coupling function before final commissioning sign-off.
SOP: SOP-INST-01 (Fixture Mounting Verification Procedure)
Standards: FAA AC 150/5340-30, ICAO Annex 14 Vol I (frangibility requirements)
Diagram: Fixture Mounting Detail Drawing
Case Study: Division 25 — Field Case Study Troubleshooting
Symptom — A fixture is measured during commissioning or a routine inspection to be higher or lower than the height specified in the design drawing, potentially affecting light distribution or frangibility/obstruction clearance.
AGL fixture height as installed, measured from the surrounding pavement or ground reference to the top of the fixture lens or housing.
Re-measure fixture height after correction and confirm it is within the specified tolerance before commissioning sign-off.
SOP: SOP-INST-02 (Fixture Height Verification Procedure)
Standards: FAA AC 150/5340-30, ICAO Annex 14 Vol I
Diagram: Fixture Height Tolerance Table
Case Study: Division 26 — Photometric & Intensity Compliance
Symptom — A fixture is found rotated out of its specified orientation — for example a unidirectional in-pavement light not facing the correct approach direction — discovered during a night flight check or photometric inspection.
AGL fixture body and lens assembly as rotationally installed in its base can or mount, relative to the specified beam direction.
Conduct a night visual check (or photometric measurement) from the specified direction after correction and confirm the beam is correctly oriented before sign-off.
SOP: SOP-INST-03 (Fixture Orientation Verification Procedure)
Standards: ICAO Annex 14 Vol I, FAA AC 150/5340-30
Diagram: Fixture Orientation and Beam Direction Drawing
Case Study: Division 26 — Photometric & Intensity Compliance
Symptom — A fixture's vertical or horizontal aiming angle is found outside the specified tolerance during a photometric check, aiming survey, or pilot report of an inconsistent light pattern along a run.
AGL fixture aiming mechanism (vertical elevation angle and/or horizontal azimuth) as set relative to the runway/taxiway centreline or approach path.
Re-measure the aiming angle with the calibrated tool after adjustment, and where practical confirm visually or photometrically before sign-off.
SOP: SOP-INST-04 (Fixture Aiming and Alignment Verification Procedure)
Standards: ICAO Annex 14 Vol I, FAA AC 150/5340-30
Diagram: Fixture Aiming Angle Specification Table
Case Study: Division 26 — Photometric & Intensity Compliance
Symptom — Mounting hardware, connector fittings, or terminal lugs are found torqued outside the manufacturer's specified range during inspection — either over-tightened and showing signs of stress/cracking, or under-tightened and loose.
Mounting bolts, connector gland fittings, and terminal lugs across fixtures, base cans, and transformer housings, assessed against manufacturer torque specifications.
Re-check torque with a calibrated wrench after correction and inspect for any resulting damage before closing out.
SOP: SOP-INST-05 (Torque Verification and Correction Procedure)
Standards: Manufacturer torque specification tables, FAA AC 150/5340-30
Diagram: Hardware Torque Specification Table
Case Study: Division 14 — L-823 / Connector Troubleshooting
Symptom — Fixture mounting bolts, base-can lid fasteners, or bracket hardware are found loose or missing during inspection, independent of a torque-value discrepancy, sometimes with the fixture itself visibly able to move.
Fixture mounting bolts, base-can lid fasteners, and bracket hardware securing AGL components in place.
Re-check torque and confirm no play remains in the fixture or lid after correction, and re-inspect at the next scheduled PM cycle to confirm the fix has held.
SOP: SOP-INST-05 (Torque Verification and Correction Procedure)
Standards: FAA AC 150/5340-30
Diagram: Mounting Hardware Specification Table
Case Study: Division 07 — Taxiway Light Troubleshooting
Symptom — An in-pavement base can (L-867 or similar) is found installed in a manner that deviates from the design specification — wrong depth, wrong orientation, incorrect bedding, or wrong can size — discovered during commissioning or later maintenance access.
L-867/base can assembly as installed in the pavement, including its depth, orientation, bedding material, and connection to conduit/duct.
After correction, confirm base-can depth, bedding, and conduit sealing meet specification before backfilling, and re-verify fixture height once the fixture is remounted.
