Meteorological Systems

RVR / Transmissometer for Runway Visibility Measurement

Automated visibility measurement, engineered as part of the whole weather system

Optical MeasurementRunway Visual RangeAWOS & ATIS IntegrationContinuous Monitoring

RVR (Runway Visual Range) / Transmissometer systems provide automated measurement of atmospheric visibility for airport meteorological monitoring and runway visual range assessment. An optical measurement path determines atmospheric extinction or visibility-related parameters and passes processed data to an airport weather observation system, RVR display, ATIS interface or other approved reporting infrastructure. Precision AGL Solutions provides configurations suited to airport weather networks, AWOS installations, ATIS systems and centralized monitoring platforms.

Supplied by Precision AGL Solutions

RVR / Transmissometer

For precision approach runways and low-visibility operations, reliable visibility measurement is an important part of the airport's overall meteorological and operational information system.

The final installation arrangement should be selected according to runway classification, operational requirements, sensor location criteria, reporting architecture and applicable aviation authority requirements.

Where RVR / Transmissometers Are Used

Precision Approach RunwaysRunway visual range measurement for precision approach operations.
Low-Visibility OperationsVisibility measurement supporting low-visibility airport operations.
Meteorological MonitoringAirport meteorological monitoring and automated weather observation systems.
ATIS & Weather ReportingRunway weather information networks, ATIS and aviation weather reporting.
Centralized MonitoringCentralized operations monitoring and multiple-runway installations.
Upgrade & ReplacementUpgrades and replacement of existing visibility measurement systems.

How a Transmissometer Works

A transmissometer measures the attenuation of light travelling through a defined atmospheric path. An optical transmitter and receiver are positioned at a known separation. Fog, mist, dust, smoke and other suspended matter reduce the light reaching the detector. The equipment processes this attenuation into an atmospheric visibility parameter. Configured for RVR, the visibility information can be combined with other runway and meteorological inputs to give runway visual range for operational reporting.

Many airports also use forward-scatter visibility sensors as the RVR input, which ICAO Doc 9328 recognises alongside transmissometers. A transmissometer measures over a fixed baseline, while a forward-scatter sensor measures a small sample volume. Select the sensor type from the airport's RVR requirement, the runway category and the aviation authority's approval basis.

A typical installation may include:

  • Optical transmitter
  • Optical receiver
  • Transmissometer mounting structures
  • Controller or processing unit
  • Communication interface
  • Power supply and protection
  • Local maintenance interface
  • Integration with AWOS/RVR processing equipment
  • Remote RVR or visibility display
  • Interface to ATIS or airport meteorological systems

From Transmittance to Runway Visual Range

The transmissometer measures transmittance (T) over a fixed baseline (L). From this the system derives the extinction coefficient (σ), and meteorological optical range (MOR) follows from it. RVR is then calculated for the pilot's viewing conditions, not just reported as MOR:

σ = −ln(T) / L  ·  MOR ≈ 3 / σ

By day

RVR is computed from the extinction coefficient and the background luminance (Koschmieder's law, for the visibility of a dark object against the horizon sky). Runway lights matter less in strong daylight.

By night and at low light

RVR is computed from the extinction coefficient and the intensity of the runway lights in use (Allard's law, for the range at which lights are seen). The processor needs the actual runway light brightness step from the constant current regulator (CCR) or the lighting control system.

AGL link: if the brightness step reaching the RVR processor does not match the step set on the CCR, the reported RVR will be wrong. Commissioning must verify this interface end to end, and it must be re-verified after any change to the lighting control system or CCR replacement. Confirm that the step table in the RVR processor matches the actual intensity of the approach, edge and centreline lights in use on that runway.

RVR Reporting Basics

ItemTypical ICAO practice (Annex 3 / Doc 9328)
When RVR is assessed and reportedRequired on CAT II/III runways. Also assessed for CAT I and other runways used in low visibility, whenever visibility or RVR falls below about 1,500 m
Reported rangeApproximately 50 m to 2,000 m; values outside are reported as below or above the limits
Reporting steps25 m below 400 m, 50 m from 400 to 800 m, 100 m above 800 m
Averaging periodOne minute for local reports and ATS displays; ten minutes for METAR/SPECI, with trend where required
Sensor positionsRepresentative of the touchdown zone; midpoint and stop-end as well for CAT II/III runways

Note: Values are given as general guidance. Confirm ranges, steps, averaging and the number of RVR positions against the current edition of Annex 3, Doc 9328 and your aviation authority's requirements before the page is used as a specification.

