Study notes — not an approved procedure. These notes explain concepts for learning. Series-circuit AGL equipment can carry lethal voltages, and test values or steps shown here are generic and must not be used as a work method. Always follow your aerodrome’s permit-to-work, isolation/LOTO procedures and the manufacturer’s instructions. Read the full notice ↓
1

THE METHOD: SCOPE, MEASURE, LOCATE, REPAIR, PROVE

AGL troubleshooting is not "light off, replace light". Ask what failed, where, why, what the operational impact is, and how the repair is proved. The chain to follow is CCR, primary cable, isolating transformer, L-823 connector, secondary lead, fixture, lamp/LED/driver/optics, then photometric output.

ObserveIdentifyIsolateMeasureLocateRepairTestVerifyDocument
ScopeLikely domain
One lightLocal: secondary, transformer, connector, fixture
Small cluster / sectionCable, joint, circuit allocation
Whole circuitCCR, control, primary cable, open or ground fault
Several CCRsCommon power or control
Whole airfieldMain power or central control
Random, intermittentConnector, moisture, mechanical, control
Scope first
  • Before touching equipment, decide: one, few, section, circuit, several circuits, airfield
  • Then ask: is there a common source?
  • This is a heuristic, not a substitute for measurement
  • "What evidence would tell these causes apart?" is the best question in any scenario
2

DIAGNOSTIC AND TEST MATRICES

SymptomFirst suspicionEvidence
Whole circuit OFFCCR, control, openCCR output
One light OFFLocal componentSecondary and fixture test
Adjacent lights OFFSection or circuit faultCircuit layout
Ground fault alarmInsulation faultIR, fault location
One light flickersConnector, fixtureLocal inspection
All lights dimCCR or common sourceCurrent, step
One light dimFixture, opticsPhotometry
Fails in rainMoistureIR, pit inspection
Stop-bar conflictInterlock, controlLogic and status
PAPI wrongAiming, opticsAlignment, photometry
ALCMS mismatchMonitoringField vs control comparison
ProblemUseful test
Open conductorContinuity, cable fault locator
Insulation failureIR, approved fault locator
Low outputPhotometry
Wrong aimingAlignment, photometry
Transformer suspicionPrimary and secondary functional tests
MoistureIR plus physical inspection
Stop-bar conflictFunctional and interlock test

Tools: multimeter, insulation tester, clamp meter, continuity set, cable fault locator, thermal equipment, photometer, alignment gear, torque wrench, ALCMS/PLC diagnostics and circuit drawings (AC 150/5340-26C discusses test and fault-location equipment).

3

CCR AND CIRCUIT SCENARIOS

One light OFF, rest of circuit on

The loop is intact, so start at the light assembly, secondary lead, L-823 connector and transformer (secondary winding or a shorted primary), not the CCR or primary cable. An open transformer primary would take the whole circuit down, not one light.

Entire circuit OFF

Check CCR status, input, command, output, circuit current, then ground/open alarms. Do not open every pit. First ask whether the CCR is energizing the circuit.

CCR shows no output

Check input, control, output, then the circuit. Read the alarm first: an open-circuit shutdown points to a break in the loop, an overcurrent or short-circuit trip points to a shorted circuit. Only move to the field once the CCR itself is proved.

CCR output normal, all lights OFF

An open primary gives zero loop current and normally shuts the CCR down, so first prove the reading. Put a calibrated clamp meter on the loop: no current means an open circuit (read the CCR alarm and locate the break); current flowing with every light OFF means the loop is bypassed or the setting is wrong, so check for a short across the loop, a cutout, selector or changeover switch in the wrong position, and the brightness step. “CCR healthy” does not mean the circuit is healthy.

Current abnormally high or low

Do not adjust blindly. Verify the instrument and setting, check alarms and circuit condition, then run approved fault diagnosis. A constant-current system regulates, so a large deviation is itself a clue.

CCR trips immediately

Suspect a short circuit, multiple ground faults or severe insulation breakdown, or an internal CCR or input fault. A single ground fault normally gives a ground-fault alarm rather than a trip, because the series circuit is ungrounded. Do not repeatedly reset; protect, isolate, analyze, locate. If it trips only at the top step (highest voltage), suspect stress-dependent insulation breakdown, excess load or protection settings.

CCR equipment is covered by FAA AC 150/5345-10H.

4

GROUND FAULTS, OPEN CIRCUITS AND INSULATION

Ground fault alarm

Causes: cable insulation, transformer, connector moisture, fixture, joint, water ingress. Follow the approved procedure; do not cycle the circuit repeatedly. A visually normal fixture does not rule out an underground fault. One ground fault may leave the lights ON, but treat it as urgent: a second fault elsewhere can short out part of the circuit or trip the CCR.

Two grounds on a series circuit

Per 26C, current through two insulation breaches can heat or arc, which thermal equipment and a cable fault locator can help localize.

