THE AGL ENGINEERING CENTRE by Precision AGL Academy · Emergency Backup Power

Emergency Backup Power in AGL

UPS and generator integration for AGL systems. Emergency backup power is not simply about keeping airport equipment energized during a power failure — it must maintain the required availability of critical control, monitoring, communication and lighting functions while preventing unsafe transfer conditions, equipment damage, voltage disturbances and loss of operational control.

SupplyTransferProtectControlRestoreVerify
Overview

What Is Emergency Backup Power in AGL?

Emergency backup power is the electrical arrangement used to maintain selected airport lighting and associated systems when the normal utility power supply is interrupted, degraded or unavailable.

Depending on airport design, the backup architecture may include UPS systems, emergency generators, automatic transfer switches, static transfer switches, battery systems, emergency distribution boards, dual utility supplies, redundant control power supplies, and dedicated backup power for ALCMS, communication systems and selected AGL equipment. The exact arrangement depends on airport operational requirements, electrical architecture and applicable regulations.

The engineering objective: Utility Power Failure → Detect → Transfer → Backup Supply → Maintain Critical AGL Functions → Restore Utility → Controlled Return.

Not "Keep the Lights ON"

The real objective is to maintain the required operational capability of critical airport systems during loss of normal supply — not simply keep equipment energized.

A Complete Chain

Backup power is only as reliable as its weakest link — source, transfer, distribution, CCR, control and monitoring all have to hold together.

Verified, Not Assumed

A generator that starts, a UPS that runs, or an ATS that transfers is not automatically a successful backup system unless the required function is confirmed.

What emergency backup power is made of.

SOURCESUPS and batteriesBridge the interruptionEmergency generatorLonger-term supplyATS, static transferMove the load between sourcesDISTRIBUTIONEmergency distributionBoards for backed-up loadsDual utility suppliesWhere the design has themRedundant control powerFor control equipmentPROTECTED LOADSSelected AGL equipmentCritical lighting circuitsALCMSControl, monitoring, alarmsCommunication systemsLinks and statusUsed when normal utility power is interrupted, degraded or unavailable.The exact arrangement follows airport requirements and the approved design.
Figure 1. Emergency backup power: sources, distribution and the loads they protect. The exact arrangement depends on the airport design.
AGL Visual Encyclopedia: Standby power and UPS Dual feeders PAPI power supply
Why It Matters

Why Backup Power Matters in AGL

Airport lighting is a safety-critical system. Loss of normal electrical power can affect runway lighting, taxiway lighting, approach lighting, PAPI, airfield signs, runway guard lights, stop bars, ALCMS, CCR control, monitoring systems, communication systems and control-room equipment.

The purpose of emergency power is therefore not simply "Keep the lights ON." It is "Maintain the required operational capability of critical airport systems during loss of normal supply."

Runway LightingTaxiway LightingApproach LightingPAPIAirfield SignsStop BarsRunway Guard LightsALCMSCCR ControlMonitoring SystemsCommunicationControl-Room Equipment
The Complete Chain

Emergency Power Architecture

A simplified architecture provides two independent supply paths — normal and emergency — that meet at the transfer arrangement serving the critical AGL loads. The two sources are not normally paralleled: the transfer system connects one at a time. The actual arrangement may vary significantly between airports.

Normal Path
NORMAL UTILITY SUPPLY
MAIN DISTRIBUTION
AGL / AIRPORT ELECTRICAL DISTRIBUTION
CRITICAL LOADS
Emergency Path (Alternate Source)
GENERATOR / UPS / ALTERNATE SUPPLY
AUTOMATIC TRANSFER / STATIC TRANSFER
EMERGENCY DISTRIBUTION
CRITICAL AGL LOADS

Two feeders and a normally open bus tie.

TWO FEEDERS · TWO BUS SECTIONS · ONE NORMALLY OPEN TIE 1 · BOTH FEEDERS HEALTHY TIE OPEN · EACH BUS ON ITS OWN FEEDER FEED A FEED B TIE CCR A CCR B 2 · FEEDER A LOST TIE CLOSED · B CARRIES BOTH BUSES FEED ALOST FEED B TIE CCR A CCR B 3 · BOTH FEEDERS LOST GENERATOR CARRIES BOTH BUSES FEED ALOST FEED BLOST TIE CCR A CCR B GEN WHAT TO CHECK 1 INDEPENDENT FEEDERS different source, different route 2 FULL-LOAD RATING each feeder able to carry it all 3 INTERLOCKED TIE no unplanned paralleling of sources 4 SHARED WEAK POINTS control supply, trench, upstream SCHEMATIC · ONE LINE PER FEEDER · NOT A DESIGN
Figure 2. Dual feeders: if feeder A is lost its breaker opens, the tie closes and feeder B carries both buses.
AGL Visual Encyclopedia: Dual feeders Standby CCR changeover Ring and loop cable arrangement
Core Distinction

UPS vs Generator

UPS and generators perform different functions. A generator is generally intended for sustained backup. A UPS is primarily intended to bridge interruptions and protect critical electronic/control loads. A properly engineered system may use both.

SystemPrimary Purpose
UPSProvides uninterrupted or near-uninterrupted power during supply interruption
GeneratorProvides extended-duration backup power
ATSTransfers load between normal and emergency sources
Static Transfer SwitchProvides rapid transfer between compatible electrical sources
Battery BankStores energy for UPS operation
Emergency Distribution BoardDistributes emergency power to selected loads

Utility and generator feed a changeover switch; the UPS carries control and ALCMS.

