A standardized methodology for assessing the protective earthing, bonding, earth-continuity, lightning-protection, and surge-protection arrangements associated with AGL installations. Covers earth electrodes, earth pits, earth conductors, bonding conductors, equipment earthing, base-can bonding, isolating-transformer bonding, CCR earthing, airfield-sign earthing, earth continuity, lightning-protection connections, and surge-protection devices.

12 / 12
Topics Published
INS-EBD-370 → 381
Inspection ID Range
Level 2
Technical · Periodic
Rev 0
Initial Issue

Safety control — Visual inspection does not prove electrical effectiveness. Continuity, resistance, impedance, or other electrical tests shall be performed only by authorized/competent personnel using approved procedures and calibrated instruments. The earthing and bonding system should be treated as a complete protective electrical path — Earth Electrode → Earth Conductor → Earth Connection → Bonding Network → Equipment → Protective Device/Installation — rather than a collection of individual earth connections.

Division 13 · Earthing & Bonding Inspection Topics

12 of 12 topics published
INS-EBD-370 Earth-Electrode Inspection
What's Inspected

Inspection of the accessible condition and installation environment of the earth electrode, including its connection to the earth conductor and applicable test records.

Inspection Points
  • Electrode identification & system association
  • Electrode-to-conductor connection
  • Corrosion, oxidation, material degradation
  • Physical damage, displacement, exposed components
  • Earth-resistance / electrical test record review
Classify As
Normal Defective Unsafe Immediate Action Required
INS-EBD-371 Earth-Pit Inspection
What's Inspected

Inspection of the earth pit and associated components for structural condition, cleanliness, water ingress, drainage, and safe accessibility to the earth connection/test point.

Inspection Points
  • Cover condition (damage, displacement, corrosion, seating)
  • Cleanliness (mud, debris, FOD, vegetation, oil, chemicals)
  • Standing water / flooding / excessive moisture
  • Drainage adequacy
  • Pit walls, base, frame & structural condition
  • Safe accessibility for authorized personnel
Classify As
Normal Defective Unsafe Immediate Action Required
INS-EBD-372 Earth-Conductor Inspection
What's Inspected

Inspection of protective earth conductors for physical and mechanical condition, insulation/protective covering, routing, identification, and termination connections.

Inspection Points
  • Insulation / protective covering condition
  • Cuts, abrasion, crushing, bending or mechanical damage
  • Routing & mechanical protection
  • Conductor identification
  • Termination/connection points
  • Corrosion & deterioration
Classify As
Normal Defective Unsafe Immediate Action Required
INS-EBD-373 Bonding-Conductor Inspection
What's Inspected

Inspection of bonding conductors for condition and continuity arrangements between metallic components across the AGL installation.

Inspection Points
  • Routing & mechanical protection
  • Cuts, breaks, crushing or abrasion damage
  • Corrosion & deterioration
  • Bonding conductor terminations
  • Conductor identification
Classify As
Normal Defective Unsafe Immediate Action Required
INS-EBD-374 Equipment-Earth Inspection
What's Inspected

Inspection of protective earthing connections on AGL electrical equipment, including equipment-to-equipment bonding between metallic components where applicable.

Inspection Points
  • Earth connection at equipment terminals
  • Equipment bonding between metallic components
  • Continuity test record review
  • Corrosion or deterioration at earth connections
Classify As
Normal Defective Unsafe Immediate Action Required
INS-EBD-375 Base-Can Bonding Inspection
What's Inspected

Inspection of applicable bonding arrangements associated with AGL base cans, including the earth/bonding connection at the base-can assembly.

Inspection Points
  • Earth/bonding connection at base-can assembly
  • Bonding conductor condition & routing
  • Lugs, clamps, fasteners & connection points
  • Bonding continuity test record review
Classify As
Normal Defective Unsafe Immediate Action Required
INS-EBD-376 Transformer-Bonding Inspection
What's Inspected

Inspection of applicable bonding arrangements associated with isolating-transformer installation, where fitted.

Inspection Points
  • Protective-earth/bonding connections
  • Bonding conductor condition & protection
  • Connection security
  • Corrosion & deterioration
Classify As
Normal Defective Unsafe Immediate Action Required
INS-EBD-377 CCR-Earth Inspection
What's Inspected

Inspection of the CCR protective earthing arrangement, including cabinet bonding and door/panel bonding where applicable.

