Cable Test Point
A dedicated access point in the AGL series circuit that provides safe, convenient connection for test instruments to measure current, voltage, insulation resistance, and loop continuity. Typically located in junction boxes, handholes, or test panels, it enables rapid fault diagnosis, commissioning verification, and routine maintenance without disturbing the primary cable terminations.
Image disclaimer: For identification and illustration only. It may show a product by another manufacturer and may not depict the exact item described; it is not a statement of any product’s quality, approval or performance. Third-party image and trademark rights belong to their owners. See full notice.
What Is It?
A Cable Test Point is a dedicated access point installed in the AGL primary or secondary circuit that allows test instruments to be safely connected for measurement and diagnostic purposes. It provides a convenient, reliable, and safe means of accessing the circuit conductors without needing to open cable joints, disconnect connectors, or interrupt service unnecessarily.
Key characteristics of cable test points include:
- Accessible Terminals: Provides test terminals or probe points that are electrically connected to the circuit conductors, allowing measurement of current, voltage, resistance, and insulation integrity.
- Safe Isolation: Designed with covers, test sockets, or probe ports that prevent accidental contact with live conductors while allowing authorised access for testing.
- Waterproof Enclosure: Housed in an IP68-rated enclosure (junction box or handhole) that protects the test point from moisture, dirt, and mechanical damage in the airfield environment.
- Multiple Connection Options: May include banana sockets, test probes, terminal blocks, or L-823 connectors (plug or receptacle) for connecting test instruments.
- Clear Identification: Marked with circuit identification, voltage rating, and test point designation to facilitate correct instrument connection.
Test points are strategically located along the series circuit, typically at regular intervals, at circuit endpoints, at transition points between underground and elevated sections, and at key equipment interfaces. They are essential for efficient commissioning, troubleshooting, and periodic maintenance of AGL systems.
Purpose & Function
The cable test point exists to make routine and diagnostic testing possible without the disruption a technician would otherwise face: opening a cable joint or disconnecting a live connector just to take a measurement risks introducing a new fault at exactly the connection that was previously working fine, and interrupts service to every fixture downstream on the loop. A dedicated, safely isolated access point removes that trade-off entirely.
By positioning these points at regular intervals, circuit endpoints, and key transitions, the design ensures that a fault anywhere along a long cable run can be localised by testing at successive points rather than requiring access at some arbitrary location the circuit happens to pass through. This structured access is what makes systematic commissioning checks and future fault-finding practical on an airfield where cable runs can extend for kilometres underground.
Where Is It Used?
Cable test points are used throughout the airfield at strategic locations in the AGL system, including:
- Primary Series Circuit Test Points: Installed in handholes or junction boxes along the runway and taxiway primary cable routes, providing access for current measurement, loop resistance testing, and insulation resistance checks.
- CCR Output Test Points: Located at the CCR output panel or in the field near the CCR, allowing verification of output current and voltage during commissioning and maintenance.
- Transformer Test Points: Some isolating transformers include built-in test points on the primary or secondary side for verifying transformer performance and secondary circuit integrity.
- End-of-Loop Test Points: Installed at the end of a series loop (typically in a handhole at the far end of the runway or taxiway) to verify loop continuity and measure overall loop resistance.
- Transition Points: At the interface between underground and elevated cable sections, test points allow verification of the connection integrity and insulation at the transition.
- Junction Boxes and Splice Enclosures: Many junction boxes include test point terminals or probe ports for easy access to the circuit conductors without opening cable splices.
- ALCMS and Monitoring Systems: Some test points are integrated with remote monitoring systems, providing continuous or periodic measurement of circuit parameters.
Test points are typically installed during initial construction and are documented in the as-built drawings, with their locations clearly marked on the airfield and in maintenance records.
Installation & Location
Test points are installed at the time of initial construction, typically within a handhole or junction box positioned at regular intervals along the primary series circuit, at the end of each loop, and at the transition between underground and elevated cable sections. Positioning inside a sealed, IP68-rated enclosure keeps the test terminals protected from moisture and dirt while still reachable by lifting a cover rather than excavating or disturbing the buried cable. Where a test point is associated with a specific piece of equipment — a CCR output or an isolating transformer — it's sited immediately adjacent to that equipment so the measurement taken reflects that specific interface rather than a length of cable further along the run. Locations are recorded in the as-built drawings and marked at the airfield surface, since a test point that can't be found again defeats the purpose of having installed it in the first place.
