A standardized methodology for assessing the current condition, deterioration, remaining serviceability, maintenance requirement, and failure risk of AGL assets before functional failure occurs. This division is specifically focused on condition-based maintenance (CBM) and preventive-maintenance decision-making — moving beyond "is it working today?" to "is it deteriorating, and should we intervene before it fails?"

14 / 14
Topics Published
INS-PMC-1853 → 2003
Inspection ID Range
17
Sections A–Q
Rev 0
Initial Issue

Core question — "What is the condition of the asset before it actually fails?" The objective is not simply to confirm whether an asset works today, but to determine whether its condition indicates Healthy → Deteriorating → Maintenance Required → High Risk → Replacement Required.

Key difference from other divisions — Division 02 asks "is the fixture physically/optically acceptable today?" Division 20 asks "was the test evidence properly performed and documented?" Division 21 asks "is the fixture deteriorating, and should we intervene before it fails?" Condition rating ≠ maintenance priority — the final decision always weighs Condition × Criticality × Failure Consequence × Redundancy × Availability.

Division 21 · Preventive Maintenance Condition Topics

14 of 14 topics published
INS-PMC-1853 Preventive-Maintenance Condition Assessment
What's Assessed

Overall assessment of the physical, electrical, optical, mechanical, and operational condition of the asset, establishing the baseline condition-based maintenance (CBM) methodology applied across every other topic in this division.

Assessment Points
  • Asset condition-rating assignment/review
  • Condition-trend comparison against previous inspection records
  • Deterioration-rate assessment (stable / gradual / accelerating)
  • Repeat-defect identification
  • Maintenance-history review
  • Failure-history review
  • Condition-based maintenance requirement determination
Condition Rating Applied
C1 Excellent C2 Good C3 Fair C4 Poor C5 Critical C6 Failed
Classify As
Normal Defective Unserviceable Immediate Action Required
INS-PMC-1861 Runway-Fixture Deterioration Assessment
What's Assessed

Assessment of overall runway fixture condition, tracking deterioration trends that precede functional failure of runway edge, threshold, centreline, and touchdown-zone fixtures.

Assessment Points
  • Housing deterioration, cracking, corrosion, deformation, or damage
  • Lens/prism optical deterioration
  • Seal/gasket condition and ageing
  • Recurring moisture/water-ingress history
  • Corrosion progression
  • Mounting hardware and mechanical stability
  • Available photometric/optical performance trend
  • Replacement-need assessment — continued maintenance versus planned replacement
Condition Rating Applied
C1 Excellent C2 Good C3 Fair C4 Poor C5 Critical C6 Failed
Classify As
Normal Defective Unserviceable Immediate Action Required
INS-PMC-1870 Taxiway-Fixture Deterioration Assessment
What's Assessed

Overall condition assessment of taxiway edge, centreline, and guard-light fixtures, tracking deterioration and mechanical/frangible condition ahead of functional failure.

Assessment Points
  • Housing deterioration
  • Optical-surface (lens/prism) condition
  • Sealing condition
  • Recurring moisture problems
  • Corrosion
  • Mechanical condition and applicable frangible components
  • Available illumination/photometric performance history
  • Replacement requirement based on condition and history
Condition Rating Applied
C1 Excellent C2 Good C3 Fair C4 Poor C5 Critical C6 Failed
Classify As
Normal Defective Unserviceable Immediate Action Required
INS-PMC-1879 Sign-Condition Assessment
What's Assessed

Overall physical and operational condition assessment of mandatory, location, direction, and information signs, tracking deterioration in enclosure, face, illumination, and structure.

Assessment Points
  • Enclosure deterioration
  • Face condition, readability, and deterioration
  • Illumination performance and degradation
  • LED modules, drivers, and associated components
  • Recurring moisture problems
  • Mounting structure, supports, and foundation
  • Remaining serviceability and replacement requirement
Condition Rating Applied
C1 Excellent C2 Good C3 Fair C4 Poor C5 Critical C6 Failed
Classify As
Normal Defective Unserviceable Immediate Action Required
INS-PMC-1887 PAPI-Condition Assessment
What's Assessed

Overall PAPI/APAPI condition assessment, tracking optical, housing, alignment, calibration, light-source, and environmental deterioration ahead of functional or guidance failure.

