How do transformers fail?

A series isolation transformer usually fails in one of a few ways — a broken winding, broken insulation, shorted turns or a bad lead — and each shows up differently on the circuit.

LIGHT FITTING SECONDARY ISOLATION TRANSFORMER PRIMARY SERIES CIRCUIT CONSTANT CURRENT FROM THE CCR EARTH / CASE OPEN PRIMARY OPEN SECONDARY LEAKAGE TO EARTH SHORTED TURNS DAMAGED / WET LEAD SHOWS UP AS WHOLE LOOP OUT ILLUSTRATIVE · SYMPTOMS VARY WITH THE FITTING AND THE CCR

Swipe to see the full diagram

primary winding
secondary winding
fault
earth / case
The Fact Fault practice

A series isolation transformer usually fails in one of a few ways. A winding can break (open primary or open secondary), the insulation can break down to earth or between the windings, turns can short together, or the leads and connectors can be damaged or wet. Overheating often goes with several of these.

The effect depends on where the fault is. An open primary breaks the whole series loop and every fitting goes out, while an open secondary normally darkens only its own fitting but leaves a dangerous voltage across its open leads. Insulation faults appear as earth-fault alarms or falling insulation readings, and shorted turns as a hot transformer or a dim fitting. Check the leads and connectors first, then test, and always isolate the circuit under site procedures before touching any lead.

Winding Faults
An open winding stops the current through it, and shorted turns upset the ratio and heat the transformer. See Transformer Continuity and Open Circuit.
Insulation Faults
Breakdown to earth or between windings, often from moisture or damage. See Earth Fault and Insulation Testing.
Lead and Connector Faults
Water, damage or a poor joint at the leads and connectors, a frequent weak point. See Transformer Connection.
Overheating
Follows from shorted turns, an overloaded or open secondary, or poor connections, and shortens the life of the insulation. See Transformer Testing.
Open primaryBreaks the loop: whole circuit out, CCR open-circuit alarm
Open secondaryOne fitting dark; loop keeps running; dangerous voltage on the open leads
Insulation breakdownEarth-fault alarm or low insulation reading
ReferenceFAA AC 150/5340-26 · ICAO Doc 9157 Part 5
Symptoms depend on the fitting, the circuit and the CCR, and several faults can look alike. Confirm with isolation, inspection and testing under the site procedure rather than from the symptom alone.
Entry 27 · Transformer continuity Entry 29 · Transformer maintenance

Frequently Asked Questions

Q1What are the main failure modes of a series isolation transformer?

An open primary winding, an open secondary winding, insulation breakdown to earth or between the windings, shorted turns, and damaged or wet leads and connectors. Overheating often accompanies several of these.

Q2Which failure is the most serious for the circuit?

An open primary. It sits in the series loop, so the current stops for the whole circuit, every fitting goes out and the CCR raises an open-circuit alarm.

Q3Why is an open secondary a concern if the loop keeps running?

Only that fitting goes dark, but the open secondary can develop a dangerously high voltage and overheat the transformer. Treat the leads as live, and find and correct the fault promptly rather than leave it until a routine visit.

Q4What causes insulation breakdown?

Usually moisture in the pit or connector, ageing or damaged insulation and potting, mechanical damage, or overheating. It is found by insulation testing between the primary, the secondary and earth.

Q5Can a transformer be failing without an obvious symptom?

Yes. Shorted turns or slowly falling insulation can run for a while with only a warm transformer, a dim fitting or a falling insulation reading. Regular testing and recording the readings show the trend before it becomes a fault.

Q6What should be done when a transformer is suspected of failing?

Isolate the circuit under site procedures, check the leads and connectors first, then test continuity and insulation to locate the fault. Replace the transformer with the correct rating if it has failed, and record the findings.

Precision AGL Academy

See It. Understand It. Then Learn How to Engineer It.

Recognising an AGL system visually is the first step. The next step is knowing how to design, install, test, commission and maintain them correctly.

Build Practical AGL Engineering Skills

Go deeper with structured training from Precision AGL Academy, covering:

AGL Fundamentals Design & Electrical Engineering Approach Lighting Photometry Installation & Commissioning Maintenance & Troubleshooting

Learn how each light, sign and circuit works as part of a complete airport lighting system, not just as an isolated diagram.

See. Understand. Apply. Engineer.