Open circuit

Locations: CCR output wiring, cable, joint, transformer primary, connector. Locate the open, repair, then continuity, IR, energize. After excavation, suspect cable damage and review as-builts.

Rain-related fault

Dry OK, wet low, drying improves: moisture ingress in pit, transformer, connector, joint or fixture. Do dry and wet investigation with IR trends.

ContinuityIRMeaning
PASSFAILConductor continuous, insulation compromised (moisture, cable, joint, transformer, connector)
FAILPASSOpen path: cable break, joint, disconnected component

Insulation resistance is measured with the CCR isolated and locked off, at the test voltage in the approved procedure, and compared with the baseline record. A static IR test is not complete proof of dynamic integrity. An alarm with good IR may be intermittent, moisture-related, multiple-point or a monitor problem; use the approved fault-finding method.

Never open a pit on a suspected live ground fault. Series circuits can develop hazardous voltage: use the approved isolation, lockout/tagout, discharge and test procedure (AC 150/5340-26C safety guidance).
5

TRANSFORMER, CONNECTOR AND CABLE

Transformer

Primary healthy but fixture OFF: test primary, secondary, L-823, fixture. Prove the fault before replacing. A pass on IR does not prove turns ratio or load response. After replacement, check type, wiring, polarity and connections before blaming the new part.

Wrong wattage

A 45 W fitting on the wrong transformer risks abnormal loading and premature failure. Verify fixture wattage, primary current, transformer rating, secondary and connectors.

L-823 connector

Intermittent, hot, dim or repeated failures: insertion, contact, moisture, corrosion, assembly, cable movement. AC 150/5345-26E. Three replacements in six months means find the root cause.

L-824 cable

Low IR: moisture, damage, joint, ageing, termination, wet pit. Isolate, segment as approved, locate, repair, retest. AC 150/5345-7F. A cable locator narrows an open between pits.

Repeated transformer failures in one wet pit point to drainage, sealing or construction, not the transformer. Two circuits failing at one location suggest a local environmental or mechanical cause; one circuit failing at several locations suggests a common source.

6

PHOTOMETRY SCENARIOS AND CALCULATIONS

ON but fails photometry

Current correct, lamp visible, 58% output: not healthy. Look at contamination, optics, ageing, orientation, damage.

Before and after cleaning

68% to 91%: contamination. 68% to 66%: cleaning did not fix it, so continue to lamp/LED, driver, optics, alignment, transformer.

Bright but wrong direction

Not acceptable: intensity, beam and orientation all matter. Check mounting, base, displacement, survey, then retest.

Wrong colour

Colour is its own acceptance parameter: fixture type, lens, LED colour, assembly. Do not start with IR.

One step low

Step 3 low, others fine: suspect CCR step or control, not the fixture.

Unstable or expired

Unstable photometer: check instrument, calibration, geometry, repeat. Expired calibration: no high-confidence final report. Same fixture 90% then 73%: control conditions and repeat.

CalculationResultReading
4,500 of 10,000 cd45%Below ICAO 50% individual-light criterion: unserviceable
7,200 of 10,000 cd72%Close to FAA 70% maintenance target: investigate and trend
30 failed of 40092.5% serviceableStill check distribution
500 total, 20 failed96%Formula: serviceable ÷ total × 100
Output 78%22% degradation100 − output %
Remember
  • One light low: local. Every light low: common source
  • Photometry cannot measure a dead fixture: do visual and electrical diagnosis first
  • Photometry is a snapshot; a new electrical defect can appear afterward
  • New does not mean compliant
7

PATTERN, ADJACENCY AND INTERLEAVING

Serviceability percentage alone never decides operational acceptability. Two adjacent failures can matter more than two isolated ones, and failures in a critical zone matter even when overall figures look high (97% overall with all failures in the inner approach is not acceptable by number alone).

PatternAssessment
● ● X ● ● X ● ●Distributed failures
● ● X X ● ● ● ●Adjacent failures: damaged pattern
A B A B (A fails)Interleaved: distributed dim pattern
A A A A A B B B (A fails)Non-interleaved: large dark section

Check where the failures are, whether they are adjacent, which element is affected, the pattern, and the airport LVP criteria. ICAO low-RVR provisions address adjacent failures for taxiway centreline and stop bars; curved sections have tighter spacing, so a curve failure needs priority checking. A dark section prompts the question: are those lights on the same circuit? Use circuit drawings. See Note 18.

8

LVP, CAT III, STOP BARS AND POWER

RCL failure during LVP

Identify the fixture, check adjacent lights and circuit, assess serviceability, inform ATC/operations, repair, retest, restore. The engineer does not decide alone that CAT III can continue; that belongs to the approved airport procedure.