Assessment Points
  • Optical windows, lenses, and internal optical condition
  • Housing deterioration
  • Alignment history and recurring adjustment requirements
  • Historical setting/calibration condition
  • Light-source (lamp/LED) deterioration
  • Effects from moisture, dust, temperature, and corrosion
  • Assessment of continued maintenance, overhaul, or replacement
Condition Rating Applied
C1 Excellent C2 Good C3 Fair C4 Poor C5 Critical C6 Failed
Classify As
Normal Defective Unserviceable Immediate Action Required
INS-PMC-1895 CCR-Condition Assessment
What's Assessed

Assessment of CCR physical, electrical, control, cooling, and operational condition, tracking reliability trends ahead of functional or output failure.

Assessment Points
  • Age and service history
  • Recurring alarms and failures
  • Historical output/current performance trend
  • Fans, ventilation, and thermal condition
  • Accessible electrical connections and deterioration indicators
  • Control electronics/interfaces
  • Enclosure and internal/external deterioration
  • Recurring failures and maintenance requirement trend
  • Continued serviceability versus planned replacement/overhaul
Condition Rating Applied
C1 Excellent C2 Good C3 Fair C4 Poor C5 Critical C6 Failed
Classify As
Normal Defective Unserviceable Immediate Action Required
INS-PMC-1905 Transformer-Condition Assessment
What's Assessed

Overall isolating-transformer condition assessment, tracking age, housing, lead, connector, and test-result trends ahead of insulation or connection failure.

Assessment Points
  • Service age
  • Housing and physical deterioration
  • Cable lead condition and deterioration
  • Connector condition and recurring failures
  • Moisture/water-related history
  • Corrosion
  • Historical test-result trend, where available
  • Replacement assessment based on condition, history, and serviceability
Condition Rating Applied
C1 Excellent C2 Good C3 Fair C4 Poor C5 Critical C6 Failed
Classify As
Normal Defective Unserviceable Immediate Action Required
INS-PMC-1914 Cable-Condition Assessment
What's Assessed

Overall condition assessment of primary AGL cable, tracking insulation, fault-history, joint, and route trends ahead of cable failure.

Assessment Points
  • Historical insulation-test result trend
  • Recurring cable faults
  • Joint condition and history
  • Termination condition
  • Route, trench, duct, protection, and environmental condition
  • Recurring water-related cable problems
  • Cable age and service history
  • Assessment of continued operation versus planned replacement
Condition Rating Applied
C1 Excellent C2 Good C3 Fair C4 Poor C5 Critical C6 Failed
Classify As
Normal Defective Unserviceable Immediate Action Required
INS-PMC-1923 Connector-Condition Assessment
What's Assessed

Overall secondary-connector condition assessment, tracking contact, seal, corrosion, and heating/fault trends ahead of connection failure.

Assessment Points
  • Contact deterioration
  • Sealing performance and ageing
  • Corrosion history
  • Overheating or high-resistance connection history
  • Recurring moisture problems
  • Locking, mating, strain relief, and mechanical integrity
  • Replacement assessment based on condition and failure history
Condition Rating Applied
C1 Excellent C2 Good C3 Fair C4 Poor C5 Critical C6 Failed
Classify As
Normal Defective Unserviceable Immediate Action Required
INS-PMC-1931 Base-Can-Condition Assessment
What's Assessed

Overall base-can and civil condition assessment, tracking corrosion, drainage, settlement, and frangible-coupling trends ahead of failure or non-compliance.

Assessment Points
  • Corrosion
  • Recurring water accumulation
  • Drainage performance
  • Settlement and level deterioration
  • Mounting hardware and fixture interface
  • Frangible-component condition
  • Foundation deterioration
  • Determination of repair versus replacement requirement
Condition Rating Applied
C1 Excellent C2 Good C3 Fair C4 Poor C5 Critical C6 Failed
Classify As
Normal Defective Unserviceable Immediate Action Required
INS-PMC-1940 Earthing-Condition Assessment
What's Assessed

Overall earthing and bonding condition assessment, tracking electrode, conductor, and resistance trends ahead of protective-earthing failure.