Typical Measurement Parameters

Depending on configuration, the installation may provide:

  • Atmospheric visibility
  • Meteorological optical range / visibility-related data
  • Transmittance or extinction-related measurement
  • RVR output where configured as an RVR system
  • Sensor status and equipment health information
  • Communication status
  • Diagnostic and maintenance data
  • Alarm or fault indications

Exact parameters, calculation methods, reporting resolution and interfaces depend on the selected equipment and airport system architecture.

What the System Provides

Accurate Optical Visibility MeasurementA controlled optical measurement path determines atmospheric attenuation and visibility conditions.
Continuous MonitoringDesigned for continuous operation, feeding visibility information to meteorological and operational systems.
Airport System IntegrationData can go to AWOS, RVR processors, ATIS, weather displays, operations systems and other approved interfaces.
Remote MonitoringStatus and measurements available to a central location over the configured network.
Diagnostic FunctionsDepending on model: optical performance, communication status, sensor condition, faults and maintenance indications.
Outdoor Airport ConstructionEnclosure, environmental protection, mounting and electrical protection selected for the installation conditions.
Expandable ArchitectureIndividual runway measurement points, or multi-runway airport meteorological networks.

Typical Configuration

ParameterTypical Configuration
Measurement principleOptical transmissometer / atmospheric light attenuation measurement
Measurement parameterAtmospheric visibility / transmissivity-derived visibility
RVR capabilityAvailable when configured as part of a compliant RVR system
Measurement rangeModel and configuration dependent
Measurement accuracyModel and environmental-condition dependent
Optical systemTransmitter and receiver with defined optical measurement path
Optical path lengthBaseline selected to suit the visibility range to be measured; shorter baselines favour low-visibility resolution, longer baselines extend the upper range
Reporting outputExtinction coefficient / MOR to the RVR processor; RVR in reporting steps from the processor
Light-intensity inputRunway light brightness step from the CCR or lighting control system
Background luminance inputAmbient light sensor for day/night computation
Data outputDigital communication interface, according to selected configuration
Communication interfaceEthernet, serial or other supported interface
Power supplyAirport AC/DC supply according to equipment configuration
Environmental performanceOutdoor airport environmental rating, model dependent
MountingDedicated poles, structures or equipment supports
EnclosureWeather-resistant outdoor construction
DiagnosticsEquipment and measurement-status monitoring
Maintenance interfaceLocal and/or remote service interface
System integrationAWOS, RVR processor, ATIS, weather display and airport network
InstallationSite-specific optical alignment and location requirements apply

Note: Exact measurement range, accuracy, optical path length, interface protocol, power consumption, environmental rating and mounting dimensions should be confirmed against the selected manufacturer's current technical documentation before procurement.

Main System Components

Transmitter UnitGenerates the controlled light beam for the measurement. Installed at one end of the path and kept aligned with the receiver.
Receiver UnitDetects the optical signal after it crosses the path. The signal is processed to determine atmospheric attenuation.
Optical Measurement PathThe path between transmitter and receiver forms the measurement volume. It must give representative measurements while meeting siting and operational requirements.
Controller / ProcessorProcesses sensor measurements and provides outputs to the meteorological system. May be in the field equipment or a separate RVR/AWOS processing unit.
Communication InterfaceCarries visibility measurements, status, alarms and diagnostics. Coordinate with the existing AWOS, RVR, ATIS, SCADA or airport network.
Background Luminance SensorMeasures ambient light for the day/night computation of RVR. Usually mounted separately from the transmissometer, with a clear view of the sky and no shadow or reflected light.
Mounting StructureMechanically stable and, within the operational area, frangible and mounted as low as the function allows. It must keep optical alignment and allow maintenance access.

A Complete RVR Measurement System

A transmissometer is one component of a complete RVR system. Depending on the airport configuration, RVR determination may require integration with:

  • Visibility measurement
  • Runway light intensity setting (brightness step from the CCR or lighting control system)
  • Background luminance (ambient light) sensor
  • Runway configuration
  • Sensor location
  • Relevant meteorological parameters
  • RVR processing algorithms
  • Operational reporting interfaces

Engineer the RVR architecture as a complete system, not the transmissometer as an isolated visibility sensor.