How Does It Work?
A cable test point provides a safe and convenient interface between the circuit conductors and test instruments. Its design ensures that measurements can be taken accurately and safely without disturbing the circuit terminations:
- Circuit Connection: The test point terminals are permanently connected (tapped) to the circuit conductors using reliable, low-resistance connections. For primary circuits, the connection is typically made by splicing or tapping the test point into the main conductor using approved methods.
- Isolation and Safety: The test point is housed in a secure enclosure with a cover or locking mechanism. Access requires a tool or key, preventing unauthorised contact with live conductors. Some test points include fuse protection or current-limiting resistors to protect the test instrument and the operator.
- Test Instrument Connection: Test instruments (multimeters, loop resistance testers, insulation testers, current clamps) are connected to the test point using appropriate leads, probes, or connectors. The test point may include:
- Banana Sockets (4mm): Industry-standard test sockets for connecting multimeter leads.
- Test Probe Ports: Sealed ports that allow probe insertion for direct contact with the circuit conductors.
- L-823 Connectors: A plug or receptacle that allows connection of a dedicated test lead assembly.
- Terminal Blocks: Screw terminals that accept ring or spade lugs from test leads.
- Measurement Types: The test point enables various measurements:
- Loop Current: Measuring the series circuit current with a clamp meter or inline ammeter.
- Voltage Drop: Measuring voltage across the loop or across individual segments to identify high-resistance connections.
- Loop Resistance: Measuring the total resistance of the series loop to verify conductor integrity and connection quality.
- Insulation Resistance: Measuring the insulation resistance between conductors and earth to detect cable damage or moisture ingress.
- Continuity: Verifying that the circuit is complete and that there are no open-circuit faults.
System Architecture & Control Logic
A test point carries no logic of its own — it is a permanently wired-in access point that makes the loop-level fault model used across the AGL system practical to act on. When the ALCMS reports a loop voltage anomaly, that report identifies the circuit, not the location of the fault; test points spaced along the loop (often co-located with, or built into, junction boxes) are what let a technician bisect the loop with a resistance or insulation-resistance reading, halving the search each time, without breaking a single splice or disturbing a fixture connection. Because the test point taps the conductor directly rather than through any active sensing electronics, it reads exactly what the CCR and regulator monitor read at that point in the loop, so a discrepancy between a test-point measurement and the CCR's own reported loop parameters localises the fault to one side of that test point or the other. This makes the test point the field-level counterpart to the CCR regulator monitor's control-room-level view of the same circuit.
Test & Measurement Path
Physical Construction
The test point is built around a set of test terminals — banana sockets, an L-823 connector, or a small terminal block — potted or moulded into a polycarbonate, PVC, or brass housing that isolates the live terminals from accidental contact while still allowing a test probe to be inserted. Internal connection to the primary or secondary conductor is made by a crimped, soldered, or compression tap, chosen so the tap itself is at least as reliable as the cable splice it's placed alongside, since a failed tap connection would introduce a fault into the circuit it was meant to help diagnose. The housing is gasket-sealed to achieve an IP68 rating, allowing the test point to be installed inside a handhole or junction box that may see standing water, and shrouded or recessed sockets prevent inadvertent contact with the primary circuit's several-kilovolt open-circuit voltage when the point isn't in active use. Where fuse protection is fitted, it sits inline between the tap and the test terminals in its own small compartment, replaceable without disturbing the tap connection to the main conductor.
