AGL Maintenance Handbook

A strategy-wise reference for keeping an installed AGL system serviceable — not how to install it, and not what to verify on it, but what maintenance to actually perform, when, and why. Organized across 25 divisions spanning maintenance strategy, asset type, and the planning and records that hold the programme together.

All 25 divisions (835 topics) are published.

How this differs from the other references: the SOP Library documents procedure — how to install, test, or repair. The Inspection Handbook documents verification — what to check on equipment already in service. This handbook documents the maintenance decision itself — which strategy applies (preventive, corrective, predictive, condition-based, or emergency), and the specific task that strategy calls for on every AGL asset.

835 topics published25/25 divisions complete
25
Divisions
835
Topics
5
Maintenance Strategies
25
Divisions Published

Five Maintenance Strategies

Every maintenance topic in the handbook is driven by one of five strategies. The strategy sets the trigger, the timing, and how the work gets authorised and closed.

01

Preventive

Calendar / Interval

Scheduled, routine work — cleaning, tightening, alignment, and functional checks — performed regardless of condition to prevent failure.

MNT-PRV-001Runway Edge Light Preventive Maintenance
02

Corrective

Defect-Triggered

Repair or replacement once an inspection, failure, or abnormal condition has confirmed a specific defect.

MNT-CRR-001Failed Lamp Replacement
03

Predictive

Trend-Based

Condition and performance data tracked over time — insulation resistance, CCR output, LED degradation — to forecast failure before it happens.

MNT-PRD-004CCR Output-Current Trending
04

Condition-Based

Assessment-Driven

Work scoped to the asset's actual measured condition rather than a fixed interval — physical, environmental, and performance state decide what's justified.

MNT-CBM-001Fixture Condition Assessment
05

Emergency

Immediate

Rapid-response work for critical AGL failures affecting runway or approach availability — distinct in urgency, authorisation, and reporting from routine corrective work.

MNT-EMG-001Runway Circuit Failure Response

Runway Light Preventive Maintenance

Preventive work on the main runway lights follows the interval-driven approach described above. These are the three runway circuits most often scheduled first.

Runway Edge Lights Preventive Maintenance

Scheduled cleaning of lenses, checking of fixture mounting and alignment, connector and seal checks and functional checks along the runway edge circuits, before faults develop.

Runway Centreline Lights Preventive Maintenance

Routine inspection of inset fixtures, lens condition, sealing and fixing, and functional checks of the centreline circuits, including after heavy-wheel traffic and pavement works.

Threshold Lights Preventive Maintenance

Scheduled checks of threshold and wing bar lights: cleaning, alignment, colour and output checks, connector condition and circuit function.

Maintenance Record Flow

Every maintenance topic in the handbook follows the same record, from what triggered the work through to what closes it out.

1Trigger
2Strategy
3Plan
4Execute
5Verify
6Record
7Close

Browse by Division

Divisions 01–05 cover the five maintenance strategies. Divisions 06–20 cover equipment-, asset- and interface-specific maintenance. Divisions 21–25 cover documentation, spares, testing, planning, and audit. All procedure pages are now published; each card below shows the number of topics covered.

Division 01

Preventive Maintenance

PRV

The routine, calendar-driven backbone of the handbook — cleaning, tightening, alignment, and functional checks on every AGL asset.

Published · 40 topics
Division 02

Corrective Maintenance

CRR

Repair or replacement work triggered once an inspection, failure, or abnormal condition has confirmed a defect.

Published · 34 topics
Division 03

Predictive Maintenance

PRD

Condition- and trend-based forecasting — insulation resistance, CCR output, and LED performance tracked over time to flag failure before it happens.

Published · 25 topics
Division 04

Condition-Based Maintenance

CBM

Maintenance scoped to actual asset condition rather than the calendar — physical, environmental, and performance state decide what work is justified.

Published · 28 topics
Division 05

Emergency Maintenance

EMG

Rapid-response work for critical AGL failures — distinct from routine corrective maintenance in urgency, authorisation, and reporting.

Published · 30 topics
Division 06

Lighting Fixture Maintenance

FIX

Mechanical, optical, and electrical upkeep of every physical light fixture, independent of where it sits on the airfield.

Published · 35 topics
Division 07

CCR Maintenance

CCR

External, internal, and control-system maintenance for Constant Current Regulators, including performance verification.

Published · 33 topics
Division 08

Isolation Transformer Maintenance

ITX

Routine and corrective maintenance for isolation transformers, plus pit and installation condition checks.

Published · 30 topics
Division 09

Cable Maintenance

CBL

Route, condition, joint, and termination maintenance across the primary AGL cable network, through to testing and restoration.

Published · 33 topics
Division 10

Connector Maintenance

CNX

Inspection, cleaning, and corrective work on L-823 connectors — electrical condition, installation, and protection.

Published · 29 topics
Division 11

Inspection-Driven Maintenance

INS

The direct bridge from the Inspection Handbook into maintenance work — findings, closure, and condition escalation.

Published · 30 topics
Division 12

Asset-Specific Maintenance

AST

Equipment-level service guidance organised by asset type, from runway and taxiway assets through to control systems.