Installation Requirements

Correct installation is essential for reliable visibility measurement. The design should consider:

  • Transmitter and receiver separation
  • Optical alignment and sensor height
  • Runway geometry and sensor location relative to the runway
  • Obstructions within or near the optical path
  • Aircraft and vehicle clearance, including runway strip and obstacle-limitation surfaces
  • Frangible mounting of equipment within the operational area (Annex 14, Vol. I, Chapter 9)
  • Lateral offset from runway centreline and height above runway, to suit the sensor position
  • Effects of jet blast, spray, de-icing fluid and snow clearance on the optical windows
  • Maintenance access
  • Electrical power availability
  • Communication cable routing
  • Earthing and surge protection
  • Environmental exposure
  • Protection against accidental impact
  • Airport construction and safety restrictions

Establish exact sensor location from the applicable airport design criteria and operational requirements. Typical ICAO guidance puts sensors close to the runway (of the order of 120 m from the centreline or less) at about 2.5 m height, with the touchdown-zone sensor about 300 m from the threshold. Check these figures against Annex 3 Appendix 3 and Doc 9328 for your edition.

Optical Alignment

Transmissometer performance depends heavily on correct optical alignment. During installation and maintenance:

  1. Confirm the transmitter and receiver mounting positions.
  2. Verify mechanical stability of both structures.
  3. Align the optical axes according to the manufacturer's procedure.
  4. Check the optical measurement path for obstructions.
  5. Confirm signal strength and measurement stability.
  6. Record alignment and commissioning measurements.
  7. Repeat verification after major structural work or equipment relocation.

Follow the manufacturer's approved maintenance documentation.

Commissioning Procedure

Mechanical inspectionMounting integrity, fasteners, equipment orientation, cable entries, enclosure condition, access arrangements.
Electrical inspectionSupply voltage, protective devices, earthing, surge protection, cable termination, communication wiring.
Optical alignmentTransmitter/receiver alignment using the manufacturer's specified procedure.
Functional testingVisibility measurement, sensor status, communication, alarms, diagnostics, local indications, remote system display.
System integration testCorrect data transfer to AWOS, RVR processor, ATIS interface, central weather display, airport operations system.
DocumentationEquipment identification, installation position, alignment settings, calibration/verification results, communication settings, test results, initial maintenance condition.

Calibration, Verification and Maintenance

Visibility measurement equipment requires periodic verification to maintain confidence in reported data. Activities may include optical inspection, alignment verification, transmitter output and receiver response verification, window/lens cleaning, diagnostic review, communication testing, comparison against approved reference procedures, and calibration using manufacturer-approved equipment. Intervals follow the manufacturer's recommendations, the airport maintenance program and regulatory requirements.

Optical inspectionWindows, lenses, housings and exposed surfaces for contamination, moisture, damage or degradation.
Alignment checkTransmitter and receiver remain correctly aligned.
Mechanical inspectionMounting structures, brackets, fasteners, cable supports, enclosures.
Electrical inspectionPower supplies, protective devices, earthing, connectors, communication cables.
Functional testStable measurements and correct reporting of equipment status.
System comparisonWhere required, compare output with other approved visibility measurements or reference procedures.

Troubleshooting

SymptomPossible CauseRecommended Action
No visibility dataPower or communication failureCheck supply, controller and communication interface
Unstable measurementOptical contamination or alignment issueInspect and realign optical units
Reduced optical signalDirty window/lens or degraded optical componentClean and inspect optical surfaces
Communication alarmNetwork or interface faultCheck communication link and configuration
Incorrect or unexpected valuesSensor condition, calibration or environmental issueReview diagnostics and perform approved verification
Intermittent operationPower, connector or environmental problemInspect wiring, connectors and enclosure
Persistent optical faultTransmitter/receiver problemPerform manufacturer diagnostic procedure
RVR does not change with lighting brightness settingLight-intensity interface fault or wrong step mappingCheck CCR/lighting control feedback and the processor step table
Day/night changeover wrongBackground luminance sensor dirty, shaded or faultyClean, check view of the sky and verify luminance reading
RVR output unavailableRVR processing/integration faultCheck visibility input and RVR processor interface

Use the manufacturer's approved service procedures and airport maintenance requirements.

Environmental Performance and Electrical Protection

Environmental Exposure

  • Rain, fog, mist, dust and sand
  • High humidity and condensation
  • Temperature variation and solar radiation
  • Wind
  • Electrical transients
  • Bird and wildlife activity
  • Operating temperature, humidity, ingress protection and wind loading are model-specific; confirm during technical evaluation

Electrical Protection

  • Overcurrent protection
  • Surge protection
  • Equipment earthing and lightning protection
  • Shielding and cable segregation
  • Communication-line protection
  • Proper termination of field cables
  • Coordinate with the airport electrical design and lightning environment

Replacement and Retrofit Applications

Equipment can be supplied for new runway installations, existing RVR upgrades, replacement of obsolete transmissometers, AWOS modernization, migration to digital communications, replacement of legacy visibility sensors, and integration with centralized airport weather networks.