Technical Parameters
| Parameter | Typical Value |
|---|---|
| Voltage Rating | 5kV (primary), 600V (secondary) — insulation rating |
| Current Rating | 6.6A or 20A (series circuit rating) |
| Connection Type | Banana sockets, test probes, L-823 connector, terminal blocks |
| Enclosure Material | Polycarbonate, PVC, or brass with IP68 rating |
| Protection Class | IP68 (submersible, continuous) |
| Operating Temperature | -40°C to +85°C |
| Conductor Connection | Crimped, soldered, or compression tap to primary/secondary conductor |
| Test Lead Compatibility | 4mm banana plugs, L-823 plugs, or custom test leads |
| Safety Features | Shrouded sockets, keyed access, fuse protection (optional) |
| Cable Size Compatibility | 6 AWG to 2 AWG (primary); 1.5mm² to 6mm² (secondary) |
| Standards | IEC 61010, IEEE 404, FAA AC 150/5345-26 |
Electrical Requirements
| Requirement | Typical Value |
|---|---|
| Circuit Rating | 5kV primary / 600V secondary insulation, 6.6A or 20A series circuit current |
| Conductor Tap | Crimped, soldered, or compression tap to the primary/secondary conductor |
| Isolation from Live Parts | Shrouded sockets and keyed access to prevent accidental contact while live |
| Enclosure | IP68-rated junction box, handhole, or test panel |
| Earthing/Grounding | Enclosure and any exposed metalwork bonded to airfield earth grid |
| Fuse Protection | Optional inline fuse on test leads for instrument protection |
| Power Source | Not independently powered — taps the existing primary/secondary circuit conductors |
Applicable Standards
IEC 61010
Safety requirements for electrical equipment for measurement, control, and laboratory use
IEEE 404
Standard for extruded and laminated dielectric shielded cable joints — relevant background for testing shielded circuits in this voltage range
FAA AC 150/5345‑26
Specification for L‑823 Plug and Receptacle, Cable Connectors, where the test point uses an L‑823 interface
ICAO Annex 14
General requirements for AGL circuit maintenance and testing access
Installation Requirements
Handhole/Junction Box Positioning
CivilPosition the test point at regular intervals along the primary series circuit, at the end of each loop, and at the transition between underground and elevated cable sections, within a handhole or junction box.
Equipment-Adjacent Siting
CivilWhere the test point is associated with specific equipment — a CCR output or an isolating transformer — site it immediately adjacent so the measurement reflects that interface rather than a length of cable further along the run.
Conductor Connection
ElectricalCrimp, solder, or compression-tap the test terminal to the primary or secondary conductor, matching the connection method to the cable size.
IP68 Enclosure Sealing
ElectricalSeal the test point within its IP68-rated enclosure so the terminals stay protected from moisture and dirt while remaining reachable by lifting the cover.
Surface Marking
DocumentationMark the test point's location at the airfield surface so it can be found again without excavating or disturbing the buried cable.
As-Built Location Recording
DocumentationRecord the test point's position in the as-built drawings.
Insulation/Continuity Baseline Check
DocumentationTake and record a baseline reading through the new test point before it's relied on for future fault-finding.
Pre-Energisation Sign-off
DocumentationRecord connection method, enclosure seal, and baseline reading as-built before the site is closed.
Testing & Commissioning
Conductor Tap Connection Check
InstallationConfirm the test point's tap connection is correctly terminated and torqued to the circuit conductor before the joint is closed up.
Insulation Resistance Test
Pre-EnergisationMegger through the test point to confirm it has not degraded the circuit's overall insulation resistance.
Fuse Protection Check
Pre-EnergisationConfirm fuse rating and function match the design, where a fuse is fitted to protect the test tap.
Socket/Probe Contact Verification
Final AcceptanceConnect test instrument probes and confirm a stable, repeatable reading with no intermittent contact.
Safety Shroud & Access Verification
Final AcceptanceConfirm the shroud or cover excludes accidental contact with live conductors while still allowing safe, quick test access.
Documentation & As-Built Sign-off
Final AcceptanceRecord insulation resistance and test point location in the commissioning dossier.
Inspection & Maintenance
Socket & Probe Contact Check
AnnualInspect banana sockets and test probe contacts for corrosion or wear so test readings remain accurate and reliable.
Seal & Enclosure Inspection
AnnualCheck the polycarbonate, PVC, or brass enclosure and its seals to confirm the rated IP68 protection is intact.
Conductor Tap Connection Check
AnnualRe-verify crimped, soldered, or compression tap connections to the primary/secondary conductor to confirm low-resistance, secure contact.
Insulation Resistance Test
AnnualMegger-test the test point connection to confirm insulation resistance stays above the minimum, flagging moisture ingress before it causes a fault.
Safety Shroud & Access Check
AnnualConfirm shrouded sockets and keyed access covers remain functional so live testing can only be performed by authorised personnel with the correct leads.
Fuse Protection Check
AnnualWhere fuse protection is fitted, verify the fuse rating is correct and undamaged before the test point is next used.
Labelling & Circuit Identification Check
AnnualConfirm the test point's circuit identification remains legible so technicians select the correct point during fault-finding.
