What is frangible mounting in the civil works?

The planned weak point sits just above the foundation. The civil works keep the foundation low and firm and leave nothing around the break point that could stop it working.

BREAK POINT AT THE FOUNDATION what stays in the ground, and what must be left free to break away FINISHED GROUND DUCT ENDS BELOW BREAK NO RIGID CONDUIT OR EARTH ROD ABOVE THE TOP NO GROUT OR CONCRETE COLLAR AROUND COUPLING FIXTURE elevated light, stands in wind FRANGIBLE COUPLING designed break point BASE PLATE FOUNDATION TOP LOW stays in the ground after a strike ANCHOR BOLTS COMPACTED, DRAINED BASE STRIKE KEEP THE BREAK POINT FREE 1 TOP LEVEL Foundation low, at design height 2 NO COLLAR No grout, concrete or built-up soil 3 CABLE SLACK Duct below break, lead can part 4 CLEAR GROUND No rigid hardware beside the unit 5 AFTER A STRIKE Replace coupling, check the base SIDE VIEW IN SECTION · SCHEMATIC · NOT TO SCALE
anchors, frangible point
fixture and concrete
duct and lead
do not add / strike (motion)
The Fact Civil interface

Elevated lights and signs near runways and taxiways are frangible: strong enough for wind and normal use, but built to break away at a designed point if an aircraft strikes them. That point is the frangible coupling, set just above the foundation. Above it the unit separates; below it the base plate, anchor bolts and foundation stay in the ground.

It is a civil interface because the foundation, ground level and cable entry decide whether the coupling can do its job. The civil works keep the foundation top low and at design height, set the duct stub-up below the break point, and add nothing that bridges or stiffens the coupling: no collar of grout or concrete, no built-up soil or turf against the stem, no rigid conduit, earth rod or marker standing beside the unit. The manufacturer’s drawing sets the coupling, the break height and the cable arrangement.

Civil interface (this entry)

Foundation top, ground level, duct and hardware around the base, so the break point is left free.

Installation entry

Fitting the coupling, torque, connector and slack lead on the fixture itself.

Break pointFrangible coupling just above the foundation
StaysFoundation, anchor bolts, base plate, duct
Break heightFAA: frangible point no higher than 3 in (76 mm) above grade (AC 150/5300-13, AC 150/5345-42). Check the ICAO and local limit for your project
Foundation topLow, level and at design height
CableDuct ends below the break; lead slack, separable connector
Do not addCollars, bracing, stiff conduit, extra fixings
ReferenceICAO Annex 14 Vol I Ch 5 · Doc 9157 Pt 6 · FAA AC 150/5340-30 · AC 150/5220-23 · AC 150/5345-45
Schematic only, not to scale. Coupling type, break height, permitted stub height and cable arrangement differ between products and standards. Follow the manufacturer’s data and the applicable standard, and keep the unit as the manufacturer made it.
Grouted Collar
Concrete or grout poured up around the coupling to neaten the base can stop it breaking where it should.
High Foundation Top
A top set above design leaves a solid stub standing in the strike zone and moves the break point up.
Rigid Hardware Beside the Unit
Conduit, earth rod heads or markers standing proud of the base can hold the unit back or become obstacles.
Ground Built Up Over Time
Regrading, resurfacing or heavy turf raises the ground and shortens the clear stub below the break point.
Entry 14 · Asphalt/concrete interface Entry 17 · Fixture alignment

Frequently Asked Questions

Q1What does frangible mounting mean for the civil works?

The civil works must leave the break point free to work. The foundation stays low and firm, nothing solid is built up around the coupling, and the cable and any earth or duct hardware stay below it, so the unit above can break away while the foundation stays in the ground.

Q2Where is the break point in relation to the foundation?

Just above the foundation top, at the frangible coupling. Everything above it is designed to separate or yield in a strike, and everything below it, the base plate, anchor bolts and concrete, is designed to stay.

Q3What civil work can defeat a frangible coupling?

A collar of grout or concrete around the coupling, a foundation top set too high, soil or turf built up against the stem, and rigid conduit, earth rods or markers that rise beside the unit and bridge or stand above the break point.

Q4How should the duct and cable be arranged at the foundation?

The duct stub-up ends below the break point and the lead has slack, usually through a separable connector, so the cable lets go with the unit instead of holding it back or tearing out of the ground. Follow the manufacturer’s drawing for the fixture or sign. Any earth bond to the unit is a flexible lead that can part with it, not a rigid link to an earth rod.

Q5Does ground level matter?

Yes. The foundation top and finished ground are kept at the design level so the break point stays at its designed height. Regrading, resurfacing or heavy turf build-up over time can raise the ground and shorten the stub the standard allows.

Q6What is checked after a strike?

The foundation, anchor bolts, base plate, duct, lead and connector are checked for damage and the frangible coupling is replaced, then the ground level and the unit’s alignment are confirmed before it is returned to service. Work only on a circuit that has been isolated, locked out and proved dead.

Precision AGL Academy

See It. Understand It. Then Learn How to Engineer It.

Recognising an AGL system visually is the first step. The next step is knowing how to design, install, test, commission and maintain them correctly.

Build Practical AGL Engineering Skills

Go deeper with structured training from Precision AGL Academy, covering:

AGL Fundamentals Design & Electrical Engineering Approach Lighting Photometry Installation & Commissioning Maintenance & Troubleshooting

Learn how each light, sign and circuit works as part of a complete airport lighting system, not just as an isolated diagram.