STANDBY POWER AND UPS · A SECOND SOURCE AND A BATTERY BRIDGE the changeover moves the load, the UPS carries the controls through the gap PRIMARY SUPPLY utility STANDBY SOURCE engine generator CHANGEOVER moves the load to the standby source CCRs the regulators for the loops SERIES LOOPS UPS battery bridge for the controls CONTROL · ALCMS stays up through the break short break while it changes over 1 2 3 4 5 1 PRIMARY AND STANDBY SOURCES utility supply, plus a generator or other standby source 2 CHANGEOVER moves the load when the primary fails 3 CCRs AND LOOPS the regulators and loops that must stay lit 4 UPS carries control equipment through the gap 5 CONTROL AND ALCMS stay up so the state can be seen and changed TESTED ON LOAD READY WHEN NEEDED Run and transfer tests prove the whole chain NEVER TESTED FAILS WHEN NEEDED Flat batteries, no fuel or a stuck changeover show up in a real outage SCHEMATIC · NOT TO SCALE · FOLLOW ICAO ANNEX 14 VOL. I, THE AUTHORITY AND THE EQUIPMENT MANUALS
Figure 3. Standby power and UPS block schematic for airfield lighting.
AGL Visual Encyclopedia: Standby power and UPS CCR power input Power quality monitoring
Airmen examining the parts of a generator that provides emergency power for airfield lighting
Photo 1. Airmen look at a generator that provides emergency power for airfield lighting at Travis Air Force Base.Credit: U.S. Air Force photo by Chustine Minoda, Travis Air Force Base, Dec. 18, 2020. Public domain (US Government work). Source page
Application

UPS in AGL & Generator Integration

UPS in AGL

UPS systems may be used for equipment such as:

  • ALCMS servers & operator workstations
  • Control systems & PLC systems
  • Communication equipment & network switches
  • Monitoring systems & control panels
  • Instrumentation & selected electronic equipment

Whether an AGL CCR itself is supplied through a UPS depends on the specific airport electrical architecture and CCR design. A UPS should not automatically be assumed suitable for every AGL load.

Generator Integration

An emergency generator may supply selected AGL loads during utility failure. Typical arrangement:

Utility → Main Switchboard → ATS
AGL Distribution

The generator connects via its own breaker to the same ATS. It must be appropriately sized for the connected emergency load and its starting, transient and steady-state characteristics.

Switching Logic

The Automatic Transfer Sequence

The ATS provides controlled transfer between power sources. The actual transfer sequence must follow the approved electrical design and equipment configuration.

01

Normal Operation

Normal source available — load supplied by normal source.

02

Failure Detection

Normal source failure is detected.

03

Generator Start

Generator start command is issued (usually after a short start delay that rides through momentary dips); the generator must reach acceptable voltage and frequency before it is allowed to accept load.

04

Transfer

ATS transfers the load — emergency supply becomes available and AGL critical loads operate from the emergency source.

05

Restoration & Return

Utility is restored; transfer-back is delayed until the utility is confirmed stable, the load returns to the normal source, and the generator runs unloaded for its cool-down before shutting down.

Where the interruption time goes during a changeover.

CHANGEOVER AND SWITCHOVER TIME · HOW LONG THE LIGHTS ARE INTERRUPTED the switch is the fast part — starting the generator and restarting the regulators take the time 15 s CLASS · GENERATOR ROUTE DETECT 1 GENERATOR START AND RUN-UP longest part of the break 2 TRANSFER 3 CCR RESTART 4 MARGIN keep it — do not spend it 5 LIGHTS INTERRUPTED · THIS IS THE SWITCHOVER TIME t = 0 15 s LIMIT mains fails 1 s CLASS · NEEDS A NO-BREAK ARRANGEMENT 1 s LIMIT A GENERATOR CANNOT START IN 1 s — THE LOAD MUST BE CARRIED BY A SOURCE ALREADY RUNNING second independent feed with fast transfer · no-break power system · as the design and the authority require 1 DETECT the loss or poor quality of the supply is sensed, usually with a short deliberate delay 2 GENERATOR START AND RUN-UP cranks, starts and reaches rated voltage and frequency — usually the longest part 3 TRANSFER the changeover switch moves the load to the generator 4 CCR RESTART the regulators re-establish the series-circuit current and the lights come back 5 MARGIN what is left under the limit — absorbs a slow start or an ageing switch TIMED ON TEST WITHIN THE LIMIT, PROVEN A recorded interruption on load shows the whole chain meets its class NEVER TIMED DARK LONGER THAN ALLOWED A slow start or a sticky switch is found only in a real outage SCHEMATIC · NOT TO SCALE · FOLLOW ICAO ANNEX 14 VOL. I, THE AUTHORITY AND THE EQUIPMENT MANUALS
Figure 4. Generator changeover timeline: detect, start and run up, transfer the load, regulators recover.
AGL Visual Encyclopedia: Generator changeover and switch-over time Standby power and UPS Mode changeover
Bridging the Gap

UPS + Generator Integration

A common architecture pairs both systems so the UPS bridges the interval needed for generator starting and transfer, while the generator provides longer-duration emergency power.

Utility
UPS
Critical Electronic Loads
Utility + Generator
ATS
Emergency Distribution → UPS Input

The UPS acts as the short-duration energy bridge while the generator provides longer-duration emergency power, so critical continuity is maintained across the transfer window.