Pit/Surround Condition Check
Semi-annualCheck the surrounding pavement or pit for standing water, debris, or settlement that could affect access or seal integrity.
Common Field Issues
Corrosion of Test Terminals
Despite protective enclosures, test terminals can corrode over time, especially in coastal or chemically aggressive environments. Regular inspection and cleaning of terminals, along with application of corrosion-inhibiting compound, are recommended.
Water Ingress into Test Point Enclosure
If the enclosure cover is not properly sealed or the gasket is damaged, moisture can enter and cause corrosion or short circuits. Inspect seals regularly and replace if damaged.
Loose or High-Resistance Connections
The test point's connection to the circuit conductor can become loose over time due to vibration or thermal cycling, resulting in high resistance and measurement errors. Periodically verify the connection integrity and tighten as required.
Inaccessible Test Points
Test points that are buried under asphalt, overgrown with vegetation, or obscured by equipment can be difficult to locate and access. Maintain clear access routes and keep test point locations documented and marked.
Incorrect Test Equipment Connection
Using the wrong test leads or connecting to the wrong terminals can damage the test instrument or give incorrect readings. Ensure that test leads are correctly rated for the circuit voltage and that the correct terminals are used.
Loss of Identification Markings
Test point identification labels can fade or become detached, leading to confusion during maintenance. Use durable, UV-stabilised labels and periodically reapply as needed.
Inadequate Test Point Density
If test points are spaced too far apart, it may be difficult to locate the exact location of a fault. Install test points at regular intervals (typically every 300-500m) and at all key circuit transition points.
Troubleshooting Guide
Erratic or Drifting Insulation Resistance Readings
Corrosion or Moisture Found Inside the Enclosure
Measurement Results Inconsistent with Known Circuit Condition
Test Point Cannot Be Located in the Field
Instrument Reads Zero, Overload, or Damages on Connection
Failure Modes & Root Causes
Terminal Corrosion
Enclosure Gasket / Seal Failure
Loose or High-Resistance Terminal Connection
Enclosure Physical Damage
Location Record Drift
Safety & Operational Notes
Series Circuit Isolation
Electrical SafetyThe test point sits on a constant-current series loop that can carry several kV. De-energise and lock out the CCR, then verify zero energy before opening the enclosure or disconnecting terminals.
Airside Work Coordination
OperationalWhere the test point lies within the movement area or its safety zone, obtain ATC/airside coordination and a NOTAM as needed, and keep personnel and vehicles clear of active runway or taxiway operations.
PPE & Insulated Tools
Personnel SafetyUse insulated tools and appropriate PPE when connecting or disconnecting test leads on a series circuit, and confirm the enclosure is bonded/grounded per the electrical design before closing it up.
FOD Control at the Enclosure
OperationalKeep tools, fasteners, and the cover gasket accounted for at all times when the enclosure is open, and confirm nothing is left loose in the surrounding turf or pavement before leaving the site.
Confirm De-Energised Before Megger Testing
Electrical SafetyNever connect a megger or insulation tester to a live circuit; verify isolation at the test point itself immediately before testing, even if the circuit was switched off elsewhere.
Discharge Stored Energy
Electrical SafetyAllow for and confirm discharge of any residual capacitive or inductive energy in the loop before handling terminals, particularly after a megger test or on long cable runs.
Secure Enclosure After Testing
ComplianceReinstate the gasket and cover correctly and confirm the enclosure is properly seated and secured before re-energising, so weatherproofing and mechanical protection are not left compromised.
Restore to Compliant State
ComplianceDo not leave the circuit de-energised or the loop open longer than necessary; verify insulation resistance and continuity are within tolerance before restoring power and closing out the work.
Engineering & Expert Notes
Undocumented Test Points Cost Hours During Fault-Finding
ProcessA test point that isn't accurately marked on the as-built loop drawing forces a technician to hunt for access during a fault, right when time matters most. Keep test point locations and their loop segment mapping current whenever circuit work changes the layout.
A Flooded Test Point Pit Reads Like a Cable Fault
DiagnosticsStanding water inside a test point enclosure can depress an insulation resistance reading enough to suggest a cable fault when the actual issue is water at the connection itself. Check and, if needed, drain the enclosure before condemning the cable based on a poor reading taken there.