SOP: SOP-INST-06 (Base Can Installation Verification Procedure)
Standards: FAA AC 150/5340-30, civil/electrical installation drawings
Diagram: Base Can Installation Detail Drawing
Case Study: Division 08 — Taxiway Centreline / Guidance Lighting Troubleshooting
Symptom — A base can is found full or partially full of standing water during inspection or fault investigation, distinct from a connector-level water-ingress fault, indicating a drainage or sealing problem with the can itself.
L-867/base can assembly, its drainage provisions, and lid seal, as installed at a specific pavement location.
Megger the affected circuit after pump-out and drying to confirm no lasting insulation damage, and re-inspect the base can after the next significant rainfall to confirm drainage is restored.
SOP: SOP-CON-05 (Water Ingress Inspection and Remediation Procedure), SOP-INST-06 (Base Can Installation Verification Procedure)
Standards: FAA AC 150/5340-30
Diagram: Base-Can Drainage Detail Drawing
Case Study: Division 14 — L-823 / Connector Troubleshooting (water ingress)
Symptom — A broader pattern of standing water, saturated bedding, or repeated moisture-related faults is observed across a section of the field rather than at a single base can, pointing to a systemic drainage design or construction issue.
Subsurface drainage system serving a section of the AGL installation — base-can sumps, drainage pipe/trench runs, and surrounding pavement grading, considered collectively rather than at a single location.
Re-survey the affected section after the next significant rainfall to confirm the drainage pattern has improved across all previously affected base cans.
SOP: SOP-INST-07 (Section Drainage Survey Procedure)
Standards: FAA AC 150/5340-30, local civil drainage design standards
Diagram: Section Drainage As-Built Drawing
Case Study: Division 14 — L-823 / Connector Troubleshooting (water ingress)
Symptom — A cable is found routed in a manner that deviates from the design drawing — crossing an unintended path, sharing a duct with an incompatible circuit, or lacking the specified separation from other services — discovered during commissioning, fault-finding, or third-party excavation coordination.
Primary or secondary cable routing between base cans, pull boxes, and the CCR/equipment vault, as installed relative to the design drawing.
After correction (physical re-route or drawing update), confirm the as-built record matches the field condition and that separation requirements are met before sign-off.
SOP: SOP-INST-08 (Cable Routing Verification Procedure)
Standards: FAA AC 150/5340-30, local utility separation standards
Diagram: Cable Routing As-Built Drawing
Case Study: Division 08 — Taxiway Centreline / Guidance Lighting Troubleshooting (cable faults)
Symptom — A cable is found buried at a depth, in a bedding material, or without a protective marker that deviates from the specified burial standard, typically discovered during excavation for an unrelated purpose or a targeted verification survey.
Direct-buried or duct-enclosed cable as installed below grade, assessed for depth, bedding, and marker/warning tape compliance.
After correction, confirm depth and protection meet specification at the corrected section and update the as-built record before closing out.
SOP: SOP-INST-09 (Cable Burial Verification Procedure)
Standards: FAA AC 150/5340-30, local electrical code burial depth requirements
Diagram: Cable Burial Depth and Marker Tape Detail
Case Study: Division 08 — Taxiway Centreline / Guidance Lighting Troubleshooting (cable faults)
Symptom — A cable is found without the mechanical protection specified for its location — missing conduit through a vehicle-loaded crossing, no armour where required, or unprotected at a pavement penetration — discovered during inspection or after a related cable-damage fault.
Cable protective measures (conduit, sleeving, armour, or duct) at road/taxiway crossings, pavement penetrations, and other locations specified as requiring additional mechanical protection.
After installing or repairing protection, confirm full coverage across the loaded area and inspect the cable jacket beneath it for any pre-existing damage before backfilling.
SOP: SOP-INST-08 (Cable Routing Verification Procedure)
Standards: FAA AC 150/5340-30, local electrical code mechanical protection requirements
Diagram: Cable Crossing Protection Detail Drawing
Case Study: Division 14 — L-823 / Connector Troubleshooting (mechanical damage)
Symptom — An earthing/grounding connection at a fixture, base can, transformer, or equipment vault is found missing, undersized, or improperly terminated during inspection, or is identified as the cause of an elevated touch-voltage or earth-fault trend reading.