Power Continuity Timeline — UPS Bridging the Generator Start

The UPS carries its critical electronic loads through the interruption while the generator starts and reaches acceptable condition, then the ATS transfers and the generator sustains the load

time → UTILITY OK UTILITY FAILS UPS BRIDGING (BATTERY) generator starting & ramping up ATS TRANSFERS GENERATOR SUSTAINS LOAD UTILITY RESTORED RETRANSFER & GENERATOR COOLDOWN UPS-backed critical electronic loads (ALCMS, PLC, comms) stay continuously supplied
Switch-over time matters for CCRs. A CCR fed from the generator-backed distribution (not from a UPS) is interrupted for the generator start and transfer time. ICAO Annex 14, Volume I, Chapter 8 (Electrical Systems) sets maximum secondary-power switch-over times by runway type: as short as practicable for non-instrument runways, generally 15 seconds for non-precision and Category I approach runways, and 1 second for specified Category II/III lighting elements (15 seconds for the rest). A generator-and-ATS sequence alone cannot meet a 1-second requirement unless a running alternate source, UPS or rapid-transfer arrangement is used. Table numbering and the exact facilities listed vary between editions and State regulations — verify against the current edition and the applicable DGCA/national requirement.
Load Classification

AGL Loads & Criticality

Not every airport electrical load necessarily requires the same level of backup. The actual classification must come from the applicable airport design, operational requirements and regulatory framework.

Critical AGL Loads

Potentially including:

  • Required runway & approach lighting
  • Critical taxiway lighting
  • PAPI & essential signs
  • Stop bars & runway guard lights
  • ALCMS control & critical monitoring systems

Supporting Loads

Potentially including:

  • Control-room equipment
  • Communication systems
  • Network infrastructure
  • Monitoring equipment
  • Selected auxiliary systems
Effect on the System

Backup Power, CCRs, Series Circuits & ALCMS

CCR Behaviour

A power interruption can cause CCR shutdown, restart, output interruption, control-communication loss, alarms and transient loss of lighting. The design must consider CCR input supply → response → restart behaviour → circuit recovery → control recovery, per the manufacturer's requirements.

Series Circuits

The AGL series circuit is specialized; backup power isn't equivalent to supplying a conventional lighting circuit. The chain remains Emergency Source → Distribution → CCR → Series Circuit → Isolation Transformer → Fixture, with every stage's requirements unchanged.

ALCMS

ALCMS must maintain operator control, CCR status, lighting status, alarms, communication, logging and emergency control functions. If ALCMS loses power while lighting stays on, operators can lose visibility — availability of lighting and of control must be evaluated separately.

Emergency Power Reaching the Series Circuit

Emergency power must flow all the way to the fixture — and ALCMS visibility must be tracked separately, since it can be lost even while lighting stays energized

EMERGENCY SOURCE DISTRIBUTION CCR SERIES CIRCUIT ISOL. TRANSFORMER + FIXTURE ALCMS MONITORING Every stage's normal-operation requirements still apply on backup power
Interactive Estimator

UPS Autonomy — Preliminary Sizing

UPS capacity should consider connected load, required autonomy, battery characteristics and ageing, ambient temperature, efficiency, future load growth, starting/transient characteristics and required safety margin. Basic energy relationship: Energy ≈ Power × Time. Actual sizing must account for efficiency, battery discharge characteristics, manufacturer limitations and required reserve.

10 kW
30 min
20%
Load Energy
—
With Margin
—
Indicative UPS Rating
—
This is a preliminary, illustrative estimate only. The energy shown is load energy at the UPS output — battery capacity must be larger to cover inverter efficiency, usable depth of discharge, end-of-life ageing and temperature. UPS ratings are stated in both kVA and kW, so confirm the load power factor. Final sizing must follow manufacturer discharge curves and the applicable project and regulatory requirements.
Energy ≈ Power × Time — Why Both Sides Matter

The energy a UPS battery must store is the area under the load line — a higher connected load or a longer required autonomy both push required capacity up

Power Time ENERGY = AREA Power × Time Connected load (kW) Required autonomy higher load or longer autonomy → larger required capacity Actual battery sizing must add design margin, ageing derating and manufacturer discharge-curve limits
Sizing & Compatibility

Generator Sizing & Source Compatibility

Generator sizing should consider more than connected kW — a generator that appears adequate on connected kW alone may not perform correctly under actual operating conditions. UPS and generator systems must also be compatible; a UPS may reject a generator supply if incoming electrical parameters fall outside its acceptable limits.

Generator Sizing Factors

Real & apparent power, power factor, motor starting loads, transformer inrush, UPS input characteristics, CCR input characteristics (power factor and harmonics can vary with CCR type and brightness step), non-linear loads, harmonic currents, load sequencing, transient response, future load and ambient conditions.

UPS–Generator Compatibility

Frequency and voltage variation, generator waveform quality, harmonics, UPS input current characteristics, generator loading, power factor, synchronization requirements and transfer timing must all be verified — never assumed.

Transfer Equipment Evaluation

Transfer time, source monitoring, interlocking, break-before-make/make-before-break arrangement, voltage/frequency sensing, generator availability, manual and maintenance bypass, and fault conditions.

The transfer system must prevent unsafe simultaneous connection of incompatible sources unless the system is specifically designed for synchronized operation.

