Division 22 · SPL · Inventory-Driven Strategy

Spare Parts & Asset Lifecycle Maintenance

The spares-management and asset-lifecycle control layer of the handbook. It connects maintenance with the practical questions of what spare is required, how much should be stocked, whether it is available, how it is stored, and when the asset itself should be repaired, replaced or retired.

The key question: is the required spare available, identifiable, serviceable and traceable — and is the asset it supports still worth maintaining?

Distinction: Divisions 01–05 decide what maintenance to perform. Division 22 decides whether the parts exist to perform it, and tracks the asset across its full life — from installation to retirement and disposal — using the maintenance and failure history captured in Division 21.

34
Topics in Division
03
Topic Groups (A–C)
07
Spare Status Categories
10
Step Lifecycle Path

Spares & Lifecycle Philosophy

Every asset moves along the same continuous path — maintenance consumes spares, spares get replenished, and the accumulated life and failure history eventually drives a replacement or retirement decision.

Asset Installed
Asset Operated
Preventive Maintenance
Failure / Condition Change
Spare Consumption
Repair / Replacement
Life & Failure History
End-of-Life / Obsolescence
Replacement Planning
Retirement / Disposal
Division 21 — maintenance & failure records Divisions 01–05 — maintenance execution Division 22 — spares & asset lifecycle control

Principle: the required spare shall be available, identifiable, serviceable and traceable when the AGL asset requires maintenance.

Spare-Part Status Control

A simple controlled inventory status keeps unserviceable parts out of the usable-spares pool.

StatusMeaning
ServiceableAvailable for issue
ReservedAllocated to a specific requirement
Inspection RequiredAwaiting technical inspection
DamagedNot available for service
RejectedNot approved for use
ObsoleteNo longer approved / supported
ExpiredShelf-life requirement exceeded, where applicable

Rule: damaged, rejected, obsolete or expired parts must be clearly segregated from serviceable inventory to prevent accidental issue of a defective spare.

The 34 Topics

Grouped by function — click any topic to expand what it covers.

A

Spare Parts Management

12 topics
MNT-SPL-001Critical Spare Identification
Identify Spares Whose Unavailability Could Cause
  • Extended equipment downtime
  • Significant AGL service disruption
  • Delayed corrective maintenance
  • Emergency restoration delay
  • Difficulty restoring safety-critical equipment
MNT-SPL-002Minimum Stock-Level Definition
Minimum Level Should Consider
  • Consumption rate
  • Supplier lead time
  • Criticality
  • Failure frequency
  • Emergency requirement
  • Availability of substitute components
Acceptance / Record

Rule: the minimum level should be documented rather than left to individual judgement, and replenishment initiated once stock falls below it.

MNT-SPL-003Maximum Stock-Level Definition
The Objective Is To Avoid
  • Overstocking
  • Unnecessary capital tied up in inventory
  • Excessive shelf-age
  • Obsolescence
  • Storage congestion
Acceptance / Record

Review: maximum stock should be periodically reviewed against actual consumption.

MNT-SPL-004Spare-Part Inventory
Maintain An Inventory Showing
  • Part number
  • Description
  • Manufacturer
  • Model
  • Quantity available
  • Minimum stock
  • Maximum stock
  • Storage location
  • Condition
  • Shelf-life status
  • Reserved quantity
MNT-SPL-005Spare-Part Identification
Record, Where Applicable
  • Part number
  • Manufacturer
  • Model
  • Description
  • Specification
  • Rating
  • Revision
  • Batch / lot number
  • Serial number
Risk / Attention

Rule: avoid storing unidentified components in the usable-spares inventory.

MNT-SPL-006Spare-Part Storage
Storage Should Protect Parts From
  • Moisture
  • Dust
  • Excessive temperature
  • Mechanical damage
  • Contamination
  • Unauthorized use
Acceptance / Record

Layout: parts should be organized so that identification and retrieval are straightforward.