Earthing/grounding conductors and connections at AGL fixtures, base cans, transformer housings, and the equipment vault/CCR earthing system.
Re-test earth resistance and bonding continuity after correction and confirm both meet the specified threshold before sign-off.
SOP: SOP-INST-10 (Earthing/Grounding Verification Procedure)
Standards: IEC 60364, FAA AC 150/5340-30, local electrical code earthing requirements
Diagram: Site Earthing/Grounding System Drawing
Case Study: Division 01 — CCR Troubleshooting (earth-fault protection)
Symptom — During commissioning or a follow-up inspection, an L-823 or other field connector is found installed in a way that deviates from the standard installation procedure — distinct from a connector defect — such as an incorrect base-can placement, unsupported cable, or non-standard grease/sealing practice.
Field connector installation practice as applied at a specific location, assessed against the standard connector installation procedure rather than the connector hardware itself.
After correcting the installation, verify insulation resistance is within tolerance and confirm the connector is supported and sealed per the standard procedure before closing the base can.
SOP: SOP-CON-01 (L-823 Connector Inspection and Reseating Procedure), SOP-INST-11 (Standard Connector Installation Procedure)
Standards: FAA AC 150/5345-26, manufacturer installation instructions
Diagram: Standard Connector Installation Checklist
Case Study: Division 14 — L-823 / Connector Troubleshooting
Symptom — An isolation transformer is found installed in a manner that deviates from the standard procedure — wrong orientation, unsupported in the base can, incorrect primary/secondary lead routing, or missing the specified potting/sealing — discovered during commissioning or fault investigation.
Isolation transformer as physically and electrically installed in the base can, including its support, orientation, and lead routing/sealing.
After correction, re-megger the transformer and confirm the fixture operates correctly at all intensity steps before closing the base can.
SOP: SOP-INST-12 (Transformer Installation Verification Procedure)
Standards: FAA AC 150/5345-46, manufacturer transformer installation instructions
Diagram: Transformer Installation and Support Detail Drawing
Case Study: Division 01 — CCR Troubleshooting
Symptom — A lighted airfield sign is found installed with a deviation from its specification — wrong location, incorrect message panel, wrong mounting height, or incorrect frangible mount — discovered during commissioning, a night flight check, or routine inspection.
Lighted airfield guidance sign (mandatory instruction, location, or direction sign) and its mounting/frangible base as installed.
After correction, re-verify location, height, and message against the specification, and conduct a night visual check to confirm correct readability and illumination before sign-off.
SOP: SOP-INST-13 (Sign Installation Verification Procedure)
Standards: ICAO Annex 14 Vol I (sign specifications), FAA AC 150/5340-18
Diagram: Airfield Sign Location and Message Schedule
Case Study: Division 26 — Photometric & Intensity Compliance
Symptom — A Precision Approach Path Indicator (PAPI) unit or array is found installed with a deviation from its design — incorrect elevation angle setting, wrong unit spacing, incorrect offset from the runway, or wrong unit sequence — discovered during commissioning flight inspection.
PAPI unit array (typically four units) including its elevation angle setting, lateral offset, longitudinal position, and unit sequence relative to the runway.
Schedule a follow-up flight inspection after correction and confirm the glide path indication meets specification before returning the PAPI to full service.
SOP: SOP-INST-14 (PAPI Installation and Angle-Setting Procedure)
Standards: ICAO Annex 14 Vol I (visual approach slope indicator systems), FAA AC 150/5345-28
Diagram: PAPI Array Geometry and Elevation Angle Drawing
Case Study: Division 26 — Photometric & Intensity Compliance
Symptom — A component of the Approach Lighting System (ALS) — a centreline bar, crossbar, or sequenced flasher — is found installed with a deviation from its design position, height, or structural specification, discovered during commissioning or a subsequent inspection.
Approach Lighting System structure and fixtures — centreline light bars, crossbars, and sequenced flashing lights on their supporting towers/frangible structures — as installed relative to the design layout.