Electrical Quality

Power Quality, Batteries & Fuel

Power Quality

Important parameters: voltage, frequency, voltage unbalance, harmonic distortion, power factor, transients, voltage dips, voltage interruptions and frequency stability. Poor power quality can affect electronic AGL equipment even while it remains energized.

Battery System Engineering

Battery chemistry, rated capacity, design life, operating temperature, charging voltage, discharge characteristics, monitoring, ventilation, maintenance, replacement interval, terminal connections, protection and enclosure. Condition should be monitored — never assume an old battery still delivers its original autonomy.

Generator Fuel System

Fuel tank capacity, required runtime, fuel quality and contamination, ageing, transfer system, leak protection, tank monitoring, refuelling arrangements and emergency access. Emergency power availability is ultimately limited by the weakest part of the backup system.

Distribution, Earthing & Protection

Emergency feeders should clearly identify normal, emergency, critical AGL, UPS, generator, control, auxiliary and maintenance circuits. Earthing, bonding, neutral management and fault-current paths must also account for the transfer arrangement — incorrect neutral switching or bonding (for example, 3-pole versus 4-pole transfer switching and where the neutral–earth bond is made) can create serious protection problems.

Protection Chain

Protection & Surge Coordination

Emergency generators and UPS systems do not replace surge protection. Protection coordination should be reviewed across the normal and emergency power systems.

Circuit BreakersFusesSurge ProtectionOvercurrent ProtectionEarth-Fault ProtectionUnder/Over-Voltage ProtectionUnder/Over-Frequency ProtectionGenerator ProtectionUPS Protection
Utility
Main Protection
SPD
Distribution
UPS / ATS
Equipment Protection

Lightning and transient protection should be coordinated with the overall AGL surge protection strategy, not treated as a separate system.

Fault Conditions

Emergency Power Failure Modes

Click a failure mode to see its possible result. A structured design and inspection process anticipates each of these before they occur in service.

Generator fails to start

Possible Result

  • No emergency supply available

Generator starts but cannot accept the load

Possible Result

  • Voltage/frequency collapse or generator trip on transfer

ATS fails

Possible Result

  • Load remains on the failed source, or does not return to normal after restoration

UPS battery degraded

Possible Result

  • Reduced autonomy

UPS overload

Possible Result

  • Transfer to bypass or UPS shutdown, depending on design

Fuel unavailable

Possible Result

  • Generator shutdown

Generator frequency unstable

Possible Result

  • UPS rejection or load instability

Control power failure

Possible Result

  • Loss of transfer/control

Communication failure

Possible Result

  • Loss of monitoring or remote control

Incorrect breaker status

Possible Result

  • Unsafe or unavailable supply

Battery charger failure

Possible Result

  • Battery not adequately charged

Maintenance bypass left incorrectly configured

Possible Result

  • Unexpected supply condition

What is lost if one link fails alone.

SUPPLY TO LIGHT · ASK OF EVERY LINK: WHAT IF IT FAILS ALONE? 1 · NO REDUNDANCY 4 SINGLE POINTS FEEDER ALL DARK single supply BUS ALL DARK single bus CCR ALL DARK no spare CABLE ALL DARK single circuit A LIGHT ONE LIGHT not a single point 2 · REDUNDANCY ADDED, CABLE SINGLE 1 SINGLE POINT LEFT: CABLE 2 FEEDERS NO EFFECT two supplies BUS + TIE NO EFFECT two sections CCR + SPARE NO EFFECT changeover CABLE ALL DARK still single A LIGHT ONE LIGHT not a single point 3 · LOOKS REDUNDANT, FAILS TOGETHER 1 HIDDEN: SHARED TRENCH 2 FEEDERS ALL DARK one shared trench BUS + TIE NO EFFECT two sections CCR + SPARE NO EFFECT changeover 2 CIRCUITS HALF LIT interleaved A LIGHT ONE LIGHT not a single point WHAT TO CHECK 1 TRACE THE CHAIN supply to light, link by link 2 ASK WHAT IF what goes dark, and for how long 3 FIND COMMON CAUSE shared trench, control supply, UPS 4 REMOVE, REDUCE, ACCEPT and write down which, and why SCHEMATIC · ONE CHAIN SHOWN · NOT A RISK ASSESSMENT
Figure 5. Single point of failure analysis, with and without redundancy.
AGL Visual Encyclopedia: Single point of failure analysis Network redundancy ALCMS failure flow
Diagnostic Sequence

Backup Power Troubleshooting

A structured troubleshooting sequence traces the supply chain rather than jumping straight to the alarmed equipment.

01

Confirm the normal source condition.

02

Confirm the emergency source condition.

03

Check generator availability.

04

Check UPS status.

05

Check ATS status.

06

Check emergency distribution breakers.

07

Check ALCMS alarms.

08

Check CCR input supply.

09

Check CCR operation.

10

Verify AGL circuit operation.

11

Confirm actual lighting performance.

12

Record the event and corrective action.

Do not troubleshoot only the equipment that shows the alarm. "ALCMS shows CCR unavailable" does not necessarily mean CCR failure — the cause could trace back through utility failure → ATS issue → emergency distribution issue → CCR input loss → ALCMS alarm. Alarm → Trace Supply → Verify Transfer → Verify Equipment → Verify Output → Verify System.
Verification

Testing: Generator, UPS & ATS

Testing frequency and acceptance criteria should follow the applicable project, airport, manufacturer and regulatory requirements.

Generator Testing

Start sequence, voltage build-up, frequency, ATS operation, load transfer and acceptance, stability, alarms, protection, battery charger, fuel system, emergency stop, return-to-normal sequence, cool-down and shutdown.