MNT-SPL-007Shelf-Life Monitoring
Where Applicable, Monitor
  • Manufacturing date
  • Shelf-life
  • Expiry date
  • Storage condition
  • Inspection date
Acceptance / Record

Priority: particularly important for parts or materials whose condition may deteriorate during storage.

MNT-SPL-008Spare-Part Inspection
Periodically Inspect Stored Spares For
  • Physical damage
  • Corrosion
  • Packaging deterioration
  • Moisture
  • Identification problems
  • Shelf-life status
  • Missing components
MNT-SPL-009Damaged-Spare Segregation
Recommended Status Categories
  • Serviceable
  • Inspection required
  • Damaged
  • Rejected
  • Obsolete
  • Expired
Risk / Attention

Purpose: prevents accidental issue of defective parts.

MNT-SPL-010Spare Consumption Tracking
Track
  • Date
  • Asset
  • Work order
  • Part number
  • Quantity
  • Reason
  • Technician
  • Remaining stock
Acceptance / Record

Use: this information supports future stock-level decisions.

MNT-SPL-011Spare Reorder Control
When Stock Reaches The Minimum Level
  • Identify shortage
  • Verify current requirement
  • Initiate procurement
  • Track purchase status
  • Receive spare
  • Inspect incoming item
  • Update inventory
  • Return stock to controlled level
MNT-SPL-012Emergency Spare Availability
The System Should Establish
  • Emergency-spare list
  • Storage location
  • Quantity
  • Responsible person
  • Issue procedure
  • After-hours access where required
  • Replenishment requirement
Acceptance / Record

Link: connects directly with the Division 05 emergency maintenance response.

B

Equipment Lifecycle

12 topics
MNT-SPL-013Asset Installation Date
Where Available, Also Record
  • Commissioning date
  • Manufacturer
  • Model
  • Serial number
  • Initial condition
MNT-SPL-014Asset Age Tracking
Review Age Together With
  • Failure history
  • Repair frequency
  • Condition
  • Obsolescence
  • Spare availability
Acceptance / Record

Reminder: age is tracked from the applicable installation / commissioning reference.

MNT-SPL-015Operating-Hour Tracking
May Support Assessment Of
  • Component life
  • Maintenance requirements
  • Failure trends
  • Replacement planning
Acceptance / Record

Scope: tracked where the equipment provides meaningful operating-hour information.

MNT-SPL-016Failure-Frequency Tracking
Track
  • Number of failures
  • Failure type
  • Failure interval
  • Repeat failures
  • Corrective actions
Risk / Attention

Trigger: increasing failure frequency can become a trigger for detailed lifecycle assessment.

MNT-SPL-017Repair-Frequency Tracking
Repeated Intervention May Warrant
  • Condition assessment
  • Refurbishment
  • Increased monitoring
  • Replacement assessment
MNT-SPL-018Component-Life Tracking
Track The Service Life Of
  • LED modules
  • Lamps
  • Drivers
  • Fans
  • Filters
  • Control modules
  • Connectors
  • Other maintainable components
Acceptance / Record

Use: where actual replacement history is available, use it to establish the component's observed service life.

MNT-SPL-019Replacement-History Tracking
Maintain
  • Original component
  • Replacement date
  • Replacement component
  • Reason for replacement
  • Part number
  • Failure / condition information
Acceptance / Record

Link: this should connect directly with Division 21 records.

MNT-SPL-020End-of-Life Assessment
Consider
  • Age
  • Condition
  • Failure frequency
  • Repair frequency
  • Spare availability
  • Technology status
  • Manufacturer support
  • Cost of continued maintenance
MNT-SPL-021Obsolescence Assessment
Identify Equipment / Components That Are
  • No longer manufactured
  • Difficult to procure
  • No longer supported
  • Supported only with obsolete components
  • Dependent on unavailable technology
Risk / Attention

Risk: obsolescence can become a lifecycle risk even when the equipment is still functioning.

MNT-SPL-022Replacement Priority
Priority Bands
  • P1 — Critical: high consequence, poor reliability / support
  • P2 — High: increasing failures or difficult spares
  • P3 — Planned: aging asset, planned replacement
  • P4 — Monitor: serviceable, no immediate need
Acceptance / Record

Note: final classification should follow the airport's approved asset-management criteria.