For retrofits, review the existing sensor locations, optical path, mounting structures, power supply, communication architecture and RVR processing equipment before selecting replacements.

Ordering Checklist

Before ordering, confirm:

  • Runway and installation location
  • Required visibility measurement range
  • RVR requirement
  • Number of measurement positions
  • Optical path arrangement
  • Required measurement accuracy
  • Required data outputs
  • Communication interface
  • AWOS and ATIS integration requirements
  • Existing RVR processor compatibility
  • Power supply
  • Environmental requirements
  • Mounting arrangement
  • Cable lengths and routing
  • Surge and lightning protection
  • Calibration requirements
  • Maintenance access
  • Spare parts requirements
  • Required documentation
  • Applicable airport authority requirements

Standards, References and Documents

Standards and References

  • ICAO Annex 3 – Meteorological Service for International Air Navigation
  • ICAO Annex 14, Volume I – Aerodrome Design and Operations
  • ICAO Doc 9328 – Manual of Runway Visual Range Observing and Reporting Practices
  • WMO-No. 8 – Guide to Instruments and Methods of Observation
  • ICAO Annex 3, Appendix 3 – technical specifications for observations and reports (RVR assessment, averaging and reporting)
  • ICAO Doc 9837 – Manual on Automatic Meteorological Observing Systems at Aerodromes
  • Applicable FAA requirements for RVR and visibility measurement systems
  • DGCA India requirements and the meteorological authority (IMD) requirements for aerodrome observing systems
  • Airport-specific technical specifications
  • Manufacturer installation and maintenance manuals

Documentation

  • Technical datasheet and product catalogue
  • System configuration
  • Installation, operation and maintenance manuals
  • Wiring diagrams and mounting details
  • Communication/interface documentation
  • Calibration or verification documentation
  • Factory and site acceptance test documentation
  • Recommended spare parts list
  • Preventive maintenance schedule

Confirm the applicable edition and exact compliance requirements during project design and procurement. Numerical values on this page (reporting steps, averaging periods, sensor positions) are general ICAO guidance and are not a substitute for the current Annex 3, Doc 9328 and DGCA/IMD requirements.

Selection Based on Your Runway and Systems

We support visibility measurement projects with equipment selection based on the actual runway, meteorological, electrical, communication and integration requirements, so the solution integrates reliably with the airport's meteorological and operational infrastructure.

RVR System ConfigurationMatched to runway and reporting needs.
Transmissometer SelectionRange, path and interface chosen for the site.
Sensor Location ReviewAgainst airport design criteria.
AWOS & ATIS IntegrationInterface and communication architecture.
Retrofit AssessmentExisting-system review before replacement.
Commissioning & SparesInstallation, commissioning and maintenance planning.

RVR / Transmissometer — Frequently Asked Questions

What is an RVR / transmissometer system?

It provides automated measurement of atmospheric visibility for airport meteorological monitoring and runway visual range assessment. An optical measurement path determines atmospheric extinction, and the processed data goes to an airport weather observation system, RVR display, ATIS interface or other approved reporting infrastructure.

How does a transmissometer work?

It measures the attenuation of light travelling through a defined atmospheric path between an optical transmitter and receiver at a known separation. Fog, mist, dust, smoke and other suspended matter reduce the light reaching the detector, and the equipment processes this attenuation into a visibility parameter.

How is RVR calculated from the transmissometer reading?

The transmissometer measures transmittance (T) over a fixed baseline (L), from which the extinction coefficient is σ = −ln(T) / L and meteorological optical range follows as MOR ≈ 3 / σ. RVR is then calculated for the pilot viewing conditions: by day from the extinction coefficient and background luminance (Koschmieder), and at night from the extinction coefficient and runway light intensity (Allard).

Why does RVR depend on the runway light brightness step?

At night and in low light the processor needs the actual runway light brightness step from the CCR or lighting control system. If the step reaching the RVR processor does not match the step set on the CCR, the reported RVR will be wrong, so commissioning must verify this interface end to end and re-verify it after any change to the lighting control system or CCR replacement.

Can a forward-scatter sensor be used instead of a transmissometer?

Many airports use forward-scatter visibility sensors as the RVR input, which ICAO Doc 9328 recognises alongside transmissometers. A transmissometer measures over a fixed baseline, whereas a forward-scatter sensor measures a small sample volume. Select the type from the airport RVR requirement, the runway category and the aviation authority approval basis.