Stop bar faults

Two failed lamps are not automatically acceptable: check adjacency, local criterion, valid stop indication, interlocking and LVP permission. Treat as critical during LVP.

Stop bar ON and centreline beyond ON

Interlock or control logic failure, potentially more serious than a lamp fault because the commands conflict.

Stop bar will not go OFF, or lead-on will not come ON

Trace ATC command, ALCMS, PLC/controller, output relay, circuit, fixture; for lead-on, selective switching and the centreline circuit.

UPS fault, DG in manual, LVP active

Lights being ON is not enough. Ask what happens if mains fails now: UPS, critical load, DG, ATS, changeover, airport criteria.

3 s outage on CAT III critical lights

Not automatically acceptable. ICAO CAT II/III has 1 s switch-over for several critical elements; take the criterion from the governing design.

A fault at 2 AM during LVP is operationally critical, not routine. Priority: CAT III RCL, stop-bar interlock, whole approach lighting and UPS failure in low visibility are critical; remote single edge light is assess; photometric degradation planned or urgent by criterion; cosmetic and documentation items lower.

9

CONTROL, ALCMS AND PAPI SCENARIOS

ScenarioDirection
ALCMS healthy, field OFFMonitoring error, communication, field failure, feedback; compare status with physical reality
Field ON, ALCMS OFFFeedback, remote I/O, mapping, communication
ALCMS command works, field does notALCMS, communication, PLC, output, CCR/controller, circuit
Wrong runway lights operateMapping, PLC logic, circuit numbering, labelling, wiring, database: a configuration fault
Whole circuit flickersCommon source: CCR, control, supply, loose connection
One fixture flickersLocal connector, transformer, lead, driver
PAPI wrong indicationAiming, unit elevation, optics, displacement, output; electrical or mechanical?
PAPI units at different heightsCheck approved design, survey datum, tolerances
PAPI looks right, photometry failsOptical degradation, beam distribution: appearance is not compliance

Only taxiway lights out: start with the taxiway CCR, circuit, control and cable. Only stop bars out: stop-bar circuit, controller, interlock, communication, field power. Do not blame main power when other lights work.

10

ROOT CAUSE, DOCUMENTATION AND FAULT DATA

Repeated faults at one location call for trend and root-cause analysis. Example 5-why: transformer failed, water ingress, pit flooded, drainage blocked, poor pit maintenance, no scheduled drainage inspection. The root cause is a maintenance system failure, not the transformer.

Fault classes

Control, CCR, primary cable, transformer, connector, secondary, fixture, photometric, mechanical, environmental.

Root-cause categories

Electrical, mechanical, optical, environmental, control, installation, maintenance, component quality.

Frequency analysis

Of 100 faults, 35 transformer and 25 connector: focus on quality, installation and moisture, not just fixtures.

Record

Date, location, fixture and circuit ID, symptom, tests, root cause, action, replacement, retest, photometry, restoration time, technician, approval.

Documentation accuracy is part of troubleshooting. If the drawing says CCR-03 and the field label says CCR-04, verify by as-builts, tracing, CCR output and schedules. Never guess which circuit feeds a light.

After repair: continuity, IR, functional, photometry, control, monitoring, release. Repair fixes the component; restoration proves the system is functional, optically acceptable, controlled and serviceable.

11

SAFETY, MISTAKES AND RULES

Series circuits can be lethal. Never open, disconnect or touch an energised primary cable, connector or transformer, and never leave the loop open while the CCR is energised. Isolate at the CCR, lock out/tag out, discharge, prove dead and work under the airport permit-to-work; do not work alone. Use only correctly rated, calibrated test equipment, and check grounding periodically (AC 150/5340-26C).
Never
  • Reset a tripping CCR repeatedly without diagnosis
  • Assume "lamp OFF = lamp failed"
  • Use uncalibrated instruments for final compliance
  • Ignore grounding or moisture, or bypass interlocks casually
  • Change CCR settings without authorization
  • Close a defect without retest, or treat percentage alone as serviceability
Final 10 rules
  • Never guess; identify scope; check the common source
  • Measure before replacing; follow series-circuit logic
  • Check transformer, connector and fixture together
  • Use photometry for optical problems; check distribution
  • Retest after every repair; document the root cause
12

QUICK REVISION

Symptom to cause
  • Light OFF: CCR, cable, transformer, L-823, fixture
  • Light dim: CCR step, transformer, connector, optics
  • Whole circuit OFF: CCR, control, open or ground fault
  • Low IR: insulation or moisture; no continuity: open circuit
  • Good electrical, low photometry: optics, contamination, alignment
  • Repeated failure: root-cause analysis
References
  • FAA AC 150/5340-26C: maintenance, fault-finding, photometry
  • AC 150/5345-10H CCR, 5345-26E L-823, 5345-7F L-824
Exam & Interview

EXAM / INTERVIEW SCENARIOS

One runway edge light is OFF, others on. First step?