MNT-SPL-023Asset Retirement
Before Retirement
  • Confirm replacement / decommissioning requirement
  • Identify asset
  • Record final condition
  • Remove from active inventory
  • Update asset register
  • Remove associated maintenance status
  • Record retirement date
  • Initiate disposal process where applicable
MNT-SPL-024Asset Disposal Record
Record
  • Asset ID
  • Equipment
  • Serial number
  • Retirement date
  • Disposal date
  • Reason
  • Disposal method / reference
  • Responsible authority
  • Final status
Acceptance / Record

Purpose: preserves the asset's lifecycle history even after disposal.

C

Critical AGL Spares

10 topics
MNT-SPL-025Runway Fixture Spares
Potential Controlled Spare Categories
  • Complete fixture
  • LED / lamp module
  • Lens
  • Prism
  • Gasket
  • Connector
  • Secondary lead
  • Mounting hardware
  • Frangible components
Acceptance / Record

Sizing: exact stock quantity should be established from the asset population, failure history and supplier lead times.

MNT-SPL-026Taxiway Fixture Spares
Maintain Applicable Spares For
  • Taxiway edge fixtures
  • Taxiway centreline fixtures
  • Clearance-bar fixtures
  • Exit-light fixtures
  • Rapid-exit taxiway fixtures
MNT-SPL-027PAPI Spares
Potential Categories
  • Optical components
  • LED / lamp assemblies
  • Power-supply components
  • Connectors
  • Cable leads
  • Gaskets / seals
  • Control / electronic components where applicable
MNT-SPL-028Sign Spares
Potential Categories
  • LED modules
  • Drivers
  • Power components
  • Connectors
  • Internal wiring
  • Fuses / protection components
  • Gaskets
  • Mounting hardware
MNT-SPL-029CCR Spares
Potential Categories
  • Fans
  • Filters
  • Control components
  • Protection components
  • Display / control components
  • Interface components
  • Power components
Acceptance / Record

Note: critical CCR spares should be established according to the installed manufacturer / model and airport requirements.

MNT-SPL-030Isolation-Transformer Spares
Maintain Appropriate Stock / Control For
  • Complete isolation transformers
  • Approved connector components
  • Secondary leads
  • Associated accessories
Acceptance / Record

Note: requirements should consider circuit configuration and installed ratings.

MNT-SPL-031Connector Spares
Track
  • Connector type
  • Part number
  • Rating
  • Manufacturer
  • Quantity
  • Storage condition
Risk / Attention

Rule: avoid mixing visually similar but technically different connector types.

MNT-SPL-032Cable-Joint Spares
Control
  • Cable compatibility
  • Joint type
  • Manufacturer
  • Part number
  • Shelf life where applicable
  • Storage condition
MNT-SPL-033ALCMS Spares
Potential Categories
  • Interface modules
  • PLC-related components
  • Communication components
  • Power supplies
  • Network equipment
  • HMI / display components
  • Control modules
Acceptance / Record

Note: maintain critical control-system spares according to the installed architecture.

MNT-SPL-034Control-System Spares
Record
  • Hardware type
  • Part number
  • Firmware / software compatibility where applicable
  • Configuration requirements
  • Storage status
Acceptance / Record

Note: control-system spares should be matched to the installed system architecture and configuration.

Replacement Priority

How an asset's replacement priority is set once condition, age and support risk are combined.

Priority 1

Critical

High operational / safety consequence combined with poor reliability or support.

Priority 2

High

Increasing failures, deterioration, or difficult spare availability.

Priority 3

Planned

Aging asset requiring a planned, budgeted replacement.

Priority 4

Monitor

Serviceable asset with no immediate replacement requirement.

Note: the actual classification should follow the airport's approved asset-management criteria — these bands are a proposed management framework.

Lifecycle Risk Indicators

Combinations that should trigger an engineering review of the asset.