Assessment Points
  • Electrode condition, where accessible
  • Earth pit and associated connections
  • Conductor deterioration
  • Bonding conductors
  • Equipment bonding
  • Historical earth-resistance results
  • Corrosion affecting earth/bonding components
  • Determination of maintenance or replacement requirement
Condition Rating Applied
C1 Excellent C2 Good C3 Fair C4 Poor C5 Critical C6 Failed
Classify As
Normal Defective Unserviceable Immediate Action Required
INS-PMC-1949 ALCMS-Condition Assessment
What's Assessed

Overall condition assessment of the ALCMS/control system, tracking reliability, obsolescence, and supportability trends ahead of control-system failure.

Assessment Points
  • HMI/workstation condition
  • PLC/interface condition
  • Communication reliability and recurring faults
  • Recurring alarms and events
  • Historical control-system failures
  • Applicable network equipment
  • Control cabinets and associated equipment
  • Applicable version/configuration records
  • Obsolescence, reliability, supportability, and future replacement requirements
Condition Rating Applied
C1 Excellent C2 Good C3 Fair C4 Poor C5 Critical C6 Failed
Classify As
Normal Defective Unserviceable Immediate Action Required
INS-PMC-1959 Spare-Equipment-Condition Assessment
What's Assessed

Assessment of the physical and functional condition of stored AGL spares, ensuring critical replacement components remain usable and available when needed.

Assessment Points
  • Spare fixture condition
  • Spare isolating-transformer condition
  • Spare connector condition
  • Critical CCR spares
  • Sign-related spares
  • Storage environment condition
  • Packaging, sealing, corrosion protection, and preservation
  • Identification of aged, obsolete, superseded, or unusable spares
  • Availability of critical components required to maintain system serviceability
Condition Rating Applied
C1 Excellent C2 Good C3 Fair C4 Poor C5 Critical C6 Failed
Classify As
Normal Defective Unserviceable Immediate Action Required
INS-PMC-1969 Asset-Life / Condition Review
What's Assessed

Verification of asset age, installation history, and service-life position against expected life, obsolescence, and supportability — the final review that determines whether an asset should move from maintain to planned replacement.

Assessment Points
  • Verification of asset age
  • Available installation/commissioning information
  • Assessment against expected service-life information, where applicable
  • Failure-frequency review
  • Repair-frequency and recurring-intervention review
  • Previous component-replacement review
  • Identification of obsolete or unsupported equipment
  • Availability of replacement components
  • Continuing technical/support availability, where applicable
  • Professional assessment of remaining serviceability
  • Identification of assets requiring planned replacement rather than waiting for failure
Condition Rating Applied
C1 Excellent C2 Good C3 Fair C4 Poor C5 Critical C6 Failed
Classify As
Normal Defective Unserviceable Immediate Action Required
No topics match your search.

Division-Wide Requirements

Common condition-rating scale, decision matrix, workflow, and records that apply across all 14 Division 21 topics — plus the cross-cutting trend-analysis, decision, and priority framework (Sections O–Q) that ties every topic together.

Standard Asset Condition Rating

A single condition scale applied consistently across every topic in this division, used in conjunction with asset criticality rather than as a standalone decision.

RatingConditionMeaning
C1ExcellentNew/near-new condition; no meaningful deterioration
C2GoodMinor deterioration; normal preventive maintenance
C3FairNoticeable deterioration; monitor and plan maintenance
C4PoorSignificant deterioration; maintenance/replacement planning required
C5CriticalSevere condition; urgent intervention/replacement assessment
C6Failed/UnserviceableAsset no longer provides required service

Condition-Based Maintenance Decision Matrix

Typical action associated with each condition rating. Condition rating alone does not set priority — see Section Q below.