UPS Testing

Input/output voltage, frequency, battery status, charging and autonomy, alarms, bypass operation, transfer operation, overload response, communication, monitoring and event logging.

ATS Testing

Normal → Emergency and Emergency → Normal transfer, source sensing, generator start signal, transfer command, interlocking, breaker operation, transfer indication, alarms, manual operation and bypass arrangements.

SystemTest Area
GeneratorStart, voltage, frequency, load
UPSOutput, battery, autonomy, alarms
ATSTransfer and return transfer
DistributionBreakers, protection, identification
CCRInput supply and restart
ALCMSControl, monitoring and alarms
AGLLighting operation
PAPI / SignsOperational availability
CommunicationContinuity
MonitoringEvent and fault recording

Testing in six stages, with a failed-test loop.

HOW REQUIREMENTS TRAVEL INTO TESTING 1 REQUIREMENT LIST Requirements that must be proved by measurement or operation OUTPUT: TEST ITEMS 2 TEST PLAN Test type, method, instruments and acceptance criteria OUTPUT: TEST PROCEDURES 3 PREPARE Calibrated instruments, isolation, permits and safe access OUTPUT: READY TO TEST 4 CARRY OUT TESTS Factory, site and commissioning tests OUTPUT: MEASURED RESULTS 5 EVALUATE Compare each result with its acceptance criterion OUTPUT: PASS, RETEST OR NON-CONFORMANCE 6 RECORD & CLOSE Signed records, matrix updated, items closed OUTPUT: TEST RECORDS FEEDBACK LOOP A failed test goes to investigation and repair, then back to retest; the acceptance criterion is never changed without formal approval. CRITERIA FIRST · THEN PREPARE, TEST, EVALUATE AND RECORD SIMPLIFIED SEQUENCE · FOLLOW YOUR SITE PERMIT AND ISOLATION PROCEDURE
Figure 6. Testing requirement flow. Frequency and acceptance criteria follow the project, airport and manufacturer requirements.
AGL Visual Encyclopedia: Testing requirement flow Load testing Test documentation
Bringing It Together

Commissioning & Acceptance Testing

A backup system should be commissioned as an integrated system, not as independent equipment.

UTILITY FAILURE
DETECTION
GENERATOR START / UPS RESPONSE
TRANSFER
EMERGENCY DISTRIBUTION
CCR AVAILABILITY
ALCMS AVAILABILITY
AGL LIGHTING OPERATION
MONITORING
UTILITY RESTORATION → CONTROLLED RETURN
Acceptance Testing Sequence

Document Review → Visual Inspection → Equipment Verification → Electrical Testing → UPS Testing → Generator Testing → ATS Testing → Integrated Transfer Test → AGL Functional Test → ALCMS Verification → Defect Rectification → Re-Test → Final Acceptance.

Functional Verification Points
Runway LightingTaxiway LightingApproach LightingPAPIAirfield SignsStop BarsRunway Guard LightsCCRsALCMSControl-Room IndicationAlarmsCommunication

Eight stages of commissioning.

COMMISSIONING SEQUENCE · IN WHAT ORDER PASS · RECORD · HOLD · THEN THE NEXT STAGE 1 PRE-COMMISSION Installation checked Circuit tests done Records ready HOLD: ready to energize 2 ENERGIZATION Controlled switch-on Steps raised in turn Readings watched HOLD: stable on all steps 3 FUNCTIONAL Each light and control Steps and alarms Local and remote HOLD: works as designed 4 INTEGRATION Circuits run together Interlocks proven Fault behaviour HOLD: system agrees 5 ALCMS LINK Control signals Status feedback Failure handling HOLD: command = response 6 PAPI Aiming and settings Glide path angle Flight check if required HOLD: angles confirmed 7 SIGNS Legends correct Brightness steps Control and status HOLD: signs correct 8 ACCEPTANCE Records reviewed Key tests witnessed Certificate signed HOLD: owner accepts A STAGE FAILS CORRECT · RE-TEST · REPEAT ALL EIGHT PASSED READY FOR SERVICE SCHEMATIC · STEPS SHORTENED · NOT TO SCALE
Figure 7. Commissioning sequence, from pre-commissioning to final steps.
AGL Visual Encyclopedia: Commissioning sequence Final acceptance Pre-commissioning
Performance, Not Just Power

Backup Power & Photometry

Photometry may become relevant when emergency operation affects lighting output — different CCR behaviour, reduced available intensity, incorrect intensity selection, voltage instability, fixture performance changes and control-system configuration differences can all appear during emergency operation.

The question is not only "Are the lights ON?" It is "Do the required lighting systems provide the required performance in the emergency operating condition?"

Reliability & Records

The Reliability Chain & Event Logging

AGL reliability depends on the complete chain: Power Source → Transfer System → Distribution → CCR → Series Circuit → Transformer → Connector → Fixture → Control → Monitoring. A failure anywhere in this chain can reduce system availability.

Records the System Should Maintain
Power Failure & TimeGenerator StartUPS OperationATS TransferAGL ResponseAlarmsCCR ResponseRestoration of UtilityReturn TransferGenerator ShutdownAbnormal ConditionsMaintenance Actions

Historical records can help identify repeated power-quality or reliability problems.

Ongoing Readiness

Preventive Maintenance

Track routine inspection items for each part of the emergency power system. Emergency systems require planned maintenance because they may remain unused for long periods.