Re-survey the corrected structure and, where the deviation could affect approach guidance, coordinate a follow-up flight inspection before returning it to full service.
SOP: SOP-INST-15 (Approach Lighting System Installation Verification Procedure)
Standards: ICAO Annex 14 Vol I, FAA AC 150/5340-30, FAA AC 150/5345-56 (sequenced flashers)
Diagram: ALS Layout and Structure Detail Drawing
Case Study: Division 26 — Photometric & Intensity Compliance
Symptom — A circuit, cable, or CCR output is found labelled or documented as serving a different function or area than it actually does, discovered when a maintenance action based on the label produces an unexpected result.
Circuit identification labelling and documentation — CCR panel labels, cable tags, base-can markings, and as-built circuit drawings — as compared against the actual physical circuit function.
After correcting labels and documentation, perform an independent verification (e.g. a second technician isolating by the corrected label) to confirm the fix is accurate before closing out.
SOP: SOP-INST-16 (Circuit Identification Verification Procedure)
Standards: FAA AC 150/5340-30, internal documentation control procedure
Diagram: Master Circuit Identification and As-Built Drawing Set
Case Study: Division 01 — CCR Troubleshooting
Symptom — A physical piece of equipment — a transformer, CCR, fixture, or base can — is found labelled with the wrong asset number, part number, or type designation, creating a mismatch between the physical item and its maintenance/inventory record.
Equipment identification labelling and asset records for transformers, CCRs, fixtures, and base cans, as compared against the physical equipment installed.
After correcting labels and records, cross-check the updated record against the physical nameplate a second time to confirm consistency before closing out.
SOP: SOP-INST-17 (Equipment Identification Verification Procedure)
Standards: FAA AC 150/5340-30, internal asset management procedure
Diagram: Equipment Asset Register
Case Study: Division 24 — Complete Runway Lighting Failure
Symptom — A component installed at a given location is found, on inspection or after a related failure, to be a different part than the one specified for that location — broader than a specific wattage, connector, or fixture mismatch, covering any general component substitution.
Any AGL system component (fixture, transformer, connector, control card, or ancillary part) as physically installed, compared against the specification for its installed location.
After replacing with the correctly specified component, verify function and rating against the schedule before closing out.
SOP: SOP-INST-18 (Component Verification Against Specification Procedure)
Standards: FAA AC 150/5340-30, internal change-control procedure
Diagram: Site Component/Equipment Schedule
Case Study: Division 14 — L-823 / Connector Troubleshooting (incorrect connector type)
Symptom — An isolation transformer installed at a fixture is found to have a VA/wattage rating that does not match the specification for that fixture type, discovered during commissioning, a photometric check, or after a related overheating or dim-output fault.
Isolation transformer VA/wattage rating as installed, compared against the rating specified for the fixture it feeds.
After replacing with the correctly rated transformer, verify fixture output at all intensity steps and confirm no thermal stress under normal load before closing out.
SOP: SOP-INST-12 (Transformer Installation Verification Procedure)
Standards: FAA AC 150/5345-46
Diagram: Fixture and Transformer Rating Schedule
Case Study: Division 08 — Taxiway Centreline / Guidance Lighting Troubleshooting (photometric)
Symptom — A fixture found at a given location is confirmed, by part number or physical inspection, to be a different model or type than the one specified for that location — potentially matching electrically and mounting-wise but differing in photometric output, colour, or classification.
AGL fixture part number/model as physically installed, compared against the fixture schedule specification for that location.
After replacing with the correctly specified fixture, verify photometric/colour output and confirm it matches neighbouring fixtures in the same run before closing out.
SOP: SOP-INST-18 (Component Verification Against Specification Procedure)
Standards: FAA AC 150/5340-30, ICAO Annex 14 Vol I
Diagram: Site Fixture Schedule
Case Study: Division 08 — Taxiway Centreline / Guidance Lighting Troubleshooting (wrong colour)
Symptom — An L-823 or other field connector installed at a location is confirmed to be a different part number, rating, or configuration than specified, distinct from a general incorrect-connector-type fault by being identified specifically during installation/commissioning verification rather than in-service fault investigation.
Field connector part number/rating as physically installed at a specific location, verified against the connector schedule at the point of commissioning.