ConditionTypical Action
C1 — ExcellentContinue normal inspection
C2 — GoodNormal preventive maintenance
C3 — FairMonitor deterioration and plan intervention
C4 — PoorSchedule maintenance/replacement
C5 — CriticalUrgent technical assessment/intervention
C6 — FailedRemove from service/replace as applicable

Standard Condition Assessment Parameters

Parameters recorded against each asset, common across all 14 topics above.

ParameterAssessment
Asset IDVerified / Not Verified
Asset TypeVerified / Not Verified
LocationVerified / Not Verified
Installation DateKnown / Unknown
AgeRecorded
Physical ConditionC1–C6
Electrical ConditionC1–C6 / N/A
Optical ConditionC1–C6 / N/A
Mechanical ConditionC1–C6 / N/A
Environmental ConditionC1–C6 / N/A
Test-Result TrendStable / Deteriorating / Abnormal / N/A
Failure HistoryNone / Occasional / Recurring
Repair HistoryLow / Moderate / High
Maintenance FrequencyNormal / Increasing / High
ObsolescenceNo / Potential / Yes
Spare AvailabilityAvailable / Limited / Unavailable
Manufacturer SupportAvailable / Limited / Unavailable
Operational CriticalityLow / Medium / High / Critical
Failure ConsequenceLow / Medium / High / Critical
Maintenance RequirementNone / Monitor / Plan / Urgent
Replacement RequirementNo / Planned / Urgent
Monitoring FrequencyNormal / Increased
Overall ConditionC1–C6
Final StatusNormal / Defective / Unserviceable / Immediate Action Required

A. Standard Inspection Classification

Every observation should be assigned an appropriate final status:

NormalEquipment/condition satisfactory and operating as expected.

DefectiveAbnormality or defect identified but equipment remains operational or condition does not require immediate withdrawal.

UnserviceableEquipment or system is not available for its intended function.

Immediate Action RequiredCondition presents an operational, electrical, safety, or airside risk requiring immediate escalation/action.

B. Minimum Condition Inspection Record

Each Division 21 condition record should include:

  • Date and inspection time
  • Inspector name and designation
  • Asset ID, type, and location
  • Installation date / age, where known
  • Physical / electrical / optical / mechanical / environmental condition ratings
  • Condition-trend comparison to previous inspection
  • Failure and repair history summary
  • Obsolescence and spare-availability status
  • Overall condition rating (C1–C6)
  • Maintenance and replacement requirement
  • Monitoring frequency recommendation
  • Assigned priority and criticality
  • Final status and inspector's verification/sign-off

C. Condition-Based Maintenance Workflow

IDENTIFY ASSET REVIEW ASSET HISTORY INSPECT CURRENT CONDITION REVIEW PREVIOUS DEFECTS REVIEW TEST RESULTS REVIEW FAILURE HISTORY ASSESS DETERIORATION ASSIGN CONDITION RATING ASSESS CRITICALITY ASSESS FAILURE CONSEQUENCE DETERMINE MAINTENANCE REQUIREMENT DETERMINE MONITORING REQUIREMENT DETERMINE REPLACEMENT REQUIREMENT ASSIGN PRIORITY RECORD FOLLOW UP

D. Maintenance Priority

Condition rating ≠ maintenance priority. A C3 runway centreline light may require higher priority than a C4 non-critical spare component, because asset criticality and operational consequence differ. The final decision therefore always weighs:

Decision FormulaCondition × Criticality × Failure Consequence × Redundancy × Availability
ConsidersAsset maintenance-priority assessment, criticality-based condition assessment, failure-consequence assessment, availability/reliability impact assessment, maintenance-risk assessment, planned-outage requirement assessment, and replacement-planning priority assessment.

E. Worked Example — Runway Edge Light

Illustrates how a condition inspection differs from a pass/fail current inspection, and why deterioration is intervened on before functional failure.

Current InspectionFixture operational → PASS
Condition InspectionLens degradation + corrosion + repeated moisture ingress + increasing maintenance interventions
Condition AssessmentC4 — Poor
DecisionContinue operation only under the applicable operational controls, increase monitoring, and plan replacement before functional failure.