Where should RVR sensors be located?

Establish the exact location from the applicable airport design criteria. Typical ICAO guidance puts sensors close to the runway, of the order of 120 m from the centreline or less, at about 2.5 m height, with the touchdown-zone sensor about 300 m from the threshold. Check these figures against Annex 3 Appendix 3 and Doc 9328 for your edition. Equipment within the operational area should be frangibly mounted.

What are the typical RVR reporting rules?

General ICAO guidance gives a reported range of approximately 50 m to 2,000 m, with steps of 25 m below 400 m, 50 m from 400 to 800 m and 100 m above 800 m, and averaging of one minute for local reports and ATS displays and ten minutes for METAR/SPECI. RVR is required on CAT II/III runways. Confirm against the current Annex 3, Doc 9328 and DGCA/IMD requirements before using these as a specification.

Why is optical alignment important?

Transmissometer performance depends heavily on correct optical alignment. Confirm the mounting positions and mechanical stability of both structures, align the optical axes per the manufacturer procedure, check the path for obstructions, confirm signal strength and stability, record the results and repeat verification after major structural work or equipment relocation.

What is the role of the background luminance sensor?

It measures ambient light for the day and night computation of RVR. It is usually mounted separately from the transmissometer with a clear view of the sky and no shadow or reflected light. A wrong day or night changeover can point to a dirty, shaded or faulty sensor.

What maintenance and troubleshooting does it need?

Periodic optical inspection, alignment verification, window and lens cleaning, diagnostic review, communication testing and calibration or verification using manufacturer-approved procedures. For unstable measurement check contamination and alignment, for no data check supply and communication, and if RVR does not change with the lighting brightness setting check the CCR feedback and the processor step table.

Which standards apply to RVR systems?

References include ICAO Annex 3 and its Appendix 3, ICAO Annex 14 Volume I, ICAO Doc 9328, ICAO Doc 9837, WMO-No. 8, and DGCA India and IMD requirements for aerodrome observing systems. Confirm the applicable edition for the project. See also the Wind & Visibility Display page for presenting RVR to operations staff.

What should I confirm before ordering?

Confirm the runway and installation location, required visibility measurement range, RVR requirement, number of measurement positions, optical path arrangement, accuracy, data outputs, communication interface, AWOS and ATIS integration, compatibility with the existing RVR processor, power supply, environmental requirements, mounting, surge and lightning protection, calibration and documentation.

Procurement Information for Indian Projects

Indian public tenders commonly ask for the documents below. State which ones your tender requires when you send the enquiry, so they are covered in the quotation.

  • Manufacturer / OEM authorisation
  • Country of origin and local-content declaration (for Make in India purchase preference)
  • Type-test and routine-test certificates, and the FAA / ICAO / IEC compliance documents named in the specification
  • Datasheets, drawings and installation instructions
  • Warranty, delivery period and spares support
  • GeM catalogue or tender-portal requirements, where applicable

Request RVR System Requirements Review

Planning a new RVR installation, replacing an existing transmissometer, or upgrading an airport weather monitoring system? Share your runway configuration, required RVR measurement points, existing equipment, communication interface and airport integration requirements. We can help identify the appropriate transmissometer, RVR processing architecture, mounting arrangement, interfaces and supporting equipment.

Engineering Note

An RVR / transmissometer installation should be treated as part of the complete airport meteorological measurement and reporting system. Sensor selection alone does not establish RVR compliance. RVR is calculated from transmittance, background luminance and the runway light intensity in use, and the sensor positions must represent the touchdown zone, midpoint and stop-end as required for the runway category.

Final equipment selection should consider the runway operational category, sensor location, optical measurement arrangement, runway lighting information, processing architecture, reporting requirements, applicable aviation regulations and the manufacturer's current technical documentation.

Product Disclaimer

Product availability, configuration, dimensions, electrical characteristics, photometric performance, certifications and compliance status depend on the selected manufacturer and project specification. The technical values published on this page should not be treated as a substitute for the manufacturer's current approved Technical Data Sheet.

Final selection shall be based on the approved project specification, applicable aviation standards, authority requirements, manufacturer documentation and site conditions. Use of this page is also subject to the Legal Notice, Disclaimer & Terms of Use.

Standards and editions referenced on this site are listed on the Standards Reference page.

Talk to Precision AGL Solutions

Follow Precision AGL Solutions

Our Academy: Precision AGL Academy