UPS

Battery condition
Connections
Cooling
Alarms
Bypass
Charger
Output
Event logs
0 / 8 complete

Generator

Engine
Battery
Fuel
Coolant
Lubrication
Exhaust
Starting system
Control panel
Protection
Output
0 / 10 complete

ATS

Contacts
Mechanical operation
Source sensing
Control logic
Indications
Interlocks
Transfer operation
0 / 7 complete

After Major Events

Lightning
Flooding
Fire
Major electrical fault
Generator failure
UPS battery failure
Extended outage
0 / 7 complete

The most dangerous assumption: "It worked during the last test, so it will work during the next emergency." Reliability depends on continuous readiness — the system should not automatically be considered fully restored merely because normal utility power has returned.

An airman performing a 400-hour preventive maintenance inspection on a generator
Photo 2. An airman performs a 400-hour preventive maintenance inspection on a generator at Nigerien Air Base 201.Credit: U.S. Air Force photo by Tech. Sgt. Alex Fox Echols III, Nigerien Air Base 201, Feb. 11, 2020. Public domain (US Government work). Source page
Learn From Others

10 Common Engineering Mistakes

Click a mistake to see why it matters.

Sizing the generator only from connected kW

Why It Matters

  • Ignores starting loads, power factor and transient response

Ignoring UPS–generator compatibility

Why It Matters

  • A UPS may reject a generator supply outside its acceptable parameters

Assuming UPS batteries provide rated autonomy indefinitely

Why It Matters

  • Battery ageing silently reduces real-world autonomy

Not testing ATS transfer under controlled conditions

Why It Matters

  • Transfer faults surface for the first time during a real outage

Backup power without defined critical AGL loads

Why It Matters

  • Capacity gets allocated without a basis for what actually needs it

Ignoring CCR restart behaviour

Why It Matters

  • Transfer can trigger unexpected CCR shutdown or restart cycles

Ignoring ALCMS during emergency-power design

Why It Matters

  • Operators can lose visibility of system status during the event that matters most

Ignoring harmonic and power-quality effects

Why It Matters

  • Electronic AGL equipment can be affected even while energized

Failing to document emergency feeder identification

Why It Matters

  • Slows response and increases risk during real emergency operation

Testing equipment but not the complete emergency sequence

Why It Matters

  • Individually-passing equipment can still fail as an integrated system
Design Review

Emergency Power Design Review & Comparison

A design review should ask what loads require emergency power, what requires uninterrupted power, what can tolerate transfer interruption, the required autonomy, generator capacity and starting load, how the ATS and UPS are integrated, what happens to CCRs, ALCMS and communication systems during transfer, how circuits are protected and earthed, the backup operating mode, and how restoration and testing are handled.

Normal PowerEmergency Power
Primary energy sourceBackup energy source
Normal operationAbnormal/emergency operation
Utility dependentGenerator/UPS/alternate source
Continuous availability expectedActivated when normal supply is unavailable
Normal distributionEmergency distribution
Standard operating conditionContingency operating condition
Documentation & References

Documentation, Standards & Operations

Documentation Package

The engineering documentation package may include:

Single-Line DiagramsLoad ScheduleGenerator & UPS DatasheetsBattery ScheduleATS DatasheetProtection SettingsCable & Feeder SchedulesTest & Commissioning RecordsOperating Procedure

Standards & References

Design should be based on the current applicable requirements — exact transfer times, autonomy requirements and critical-load classifications must be verified against project and regulatory requirements, not assumed universally.

ICAO Annex 14, Vol. I — Ch. 8 (Electrical Systems)ICAO Doc 9157, Part 5 (Electrical Systems)National Aviation RegulationsDGCA RequirementsAirport Electrical StandardsGenerator (ISO 8528) · UPS (IEC 62040) · ATS (IEC 60947-6-1)Fire & Life-Safety RequirementsManufacturer Requirements
Coordinating With Airport Operations

Emergency power testing must be coordinated with airport operations — operational impact, ATC coordination, maintenance windows, NOTAM requirements where applicable, system isolation, test personnel, safety precautions, restoration procedure and an emergency rollback plan. The authorized airport/AIS function determines whether a NOTAM is required. Engineering testing must never unintentionally create an unsafe operational condition.

After an Event

Incident Analysis

After an unexpected power event, work back through the chain rather than stopping at the first failed component.

01

What failed, and why did it fail?

02

Did the backup system start, and did transfer occur?

03

Did the UPS maintain continuity, and did CCRs remain available?

04

Did ALCMS remain operational, and which AGL systems were affected?

05

How long was availability reduced, and what corrective action is required?

End-to-End View

Engineering Workflow & Complete Chain

Emergency Power should never be treated as a separate electrical system — it is part of the complete AGL operational reliability chain.

Engineering Workflow

Define Critical Loads → Determine Required Availability → Select Backup Architecture → Calculate Loads → Size Generator → Size UPS → Design ATS → Design Emergency Distribution → Coordinate Protection → Integrate CCR → Integrate ALCMS → Test Equipment → Test Transfer → Test Complete AGL Response → Document → Maintain.

Complete Emergency Power Chain

Utility Supply → Main Distribution → Normal AGL Supply → Utility Failure → UPS / Generator Response → Automatic Transfer → Emergency Distribution → CCR → AGL Series Circuit → Isolation Transformer → AGL Fixture → ALCMS Monitoring → Operational Verification.