Use Test Points to Bracket a Fault, Not Just Confirm One
TechniqueTesting from intermediate test points along a loop, rather than only from the two ends, narrows a suspected fault to a shorter cable segment far faster than end-to-end testing alone. Plan test point spacing with fault-bracketing in mind, not just circuit access.
Corroded Terminals Inside the Test Point Add False Resistance
MaintenanceCorrosion on the terminals inside a test point enclosure adds resistance that has nothing to do with the cable being tested, and can produce a misleadingly poor reading. Clean terminal surfaces as part of routine test point maintenance, not only when a reading looks suspicious.
Confirm Isolation at the Test Point Itself, Not Just Upstream
Electrical SafetyVerifying isolation at the CCR alone doesn't guarantee zero energy at a downstream test point if an unexpected cross-connection or backfeed exists on the loop. Always confirm zero energy directly at the test point before working on it, regardless of the upstream isolation status.
Log Readings Against the Specific Test Point ID
ComplianceTying insulation and continuity readings to a specific test point ID, rather than a general loop description, makes it possible to see whether degradation is concentrated in one cable segment or spread across the whole loop when reviewing trend data later.
Frequently Asked Questions
Short answers about cable test points: what they do, ratings, siting, standards, maintenance and common faults.
Q1What is a cable test point?
A cable test point is a dedicated access point in an AGL primary or secondary circuit that lets test instruments be connected safely for measurement and diagnosis. It gives access to the circuit conductors without opening cable joints, disconnecting connectors or unnecessarily interrupting service.
Q2Why not just open a joint or unplug a connector to test?
Doing so risks introducing a new fault at a connection that was working fine, and interrupts service to every fixture downstream on the loop. A dedicated, safely isolated access point removes that trade-off.
Q3What can be measured at a test point?
Current, voltage, loop resistance and insulation resistance. Primary circuit test points give access for current, loop resistance and insulation checks, and CCR output test points allow output verification during commissioning and maintenance.
Q4Where are cable test points installed?
In handholes or junction boxes at regular intervals along the primary series circuit, at the end of each loop and at transitions between underground and elevated cable, plus at the CCR output panel. Some isolating transformers include built-in test points. They are put in at initial construction.
Q5What are the ratings?
5 kV insulation rating on the primary and 600 V on the secondary, for 6.6 A or 20 A series circuits, in an IP68 enclosure of polycarbonate, PVC or brass. Cable compatibility is 6 AWG to 2 AWG (primary) and 1.5 to 6 mm² (secondary).
Q6How is a test point made safe?
Shrouded sockets and keyed access covers prevent accidental contact while live, so testing can only be done by authorised personnel with the correct leads. An optional inline fuse on the test leads protects the instrument.
Q7What connections does it use?
Banana sockets (4 mm plugs), test probes, L-823 connectors or terminal blocks, tapped to the conductor by crimp, solder or compression. It is not independently powered.
Q8Which standards apply to cable test points?
The main references are IEC 61010, IEEE 404 (shielded cable joints), FAA AC 150/5345-26 where the test point uses an L-823 interface, and ICAO Annex 14. Always verify the current edition and your approved requirements.
Q9How often should a cable test point be inspected?
Typically annually: socket and probe contacts, seal and enclosure condition, conductor tap connections, insulation resistance, safety shroud and access, and fuse protection where fitted. Your approved maintenance programme takes precedence.
Q10Why are insulation resistance readings erratic or drifting?
Corroded test terminals may be adding contact resistance that varies with cleaning or weather, not a real change in cable insulation. Clean the terminals, apply corrosion-inhibiting compound and retest, and only investigate the cable itself if drift persists.
Q11Why is there moisture or corrosion inside the enclosure?
A damaged or badly seated gasket has let water in. Inspect the cover, gasket and seal, check for standing water, and replace the seal before returning the test point to service.
Related Components
Go Beyond the Component. Understand the Complete AGL System.
You have explored the component. Now understand how it works within the complete Airfield Ground Lighting system.
Learn AGL from fundamentals to design, installation, testing, photometry, commissioning, maintenance and troubleshooting through structured technical training at Precision AGL Academy.
Build practical knowledge. Understand the circuit. Read the standards. Troubleshoot with confidence.
Your next step in AGL starts here.
Need expert guidance on cable test point selection and installation for your AGL project?
Precision AGL Academy provides advice on test point placement, selection, and best practices for effective system testing and maintenance.