F. The Key Difference from Other Divisions

Division 21 should not duplicate the individual inspection divisions — it asks a fundamentally different question about the same asset.

Division 02

"Is the runway fixture physically/optically acceptable today?"

Division 20

"Was the photometry/test evidence properly performed and documented?"

Division 21

"Is the runway fixture deteriorating, and should we intervene before it fails?"

G. Scope Boundary

Preventive-maintenance condition inspection is intended to

  • Assess the trajectory of an asset's condition — Healthy → Deteriorating → Maintenance Required → High Risk → Replacement Required — so that intervention happens before functional failure.

It does not replace

  • Daily and detailed physical/optical inspection (Divisions 01–19)
  • Photometric, electrical, and test-evidence verification (Division 20)
  • Corrective maintenance carried out in response to an identified failure

Central philosophy

  • Do not wait for failure to discover deterioration.

Frequently Asked Questions

Quick answers about preventive maintenance condition inspection in the AGL Inspection Handbook.

Q1What is Division 21 — Preventive Maintenance Condition Inspection in the AGL Inspection Handbook?

Division 21 contains 14 published topics in 17 sections (A–Q). It gives a standardized methodology for assessing the current condition, deterioration, remaining serviceability, maintenance requirement and failure risk of AGL assets before functional failure occurs, focused on condition-based maintenance and preventive-maintenance decision-making.

Q2How does Division 21 differ from the other inspection divisions?

It asks a different question about the same asset. Division 02 asks whether the runway fixture is acceptable today, Division 20 asks whether the test evidence was properly performed and documented, and Division 21 asks whether the fixture is deteriorating and whether to intervene before it fails.

Q3What is the asset condition rating scale?

A single scale applies across the division: C1 Excellent, C2 Good, C3 Fair, C4 Poor, C5 Critical and C6 Failed/Unserviceable. It is used together with asset criticality, not as a standalone decision, and each rating has a typical action from continuing normal inspection through to removal from service or replacement.

Q4Is the condition rating the same as maintenance priority?

No. Condition rating does not equal maintenance priority. The decision weighs condition, criticality, failure consequence, redundancy and availability, so a C3 runway centreline light may need higher priority than a C4 non-critical spare component.

Q5Can an asset pass a current inspection and still need intervention?

Yes. In the division's worked example, a runway edge light is operational and passes a current inspection, but lens degradation, corrosion, repeated moisture ingress and increasing maintenance interventions lead to a C4 Poor rating, with increased monitoring and planned replacement before functional failure.

Q6What does the condition-based maintenance workflow include?

It identifies the asset, reviews history, inspects current condition, reviews previous defects, test results and failure history, assesses deterioration, assigns a condition rating, assesses criticality and failure consequence, determines maintenance, monitoring and replacement requirements, assigns priority, and records follow-up.

Q7Do airport procedures take precedence over this handbook?

Yes. This handbook is an uncontrolled educational reference, not an approved procedure. The airport's approved inspection schedule, SMS procedures, ATC instructions, NOTAM procedures and local aerodrome regulations always take precedence, and the current revision of any official document should be verified before use.

Q8Can I download a printable checklist for each inspection topic?

Yes. Each inspection topic has a Download as Word option that produces an uncontrolled Word checklist template (description, a tick-box inspection table and an inspector sign-off block) for personal reference and internal training, to be reviewed and adopted under the user’s own document control.

Precision AGL Academy

Don't Just Inspect on Schedule. Understand the System.

Preventive maintenance condition inspection is where scheduled-interval and wear-trend condition awareness begins. Go beyond identifying defects and build the technical knowledge to understand why abnormalities occur, how they affect system serviceability, and when further testing, troubleshooting, maintenance or corrective action is required.

Build Practical AGL Inspection & Maintenance Capability

Develop structured knowledge across:

AGL Fundamentals Components Inspection Electrical Systems Photometry Testing Troubleshooting Maintenance Commissioning

Learn to connect the inspection process with the wider AGL engineering lifecycle.

Inspect with purpose. Understand the system. Act with technical confidence.

Talk to Precision AGL Academy

Follow the Academy