Final Workflow

Define → Design → Size → Integrate → Protect → Test → Transfer → Verify → Maintain → Restore.

Verification Checklists

Inspection & Commissioning Checklists

Work through each checklist to track readiness before signing off an emergency power system.

Design

Approved emergency-power design available
Critical-load schedule approved
Single-line diagram verified
Generator sizing verified
UPS sizing verified
ATS arrangement verified
0 / 6 complete

Installation

Equipment installed correctly
Cables identified
Earthing completed
Protection installed
Control wiring verified
0 / 5 complete

Testing

Generator tested
UPS tested
ATS tested
Integrated transfer tested
CCR response verified
ALCMS response verified
AGL operation verified
Restoration verified
0 / 8 complete

Documentation

Test reports completed
Defects closed
Re-test completed
As-built drawings updated
O&M documents received
Final commissioning report completed
0 / 6 complete
The Core Principle

The Most Important Emergency Power Principle

Emergency backup power is successful only when the complete critical system remains operational, controllable, protected and verifiable during loss of normal power.

A generator that starts but cannot accept the load is not a successful backup system. A UPS that operates but has degraded batteries is not a reliable backup system. An ATS that transfers but causes CCR or control-system instability is not a successful transfer system. And an AGL system that remains electrically energized but cannot provide the required operational function is not necessarily a successful emergency-power outcome.

Normal power supplies the airport. Emergency power protects operational continuity. UPS provides continuity through interruption, generators provide sustained backup, transfer systems manage source changeover, and AGL control and monitoring ensure the lighting system remains operationally visible and controllable.

The engineering objective is not simply Power Available. It is: Power Available → Correct Transfer → Stable Supply → AGL Operational → Control Available → Monitoring Available → Performance Verified.

Test Your Understanding

Quick Knowledge Check

Q1. What is the real engineering objective of emergency backup power in AGL?

A. Keep every airport load energized at all times
B. Minimize generator fuel consumption
C. Maintain the required operational capability of critical airport systems during loss of normal supply
D. Reduce the number of circuit breakers in the distribution board

Q2. What role does a UPS typically play alongside a generator?

A. It replaces the need for a generator entirely
B. It bridges the interruption while the generator starts and transfer occurs
C. It only supplies runway edge lights
D. It eliminates the need for an ATS

Q3. Why can an ALCMS losing power be a serious problem even if the lighting itself stays on?

A. Operators can lose visibility of system status even though the lights remain operational
B. It automatically shuts down the generator
C. It has no operational consequence
D. It only affects billing systems

Q4. Why can a generator-and-ATS arrangement alone fail to meet a 1-second switch-over requirement?

A. An ATS cannot sense a utility failure
B. Generators cannot supply series circuits
C. CCRs reject any generator supply
D. The generator needs time to start and stabilise, so a UPS, running source or rapid-transfer arrangement is needed

Four ideas the quiz tests.

1 THE OBJECTIVEMaintain the required operationalcapability of critical systems2 THE UPS ROLEBridges the interruption whilethe generator starts and transfer occurs3 ALCMS POWERIf control loses power, operators can losestatus visibility though lights stay on4 1-SECOND LIMITSGenerator and ATS alone may be too slow:add a UPS, running source or rapid transferNot every load stays energized: the aim is the capability that must continue.Verify the actual performance; do not assume it.
Figure 8. Key points behind the quiz questions.
Explore More

Explore More AGL Engineering

ENGINEERING

AGL Design & Electrical Engineering

Layout, series circuits, CCR sizing, transformers, cable design and control.

Open AGL Design →
VERIFICATION

AGL Testing & Inspection

Electrical testing, functional checks and acceptance procedures across the AGL system.

Open Testing & Inspection →
DEPLOYMENT

AGL Installation & Commissioning

From installed equipment to a fully commissioned, verified AGL system.

Open Installation & Commissioning →
CONTROL

ALCMS

The control system that supervises changeover to backup power.

Open ALCMS →
PROTECTION

Surge Protection & Lightning Mitigation

Protecting standby generators and transfer equipment from transients.

Open Surge Protection →
EQUIPMENT

Constant Current Regulators

The load the backup supply must keep energised.

Explore CCR Engineering →
PERFORMANCE

AGL Photometry

Confirming output is maintained after a power transfer.

Open AGL Photometry →

Keep the System Alive When Utility Power Isn't.

From UPS and generator integration to ATS logic, load criticality, sizing, testing and commissioning — explore the complete AGL knowledge base for emergency power engineering.

Keyword Reference

Airfield Lighting Battery Backup, Emergency Repair & Emergency Procedures

Airfield lighting battery backup

Airfield lighting battery backup supplies critical loads through a UPS while the generator starts and takes over. It bridges the short gap in supply and keeps control systems, monitoring and selected lights running. Battery capacity, autonomy and condition checks are set by the project design and the manufacturer.

Airfield lighting emergency repair

Airfield lighting emergency repair restores failed lights or circuits quickly after a fault or storm. Teams make the work area safe, find the fault, repair or replace the part, test the circuit and tell the operations staff. Temporary measures, such as portable lights, should be recorded and replaced with a permanent repair.

AGL emergency procedures

AGL emergency procedures set out what staff do when power or lighting fails: who is called, how loads are transferred, what is reported to air traffic control and how the airfield is checked afterwards. They should be written, rehearsed and kept up to date with the airport's operating procedures.