After replacing with the correctly specified connector, verify continuity, insulation resistance, and fixture operation before closing out.
SOP: SOP-CON-13 (Connector Type Verification Procedure), SOP-INST-18 (Component Verification Against Specification Procedure)
Standards: FAA AC 150/5345-26
Diagram: Site Connector Schedule
Case Study: Division 14 — L-823 / Connector Troubleshooting (incorrect connector type)
Symptom — One or more required commissioning tests — insulation resistance, earth resistance, photometric, continuity, or functional intensity-step verification — returns a result outside the acceptable threshold during final acceptance testing of a new or modified installation.
The full commissioning test suite for a new or modified AGL circuit or installation, covering electrical, mechanical, and photometric acceptance criteria.
Repeat the full relevant commissioning test suite after correction and confirm all results meet acceptance criteria before issuing final commissioning sign-off.
SOP: SOP-INST-19 (Commissioning Test Procedure and Acceptance Criteria)
Standards: FAA AC 150/5340-30, ICAO Annex 14 Vol I, IEC 60364
Diagram: Commissioning Test Record Template
Case Study: Division 25 — Field Case Study Troubleshooting
Quick answers about Installation & Commissioning Faults troubleshooting in the AGL Troubleshooting Atlas.
Division 17 is the Installation & Commissioning Faults reference. It publishes 25 diagnostic topics, INST-426 to INST-450, for Installation & Commissioning Faults on airfield ground lighting systems.
Every topic follows the same diagnostic record: the symptom, equipment/system, possible causes ranked by likelihood (high, medium or low), required tools, safety precautions, diagnostic procedure, test points, root cause verification, corrective action, preventive action and related references (SOPs, standards, diagrams and case studies).
The 25 topics are INST-426 to INST-450: Incorrect Fixture Mounting; Incorrect Fixture Height; Incorrect Fixture Orientation; Incorrect Fixture Alignment; Incorrect Torque; Loose Mounting Hardware; Incorrect Base Installation; Base Can Flooding; Poor Drainage; Improper Cable Routing; Incorrect Cable Burial; Insufficient Cable Protection; Improper Earthing; Incorrect Connector Installation; Incorrect Transformer Installation; Incorrect Sign Installation; Incorrect PAPI Installation; Incorrect Approach Light Installation; Incorrect Circuit Identification; Incorrect Equipment Identification; Wrong Component Installed; Wrong Wattage Transformer Installed; Wrong Fixture Installed; Wrong Connector Installed; Commissioning Test Failure.
Each procedure starts with observation before any intervention. For example, INST-426 (Incorrect Fixture Mounting) begins: Compare the as-installed mounting method against the installation drawing for that fixture type and location.
Each topic lists its own precautions. For example, INST-426 (Incorrect Fixture Mounting) starts with: Coordinate airside access through ATC/apron control before approaching the fixture.
Related references in the topics include SOP-INST-01 (Fixture Mounting Verification Procedure), SOP-INST-02 (Fixture Height Verification Procedure), SOP-INST-03 (Fixture Orientation Verification Procedure), SOP-INST-04 (Fixture Aiming and Alignment Verification Procedure), SOP-INST-05 (Torque Verification and Correction Procedure), SOP-INST-06 (Base Can Installation Verification Procedure), SOP-CON-05 (Water Ingress Inspection and Remediation Procedure) and SOP-INST-07 (Section Drainage Survey Procedure), and 14 more.
Where a standard applies, it appears in the topic's Related References. Those cited in this division include FAA AC 150/5340-30, ICAO Annex 14 Vol I, IEC 60364, FAA AC 150/5345-26, FAA AC 150/5345-46, FAA AC 150/5340-18, FAA AC 150/5345-28 and FAA AC 150/5345-56.
Use the search box at the top of the page to filter the 25 published topics by code, fault name or keyword; matching topics open automatically. Each diagnostic record can also be downloaded as a Word (.doc) file.
Faults that surface after commissioning often trace back to an installation error that testing didn't catch.
Build the technical knowledge to understand common installation-quality faults, how they masquerade as equipment failures, and how to trace a fault back to its true installation-stage root cause.