Published · 35 topics
Division 13

PAPI / APAPI Maintenance

PAP

Preventive, corrective, and performance maintenance covering PAPI/APAPI optical and mechanical condition.

Published · 39 topics
Division 14

Airfield Sign Maintenance

SGN

Preventive, corrective, and special maintenance for airfield signage — LED modules, drivers, and structural condition.

Published · 40 topics
Division 15

Cable & Connector Maintenance

CCN

The complete primary cable → joint → transformer → secondary lead → connector → fixture maintenance chain.

Published · 42 topics
Division 16

Earthing & Bonding Maintenance

EBM

Earthing system, equipment bonding, and lightning/surge protection maintenance, with associated testing.

Published · 31 topics
Division 17

ALCMS & Control System Maintenance

ALC

Preventive, corrective, and functional maintenance for control, monitoring, and communication equipment.

Published · 39 topics
Division 18

Approach Lighting Maintenance

APL

Preventive, corrective, and special maintenance across the approach lighting system.

Published · 36 topics
Division 19

Stop Bar & Runway Guard Light Maintenance

SBR

Maintenance specific to stop bar and runway guard light circuits and fixtures.

Published · 24 topics
Division 20

Base Can & Civil Interface Maintenance

BCC

Base can, civil interface, and post-maintenance restoration work at the fixture-to-ground interface.

Published · 30 topics
Division 21

Documentation & Maintenance Records

DOC

Maintenance, testing, and asset records, plus the document control that keeps them traceable.

Published · 30 topics
Division 22

Spare Parts & Asset Lifecycle Maintenance

SPL

Spare parts management and equipment lifecycle tracking, with a dedicated focus on critical AGL spares.

Published · 34 topics
Division 23

Post-Maintenance Testing & Restoration

PMT

The bridge between maintenance and return to service — electrical testing, functional testing, photometry, and restoration.

Published · 33 topics
Division 24

Maintenance Planning & Scheduling

PLN

When, why, and how maintenance work is planned — asset-based prioritisation, work planning, and schedule control.

Published · 35 topics
Division 25

Maintenance Audit & Continuous Improvement

AUD

The management and reliability division — audit, failure analysis, reliability metrics, and continuous improvement.

Published · 40 topics

Frequently Asked Questions

Quick answers about the AGL Maintenance Handbook and how its 25 divisions fit together.

Q1What is the AGL Maintenance Handbook?

It is a strategy-wise reference for keeping an installed AGL system serviceable, organized across 25 divisions that span maintenance strategy, asset type, and the planning and records that hold the programme together. It covers what maintenance to perform, when, and why, not how to install equipment or what to verify on it.

Q2How many divisions and topics does the handbook contain?

It has 25 divisions with 835 topics, and all 25 divisions are published.

Q3What are the five maintenance strategies in the handbook?

Preventive (calendar or interval based routine work), Corrective (defect-triggered repair or replacement), Predictive (trend-based forecasting of failure), Condition-Based (work scoped to the asset's measured condition rather than a fixed interval) and Emergency (immediate rapid-response work for critical AGL failures). The strategy sets the trigger, the timing, and how the work is authorised and closed.

Q4How is the handbook organized?

Divisions 01 to 05 cover the five maintenance strategies. Divisions 06 to 20 cover equipment-, asset- and interface-specific maintenance, such as fixtures, CCRs, isolation transformers, cables, connectors, PAPI, signs, earthing, ALCMS, approach lighting, stop bars and base cans. Divisions 21 to 25 cover documentation, spares, post-maintenance testing, planning and scheduling, and audit.

Q5How does the Maintenance Handbook differ from the SOP Library and the Inspection Handbook?

The SOP Library documents procedure: how to install, test or repair. The Inspection Handbook documents verification: what to check on equipment already in service. The Maintenance Handbook documents the maintenance decision itself: which strategy applies and the specific task that strategy calls for on every AGL asset.

Q6What record does every maintenance topic follow?

Every topic follows the same seven-step record flow: trigger, strategy, plan, execute, verify, record and close.

Q7Which division covers PAPI, airfield signs or CCRs?

PAPI / APAPI maintenance is Division 13, airfield sign maintenance is Division 14, and CCR maintenance is Division 07. Isolation transformers are Division 08, cables Division 09, connectors Division 10, earthing and bonding Division 16, ALCMS Division 17, approach lighting Division 18, stop bar and runway guard lights Division 19, and base can and civil interface Division 20.

Go Further

25 Divisions of Maintenance. One Skill That Ties Them Together.

You have the handbook — preventive, corrective, predictive, condition-based, emergency and asset-specific strategies across every AGL system.

Build the technical knowledge to understand why each strategy exists, how to judge which one a given asset needs, and how to connect maintenance decisions to the wider AGL system's performance and compliance.

Maintain with purpose. Understand the system. Build technical capability.

Build Complete AGL Maintenance Capability
AGL Fundamentals Components Electrical Systems Preventive Maintenance Inspection Testing Photometry Troubleshooting Commissioning

Talk to Precision AGL Academy

Follow the Academy