Indicator CombinationTriggers
High age + increasing failuresReplacement assessment
High repair frequency + high maintenance costLifecycle review
Obsolete equipment + poor spare availabilityPlanned replacement
Critical asset + long supplier lead timeIncrease critical spare strategy
Repeated component failureFailure / root-cause investigation
End-of-life asset + limited manufacturer supportPriority lifecycle planning

Spare Issue & Replenishment Flow

The twelve-step sequence that carries a spare from a maintenance defect through to an updated inventory record.

1
Maintenance Defect

A defect requiring a spare is identified.

2
Spare Required

Confirm the specific part needed.

3
Check Inventory

Verify availability and status.

4
Issue Spare

Release the part for the work order.

5
Record Consumption

Log date, asset, quantity, technician.

6
Update Stock

Reduce recorded quantity available.

7
Check Minimum Level

Compare remaining stock to the minimum.

8
Reorder If Required

Initiate procurement below minimum.

9
Receive

Accept the incoming shipment.

10
Inspect

Verify condition and specification.

11
Store

Place in the controlled storage location.

12
Update Inventory

Close the loop on the stock record.

Frequently Asked Questions

Quick answers about spare parts & asset lifecycle maintenance, based on the topics in this division.

8 QUESTIONS
Q1What is Spare Parts & Asset Lifecycle Maintenance?

It is the spares-management and asset-lifecycle control layer of the handbook. It connects maintenance with practical questions: what spare is required, how much should be stocked, whether it is available, how it is stored, and when an asset should be replaced or retired.

Q2What does Division 22 of the AGL Maintenance Handbook cover?

Division 22 (Spare Parts & Asset Lifecycle Maintenance) contains 34 topics in three groups: Group A Spare Parts Management (12 topics), Group B Equipment Lifecycle (12 topics) and Group C Critical AGL Spares (10 topics).

Q3How does Division 22 differ from Divisions 01 to 05?

Divisions 01 to 05 decide what maintenance to perform. Division 22 decides whether the parts exist to perform it, and tracks the asset across its full life from installation to retirement and disposal using the maintenance and failure records.

Q4What is the key principle for AGL spares?

The required spare shall be available, identifiable, serviceable and traceable when the AGL asset requires maintenance.

Q5What spare-part status categories are used?

Serviceable (available for issue), Reserved (allocated to a specific requirement), Inspection Required, Damaged, Rejected, Obsolete, and Expired where a shelf-life requirement applies. Damaged, rejected, obsolete or expired parts must be clearly segregated from serviceable inventory to prevent accidental issue of a defective spare.

Q6What is the spare issue and replenishment flow?

Twelve steps: maintenance defect, spare required, check inventory, issue spare, record consumption, update stock, check the minimum level, reorder if required, receive, inspect, store, and update inventory.

Q7How is replacement priority set?

Priority 1 Critical is high operational or safety consequence combined with poor reliability or support; Priority 2 High is increasing failures, deterioration or difficult spare availability; Priority 3 Planned is an aging asset needing a budgeted replacement; and Priority 4 Monitor is a serviceable asset with no immediate replacement requirement. These bands are a proposed management framework, and actual classification should follow the airport's approved asset-management criteria.

Q8What lifecycle risk indicators should trigger an engineering review?

High age with increasing failures triggers a replacement assessment; high repair frequency with high maintenance cost triggers a lifecycle review; obsolete equipment with poor spare availability triggers planned replacement; a critical asset with a long supplier lead time means increasing the critical-spare strategy; repeated component failure triggers a failure or root-cause investigation; and an end-of-life asset with limited manufacturer support triggers priority lifecycle planning.

Go Further

Don't Just Stock the Part. Manage the Lifecycle.

Spare parts and asset lifecycle maintenance is more than keeping a shelf stocked.

Build the technical knowledge to understand obsolescence risk, criticality-based stocking, asset condition tracking, and how lifecycle planning keeps the airfield resilient over decades.

Stock with purpose. Plan the lifecycle. Protect availability.