Do not replace the fixture. Check fixture, secondary lead, transformer and L-823, because the rest of the series circuit is working.

CCR current is normal but all lights are OFF. What next?

An open primary gives zero loop current and normally shuts the CCR down, so first prove the reading. Put a calibrated clamp meter on the loop: no current means an open circuit (read the CCR alarm and locate the break); current flowing with every light OFF means the loop is bypassed or the setting is wrong, so check for a short across the loop, a cutout, selector or changeover switch in the wrong position, and the brightness step. CCR health does not prove circuit health.

Two taxiway centreline lights are OFF. Which matters more, count or pattern?

Location and pattern. Adjacent failures can compromise continuous guidance, especially in low visibility.

A CAT III system is 95% serviceable. Operational?

Not automatically. Check failure location, adjacency, critical elements, pattern and the LVP procedure.

Continuity passes, IR fails. Meaning?

The conductor is continuous but insulation is compromised: moisture, cable, joint, transformer or connector.

IR passes, light does not work. Why?

IR shows insulation condition only. Check transformer operation, connector, secondary, fixture, lamp/LED, driver and current.

Photometry 68% before cleaning, 91% after. Conclusion?

Optical contamination was the main issue, not necessarily an electrical failure.

Photometry stays at 66% after cleaning. Next?

Continue diagnosis: lamp/LED, driver, optics, alignment, transformer, electrical condition. Do not keep cleaning.

Output is 4,500 of 10,000 cd. Result?

45%, below 50% of the specified value: individual light photometrically unserviceable under the ICAO criterion, though release also needs system and procedural checks.

Output is 72%. Is it perfect?

No. It is near the FAA 70% maintenance target, so investigate and trend. It is not an overall acceptance limit.

Fault only in rain?

Suspect moisture ingress: pit, joint, transformer, connector, fixture. Use dry-weather tests, wet investigation and IR trends.

Same pit keeps killing transformers?

Root-cause analysis: drainage, sealing, groundwater, pit construction, not repeated replacement.

Stop bar ON and centreline beyond it ON?

An interlock or control logic failure with conflicting commands.

ALCMS healthy but the field light is OFF?

Compare status with reality: monitoring, communication, feedback or a real field failure.

UPS fault during LVP while lights are on?

Ask what happens if mains fails: check UPS, DG, ATS, changeover and LVP criteria.

Which test first for a completely OFF light?

Visual and electrical diagnosis. Photometry cannot measure a dead fixture.

Ultimate scenario: CAT III, LVP, RCL OFF, adjacent RCL OFF, CCR normal, high overall serviceability.

Treat RCL as critical and the adjacent pair as more significant than a count; confirm exact fixtures and circuit; notify ATC/operations per procedure; inspect transformer, L-823, secondary and fixture; repair; run electrical, functional and, as applicable, optical and alignment checks; confirm the pattern and serviceability are restored; record the event and restoration.

Final Study Takeaway

FINAL STUDY TAKEAWAY

The best troubleshooter does not replace components fastest. They find the fault correctly, understand its operational significance, remove the root cause and prove the system is safely restored.

Scope it, measure it, locate it, repair it, prove it, document it.

Field Insight

ENGINEERING & EXPERT NOTES

Say Your Sequence Out Loud

Exam Technique

Scope, measure, locate, repair, verify: stating the order shows structured thinking in an interview and prevents skipped steps on site.

Use Symptoms to Narrow, Not to Conclude

Method

A pattern of dark lights suggests where to look; only measurement confirms what failed.

Ask What Else Could Explain It

Judgement

Before committing to a cause, name one alternative and say how you would rule it out.

Mention Safety Before Touching Anything

Safety

Isolation, permits and proving dead belong in every answer. It is also how a competent technician works.

References

REFERENCES & FURTHER READING

These notes are a study aid. Verify against current sources and your approved site procedures.

#SourceUse it for
1FAA AC 150/5340-26CMaintenance, fault-finding, safety, photometry
2FAA AC 150/5345-10H, 26E, 7FCCR, L-823 and L-824 equipment
3ICAO Annex 14 Vol. IServiceability and adjacency criteria
Go Further

Read the Notes. Close the Gaps. Build AGL Expertise.

Study notes give you the concepts and the exam logic — Precision AGL Academy is where they connect into real technical capability.

Learn how AGL fundamentals, systems, testing, photometry, maintenance and troubleshooting connect through structured technical training, well beyond what a set of notes can cover.

Study smarter. Train deeper. Build technical capability.

Take Your AGL Knowledge Further

Build structured knowledge in:

AGL Fundamentals Asset Management AGL Systems Electrical Engineering Maintenance Inspection Testing Photometry Troubleshooting Lifecycle Management

Talk to Precision AGL Academy

Follow the Academy