A technician repairing a generator for an emergency airfield lighting system
Photo 3. A technician fixes a generator for an emergency airfield lighting system (EALS) at Jalalabad Airfield.Credit: U.S. Air Force photo by Senior Airman Justyn M. Freeman, Jalalabad Airfield, July 1, 2016. Public domain (US Government work). Source page
AGL Engineering Hub

Explore the AGL Engineering Knowledge Hub

Fundamentals

Standards & Compliance

Runway, Taxiway & Approach Lighting

Surface Movement & Safety

PAPI

Electrical Engineering & Power

Photometry & Testing

Maintenance, Inspection & Safety

Resources, Documentation & Careers

FAQ

Frequently Asked Questions

Q1What is emergency backup power in AGL?

It is the electrical arrangement used to maintain selected airport lighting and associated systems when the normal utility supply is interrupted, degraded or unavailable. Depending on the airport it may include UPS systems, generators, automatic or static transfer switches, battery systems, emergency distribution boards, dual utility supplies and dedicated backup for ALCMS and communication systems.

Q2Why does backup power matter for airfield lighting?

Airport lighting is safety-critical. Loss of normal power can affect runway, taxiway and approach lighting, PAPI, airfield signs, stop bars, runway guard lights, ALCMS, CCR control, monitoring, communication and control-room equipment. The purpose is not simply to keep the lights on but to maintain the required operational capability of critical systems during loss of normal supply.

Q3What is the difference between a UPS and a generator in AGL?

A generator is generally intended for sustained, extended-duration backup. A UPS is primarily intended to bridge interruptions and protect critical electronic and control loads. A properly engineered system may use both.

Q4Is a CCR powered from a UPS?

It depends on the specific airport electrical architecture and CCR design. A UPS should not automatically be assumed suitable for every AGL load. UPS systems may be used for ALCMS servers and workstations, PLC and control systems, communication equipment, network switches and monitoring systems.

Q5How does an automatic transfer switch (ATS) sequence work?

The normal source fails and is detected, a generator start command is issued (usually after a short delay that rides through momentary dips), and the generator must reach acceptable voltage and frequency before accepting load. The ATS then transfers the load to the emergency source. When utility power returns, transfer-back is delayed until the utility is confirmed stable, the load returns to the normal source and the generator runs unloaded for its cool-down before shutting down.

Q6How do a UPS and a generator work together?

A common architecture pairs them so the UPS bridges the interval needed for generator starting and transfer, while the generator provides the longer-duration emergency power. Critical continuity is maintained across the transfer window.

Q7What is the difference between an ATS and a static transfer switch?

An ATS transfers load between the normal and emergency sources. A static transfer switch provides rapid transfer between compatible electrical sources. The actual transfer sequence must follow the approved electrical design and equipment configuration.

Q8What switch-over times does ICAO Annex 14 set for secondary power?

ICAO Annex 14, Volume I, Chapter 8 sets maximum switch-over times by runway type: as short as practicable for non-instrument runways, generally 15 seconds for non-precision and Category I approach runways, and 1 second for specified Category II/III lighting elements (15 seconds for the rest). A generator-and-ATS sequence alone cannot meet a 1-second requirement unless a running alternate source, UPS or rapid-transfer arrangement is used. Table numbering and facilities vary between editions and State regulations, so verify against the current edition and the applicable DGCA or national requirement.

Q9Is a generator that starts automatically a successful backup system?

Not by itself. A generator that starts, a UPS that runs or an ATS that transfers is not automatically a successful backup system unless the required function is confirmed. Backup power is only as reliable as its weakest link across source, transfer, distribution, CCR, control and monitoring.

Q10What happens when utility power is restored?

The return should be controlled rather than immediate. Transfer-back is delayed until the utility is confirmed stable, the load returns to the normal source, and the generator runs unloaded for its cool-down before it shuts down.

Field Insight

Engineering & Expert Notes

Size Autonomy for the Real Load, Not the Nameplate
UPS

Measure or calculate the actual connected load, include ageing and temperature effects on batteries, and record the assumptions so the autonomy figure can be checked at a later date.

Test the Transfer Under Load
Transfer

A generator that starts on a no-load test may behave differently when the CCRs and controls are connected. Include the complete transfer sequence in periodic tests.

Fuel Quality Is a Common Hidden Failure
Generator

Stored fuel degrades and tanks collect water. Include sampling and tank checks in the plan so the set does not fail when finally needed.

Know What the Switch-Over Interruption Means for Each Load
Interruption

CCRs, controls and monitoring respond differently to a short break. Confirm that each recovers cleanly and in the intended order.

Check Power Quality, Not Just Presence of Voltage
Quality

Harmonics, voltage and frequency excursions from a backup source can upset sensitive equipment. Monitor these during commissioning and at periodic tests.

Keep the Test Log Where Operations Can See It
Records

Backup power is only credible if its test history is visible. Record dates, loads, durations and any defects, and follow up findings.

Precision AGL Academy

Understand AGL. Build Your Engineering Skills.

You now understand how emergency and backup power keep AGL systems operating through a mains failure — from standby generation to changeover and testing.

Take the next step with Precision AGL Academy.

Learn AGL Step by Step

Build your knowledge through structured technical learning covering:

AGL Fundamentals Components Electrical Systems Design Photometry Testing Troubleshooting Maintenance

Move from understanding how AGL works to developing the practical knowledge needed to analyse, operate and maintain complete AGL systems.

Understand the system. Build the knowledge. Apply the engineering.