Inspection Points
  • CCR earth terminals & connection points
  • Cabinet bonding between components
  • Door/panel-to-cabinet bonding
  • Earth-continuity test record review
  • Corrosion or deterioration at earth connections
Classify As
Normal Defective Unsafe Immediate Action Required
INS-EBD-378 Sign-Earth Inspection
What's Inspected

Inspection of applicable protective earthing arrangements for illuminated airfield signs, including bonding between metallic components.

Inspection Points
  • Sign earth terminals & connections
  • Bonding between applicable metallic components
  • Earth-conductor routing, protection & physical condition
  • Continuity test record review
Classify As
Normal Defective Unsafe Immediate Action Required
INS-EBD-379 Earth-Continuity Inspection
What's Inspected

Verification of the availability and condition of earth-continuity test arrangements, and review of continuity results for signs of deterioration or discontinuity.

Inspection Points
  • Protective-earth continuity test record review
  • Bonding continuity test record review
  • Suspected breaks/discontinuity in the earth path
  • Historical trend review for recurring abnormalities
Classify As
Normal Defective Unsafe Immediate Action Required
INS-EBD-380 Lightning-Protection Connection Inspection
What's Inspected

Inspection of connections associated with the applicable lightning-protection system, including a check for damage following lightning events or suspected strikes.

Inspection Points
  • Lightning-bonding conductor damage & security
  • Accessible connection points
  • Corrosion & deterioration
  • Damage following lightning events
  • Inspection/test record review
Classify As
Normal Defective Unsafe Immediate Action Required
INS-EBD-381 Surge-Protection-Device Condition Inspection
What's Inspected

Inspection of applicable surge-protection devices (SPDs) for physical condition, status indication, and correct connection to the protective earthing system.

Inspection Points
  • Visual status indicator
  • Electrical connections
  • Connection to protective earthing system
  • Cracks, deformation, overheating, discoloration or damage
  • Visual evidence of thermal stress or device failure
  • Maintenance / replacement / inspection record review
Classify As
Normal Defective Unsafe Immediate Action Required
No topics match your search.

Division-Wide Requirements

Common inspection parameters, classification scheme, workflow, and records that apply across all 12 Division 13 topics.

Standard Earthing & Bonding Inspection Parameters

ParameterInspection Status
Earth ElectrodeGood / Damaged / Corroded
Earth PitGood / Deficient
Earth-Pit CoverGood / Damaged / Missing
Earth-Pit WaterNone / Present
Earth-Pit DrainageGood / Restricted
Earth ConductorGood / Damaged
Earth Conductor RoutingCorrect / Deficient
Earth ConnectionsSecure / Loose / Damaged
Earth Lugs/ClampsGood / Corroded / Damaged
Bonding ConductorGood / Damaged
Equipment EarthGood / Deficient
Base-Can BondingGood / Deficient
Transformer BondingGood / Deficient / N/A
CCR EarthGood / Deficient
Sign EarthGood / Deficient
Earth ContinuityAcceptable / Deficient / Test Required
CorrosionNone / Present
Lightning ProtectionGood / Deficient
SPDNormal / Defective / Requires Replacement
SPD IndicatorNormal / Failed / N/A
Water/MoistureNone / Present
Test RecordsAvailable / Missing / Deficient
Defect StatusNormal / Defective / Unsafe / Immediate Action Required

A. Standard Inspection Classification

Every observation should be assigned an appropriate status:

NormalProtective earth/bonding path intact and satisfactory.

DefectiveAbnormality identified that requires correction but does not by itself compromise protective effectiveness.

UnsafeCondition compromises the effectiveness of the protective earthing/bonding path and should be treated as unsafe pending correction and/or test.

Immediate Action RequiredCondition presents an immediate electrical-safety or lightning/surge risk requiring urgent escalation.

B. Standard Earthing & Bonding Inspection Workflow

The following sequence applies across all Division 13 topics:

IDENTIFY SYSTEM IDENTIFY EARTH POINT INSPECT EARTH PIT INSPECT ELECTRODE INSPECT EARTH CONDUCTOR INSPECT CONNECTIONS INSPECT BONDING CONDUCTORS CHECK EQUIPMENT EARTHING CHECK BASE-CAN BONDING CHECK TRANSFORMER BONDING CHECK CCR EARTHING CHECK SIGN EARTHING VERIFY CONTINUITY RECORDS INSPECT LIGHTNING PROTECTION INSPECT SPD CHECK CORROSION/WATER CLASSIFY RECORD CORRECT TEST VERIFY CLOSE

C. Minimum Inspection Record

Each earthing/bonding inspection record should include:

  • Date and inspection time
  • Inspector name and designation
  • System/location identification
  • Earth point / pit reference
  • Electrode condition
  • Earth-conductor condition
  • Connection condition (terminals, lugs, clamps)
  • Bonding-conductor condition
  • Equipment-earth status
  • Base-can bonding status
  • Transformer bonding status (where applicable)
  • CCR earth status
  • Sign earth status
  • Continuity result / test reference
  • Lightning-protection condition
  • SPD condition & indicator status
  • Corrosion / water observations
  • Defect description, where applicable
  • Status classification
  • Corrective action taken
  • Closure date/time and inspector's verification/sign-off

D. Scope Boundary

Earthing & bonding inspection is intended to

  • Identify visible defects across the protective earth path — electrode, conductor, connections, bonding network, equipment, and protective devices.

It does not replace

  • Earth-continuity testing
  • Earth-resistance testing
  • Bonding-continuity testing
  • Lightning-protection testing
  • SPD performance verification / manufacturer-schedule replacement
  • Engineering investigation of recurring or suspected earth faults

A visually intact earth conductor does not by itself demonstrate an effective protective-earth system.

E. Protective-Earth & Bonding Chain

General protective path

EARTH ELECTRODE EARTH CONDUCTOR EARTH CONNECTION BONDING NETWORK EQUIPMENT PROTECTIVE DEVICE/INSTALLATION

AGL-specific attention chain

CCR ELECTRICAL PANELS AGL CABLES TRANSFORMER/PIT BASE CAN FIXTURE AIRFIELD SIGN ASSOCIATED METALLIC STRUCTURES

Frequently Asked Questions

Quick answers about earthing & bonding inspection in the AGL Inspection Handbook.

Q1What is Division 13 — Earthing & Bonding Inspection in the AGL Inspection Handbook?

Division 13 contains 12 published topics (Level 2, technical and periodic). It gives a standardized methodology for assessing the protective earthing, bonding, earth-continuity, lightning-protection and surge-protection arrangements associated with AGL installations.

Q2What does the earthing and bonding inspection cover?

It covers earth electrodes, earth pits, earth and bonding conductors, equipment earthing, base-can bonding, isolating-transformer bonding, CCR earthing, airfield-sign earthing, earth continuity, lightning-protection connections and surge-protection devices.

Q3What status classifications are used in this division?

This division uses Normal, Defective, Unsafe and Immediate Action Required. Normal means the protective earth or bonding path is intact and satisfactory. Defective means an abnormality needs correction but does not by itself compromise protective effectiveness. Unsafe means the condition compromises the protective earthing or bonding path and is treated as unsafe pending correction and/or test. Immediate Action Required means an immediate electrical-safety or lightning/surge risk requiring urgent escalation.

Q4What parameters are recorded for earthing and bonding?

The checklist includes earth electrode, earth pit, pit cover, water and drainage, earth conductor and routing, connections, lugs and clamps, bonding conductor, equipment, base-can, transformer, CCR and sign earthing, earth continuity, corrosion, lightning protection, SPD condition and indicator, moisture and test records.

Q5Does the earthing and bonding inspection replace testing?

No. It does not replace earth-continuity testing, earth-resistance testing, bonding-continuity testing, lightning-protection testing, SPD performance verification or manufacturer-schedule replacement, or engineering investigation of recurring or suspected earth faults.

Q6Do airport procedures take precedence over this handbook?

Yes. This handbook is an uncontrolled educational reference, not an approved procedure. The airport's approved inspection schedule, SMS procedures, ATC instructions, NOTAM procedures and local aerodrome regulations always take precedence, and the current revision of any official document should be verified before use.

Q7Can I download a printable checklist for each inspection topic?

Yes. Each inspection topic has a Download as Word option that produces an uncontrolled Word checklist template (description, a tick-box inspection table and an inspector sign-off block) for personal reference and internal training, to be reviewed and adopted under the user’s own document control.

Precision AGL Academy

Don't Just Inspect the Earthing. Understand the System.

Earthing and bonding inspection is where fault-protection and equipotential condition awareness begins. Go beyond identifying defects and build the technical knowledge to understand why abnormalities occur, how they affect system serviceability, and when further testing, troubleshooting, maintenance or corrective action is required.

Build Practical AGL Inspection & Maintenance Capability

Develop structured knowledge across:

AGL Fundamentals Components Inspection Electrical Systems Photometry Testing Troubleshooting Maintenance Commissioning

Learn to connect the inspection process with the wider AGL engineering lifecycle.

Inspect with purpose. Understand the system. Act with technical confidence.

Talk to Precision AGL Academy

Follow the Academy