Follow the Academy
Important Notice, Disclaimer & Limitation of Liability
Please read before relying on any content on this page.
- Purpose and intended users. This page on Cable Test Point is an independent educational and informational reference for competent, suitably trained and authorised airfield ground lighting (AGL) and aerodrome electrical personnel. It is not professional engineering, legal or regulatory advice, and using it does not create any professional or client relationship.
- Safety. Work on series circuits, constant current regulators (CCRs), isolating transformers, cables, connectors and lighting equipment can be fatal. Always apply the aerodrome’s permit-to-work and isolation/LOTO procedures, prove dead, use correctly rated instruments and PPE, and follow the manufacturer’s instructions. Nothing here authorises work on live equipment or the bypassing of any safety device or interlock.
- Aviation operations. Nothing here authorises installation, modification, energisation, adjustment, return to service, a change of operating category (CAT I/II/III), a NOTAM or any aerodrome certification or approval decision. These rest with the aerodrome operator, the air navigation service provider and the competent regulator.
- Specifications, ratings and typical values. Descriptions, parameters, ratings, dimensions, photometric values, wattages, service lives, maintenance tasks and intervals, failure modes, certifications (for example CE, FCC, UL or IEC marks) and part or type designations are general, typical and indicative. They may not match any particular product, make, model or version, and they are not a datasheet, design, specification, selection, sizing, procurement or acceptance criterion. The manufacturer’s current documents, the approved design and the project specification prevail.
- Standards and regulations. References to ICAO, FAA, IEC, IEEE, ISO, BIS, DGCA and other standards are paraphrased summaries for orientation only. They may be incomplete or out of date, and standards are revised from time to time. Consult the current official editions. Following this content does not guarantee compliance with any law, standard or regulatory approval, and the regulator’s requirements always prevail.
- No warranty. Content is provided “as is” and “as available”, without warranty of any kind, express or implied, including accuracy, completeness, currency or fitness for a particular purpose. Real installations differ in design, equipment make and model, age and condition.
- Limitation of liability. To the fullest extent permitted by applicable law, Precision AGL Academy, Precision AGL Solutions and their owners, authors and contributors are not liable for any injury, death, loss, damage, downtime, penalty or regulatory consequence, whether direct or indirect, arising from the use of, reliance on, or inability to use this content. Nothing in this notice excludes or limits any liability that cannot lawfully be excluded or limited.
- Independence, brands and no endorsement. This is an independent publication. It is not affiliated with, sponsored by or endorsed by ICAO, the FAA, the IEC, DGCA, AAI, any airport, regulator, supplier or equipment manufacturer. Third-party names, product designations, standard designations and trademarks (including Megger®, Siemens, Eaton, Crouse-Hinds, ADB SAFEGATE, Fluke, ABB and Honeywell) belong to their respective owners and are used only for identification and description. Mention of a brand, product or supplier is not a recommendation, and we do not sell, supply or quote for any component described.
- Images and third-party content. Images and illustrations are shown to help identify the type of component. They may show products of various manufacturers, may not depict the exact item described, and are not a statement about any product’s quality, approval or performance. Copyright and trademarks in third-party images, logos and photographs belong to their respective owners and are not claimed as ours. If you are a rights holder and want an image removed, replaced or credited, email precisionaglsolutions@gmail.com with the page address and we will act promptly.
- Training and services. Mentions of training, courses, consultation, advice, selection, installation, calibration or other support, including the “Learn…Certify” pathway, describe learning stages and are not an offer, quotation, tender or promise of any result. Contacting us or our replying creates no engagement or duty of care; an engagement exists only under a written agreement. We are not a regulator or certification body, and completing any course or reading this content is not a certification, accreditation or authorisation to work on any aerodrome.
- Copyright, privacy and corrections. © 2026 Precision AGL Academy. All rights reserved. Text, structure, compilations and diagrams may be viewed for personal reference and internal training only; any other copying, republication or commercial use needs our written permission. If you email, telephone or message us, we use your details only to respond and handle your matter, in line with applicable Indian law including the Digital Personal Data Protection Act, 2023; please do not send confidential or security-sensitive information. To display this page your browser requests fonts, icons and images from third-party servers, which receive your IP address and browser details under their own policies. Content is reviewed periodically with no obligation to update. To report an error, safety concern or rights issue, write to precisionaglsolutions@gmail.com.